Transfer Molding to Facilitate Repairs

Slides:



Advertisements
Similar presentations
LHCb Pedestal Assembly Peter Cooke. Peter Cooke 28 Feb - 1 March VELO PRR2 LHCb Pedestal Assembly Feet to Base Assembly Paddle Preparation Assembly.
Advertisements

Measuring and Layout Tools
Injection Molding Dr.Apiwat Muttamara.
Fabricating Techniques and Practices
James Rasmussen.  Original dash was made from sheet metal, foam, and vinyl  Was too heavy for its purpose  Didn’t offer standard gauge sizes  Didn’t.
เทคโนโลยีการสร้างอุปกรณ์จับยึด
ULTIMATE PORTABLE WORKSTATION Produced by Gavin Weyrich.
By Asaad Mohammad Automation and Mechatronics Lead Teacher
TOOLING. WHAT IS REQUIRED OF THE TOOL? support weight of the part support weight of the part maintain structural integrity and dimensional stability following.
TWO (2) Installation principles 1. Cabinets need to be installed straight, plumb, and level. 2. The area you are working in is rarely straight, plumb,
How to Build a Hovercraft October Patrick Wenzell How to Build a Hovercraft A Cobb County Technology-Based Integration School Special Thanks to.
Manchester 09/sept/2008A.Falou & P.Cornebise {LAL-Orsay}1 CALICE Meeting/ Manchester Sept 2008 SLAB Integration & Thermal Measurements.
Drill Press. General Safety Wear your safety glasses at all times Take off all jewelry Do not wear loose clothing Make sure you are the only person in.
CONSTRUCTION OF A “LITTLE FREE LIBRARY” Gary Mehlum, pressed into service by wife and UHLS employee Mary Fellows (“When you marry a librarian, you marry.
ICRA Panel System Installation Instructions
Fabrication of Fishtank Platform EAS 199B living with the lab.
A Canadian Hot Tub Factory Tour. You begin with a Quality Lucite Acrylic sheet. The shape is created by loading the sheet into a forming machine, heating.
Prepared by: Barry Sparrow and Sal Ienco Civil/Construction Sault College.
Composite Manufacturing Processes
Design and Manufacturing
ATLAS Pixel Detector February 2003 N. Hartman LBNL 1 Pixel Support Tube PRR: Assembly, Production, Schedule February 2003.
Vertical-Axis Wind Turbine Kang Zheng Aaron Peterson Mohd Ramjis.
G.Barber Tracker Planning & Mechanical Preparation June Tracker Planning & Mechanical Preparation An outline of (known) outstanding work to be carried.
Tutorial: Advanced Assemblies
AUTOMATIC LATHES These are machine tools in which components are machined automatically. The working cycle is fully automatic that is repeated to produce.
Jigs and Fixtures.
General Design Guidelines
Bachelor of Technology Mechanical
Water jacket to air box crack completed Lower bore repair side A2 needs two more pins and finish work.
IBL Mock Up IBL Mock Up MANUFACTURING 2011/04/29 François-Xavier NUIRY Maxence CURDY Andrea CATINACCIO CERN PH/DT/PO 1.
DESIGN AND FABRICATION OF TURNING FIXTURE FOR ELBOW
Rene Herrmann Compounding and Composites. Analyzing composite strength Testometric measurement of a composite specimen is meaningful because lamination.
Who We Are SUBC is a group of undergraduate engineering students from the University of British Columbia Team Goals –Design, build and test a human powered,
Design for Manufacturing Accurate Skin Panels from Fibre Metal Laminates Background Fibre metal laminates (FMLs) as a new hybrid aerospace material has.
Substrate-Paddle-Base Peter Cooke. Peter Cooke 28 Feb - 1 March VELO PRR2 Substrate- Paddle-Base Substrate Production Paddle – Base – Feet Component.
“Building Quality to Customer Satisfaction!”. TOTAL QUALITY MACHINING, INC.
Design Progress Allen Ellis 18-September
VXD Mechanical R&D at the University of Washington H. Lubatti, C. Daly, W. Kuykendall LCRD in conjunction with Fermilab, SLAC.
IPC Assembly and Test Palletization of parts is a standard process in many instances for both test and assembly. This can be achieved using.
Production Decisions Chapter 6 Mr. Higgins. Objectives Identify the need for a plan of procedure Identify the need for a plan of procedure List the steps.
Shear Problem Defined There are no bolts on the inboard side of the coil structure to account for shear forces. Bottom Line: friction alone will not prevent.
ARIES Review, PPPL L. M. Waganer, 4-5 Oct 2006 Page 1 Maintenance and Building Conceptual Approach L. Waganer and R. Peipert The Boeing Company 4 October.
Engineering Graphics with SolidWorks Instructors Name Course Name.
Adrian Garza.  Composites of structural fibers like carbon are used for the frame  Wheels, derailleurs, brakes, and chains, are made with stainless.
LMQXFA Cold Mass Assembly Antonios Vouris Fermilab February 3, 2016.
Monolith Collection and Preparation For soils without restrictive layers Conrad Neitsch USDA-NRCS MLRA Region 9 Staff Temple, TX.
STREET & RACING TECHNOLOGY. SRT brand discussion Videos (SRT) Vehicle Functionality Develop High Tech Strategy World premier GT Vehicle Lighter Weight.
ENM208 INTRODUCTION to MACHINING ANADOLU UNİVERSITY Industrial Engineering Department.
Chapter 12 Replacing Hoods, Bumpers, Fenders, Grilles, and Lids.
SHEET METAL REPAIR & MAINTENANCE
SCROLL SAW CHAPTER 26.
Board Replacement Laminate-Angle/Angle & Lock & Fold
Identification terminology various aircraft hardware
Sit down, get quiet, get ready to play
Step IV PRY Preparation - Contents
Thermoforming Process
Jigs and Fixtures A Basic Look Computer Integrated Manufacturing
Jigs and Fixtures A Basic Look.
Building a Nightstand Woods 1 Final Project Step #1
Louisiana Tech University
Automated abrasive water jet pin cutting system – mark II
BC Technology Education Association
Clamping and Boring Tools
BC Technology Education Association
Slab building.
Engine Top End Construction
US-HiLumi – Shipping Post Assembly Status
BC Technology Education Association
Presentation transcript:

