PANAGIOTIS FARANTATOS(TE/MSC-MNC)* WP3, ESR 4: New Magnet

Slides:



Advertisements
Similar presentations
CIEMAT technological contributions to linear colliders Fernando ToralGandía, 3/12/2005.
Advertisements

DOT 1 January , 1990 DOT 2 July 23 - August 3, 1990.
Chubaka Producciones Presenta :.
2012 JANUARY Sun Mon Tue Wed Thu Fri Sat
23 October 2005MICE Meeting at RAL1 MICE Tracker Magnets, 4 K Coolers, and Magnet Coupling during a Quench Michael A. Green Lawrence Berkeley Laboratory.
P Pathophysiology Calendar. SundayMondayTuesdayWednesdayThursdayFridaySaturday January 2012.
1 Warm Magnets Work Package Status J. Bauche, TE-MSC Technical Meeting, 9th January 2014.
BROOKHAVEN SCIENCE ASSOCIATES Abstract Magnet Design Workshop: Magnet Design and Analysis Charles Spataro, NSLS-II Project NSLS-II is a new 3Gev synchrotron.
LINAC 4 Project L4T/L4Z Design Status J.Humbert / B.Riffaud on behalf of EN-MME design team 1 st September 2011 LINAC4 – BEAM COORDINATION COMMITTEE B.Riffaud.
Mid Term Review Meeting, 26 September 2012P. FARANTATOS1 * The research project has been supported by a Marie Curie Early Initial Training Network Fellowship.
Options for Final Focusing Quadrupoles Michele Modena CERN TE-MSC Many thanks for the contributions of: J. Garcia Perez, H. Gerwig, C. Lopez, C. Petrone,
Status of: CLIC Two-Beam Module Magnets R&D and Procurement 1 Michele Modena, CERN TE-MSC IWLC10, WG8, 21October 2010.
WORD JUMBLE. Months of the year Word in jumbled form e r r f b u y a Word in jumbled form e r r f b u y a february Click for the answer Next Question.
DATE POWER 2 INCOME JANUARY 100member X 25.00P2, FEBRUARY 200member X 25.00P5, MARCH 400member X 25.00P10, APRIL 800member.
CLIC Workshop th -17 th October 2008 Thomas Zickler AT/MCS/MNC 1 CLIC Main Linac Quadrupoles Preliminary design of a quadrupole for the stabilization.
2011 Calendar Important Dates/Events/Homework. SunSatFriThursWedTuesMon January
High Resolution Separator
Consolidation of the Booster Injection Quadrupole Magnets (part 2) A. Aloev 14 th February 2013.
Report