Transfer Molding to Facilitate Repairs Splash Tooling

Daren Hislop F22-F35 Composites E&I 533 CMMXS, Hill Air Force Base

Complex Repairs Example of Hinge Fitting change Main Weapons Bay Door Fitting removal and assembly fixtures

Damaged Hinge Removing Hinge Fitting

Engineering Procedures Holes in the sub structure must be maintained.

How to utilize Transfer Molding to capture hole locations with accuracy Prepare substructure door with aluminum tape (dimple holes). Wax/mold release area. Wet layup any (low shrinkage) resin system and fibers approximately 1/8” thick

How to utilize Transfer Molding to capture hole locations with accuracy Cut a stiffener (wood, hard foam, etc.) profile of door section. Clamp bond stiffener in place. This becomes a reusable profile tool for other doors.

Transfer molding accuracy Defined hole locations Ready for drill template splash

Layup of drill template Can be open molded with (low shrink) resin fiber system Layup approximately 1/8” thick This will replicate door substructure holes and perimeter for drilling new hinge accurately.

Bonding drill guides/Bushings Allows accurate centering of drill angle and location Drill bushings are removeable for next job

Locating new Hinge Fitting on Door as per Engineering specifications and Fixtures Hinge can be liquid shimmed to the door in the locating fixture. Forward and Aft Dimension of Hinge can be scored/marked on the door.

Drilling holes on Hinge Hinge is now removed and composite template attached. Final reaming to be done with new Hinge mounted on door.

Summary Accurate simple replication of existing sub structure holes. Consistent method of maintaining hole integrity. Initial Transfer Molded stiffener is reusable for additional Hinge repairs. Cost effective method, reduction in miss drilled parts scrap and engineering request/support authorizing oversizing fasteners.

Questions? Engineering 533 CMMXS Planning 533 CMMXS Wayne Hillstead 801-586-6040 Bob Ellis 801-586-4779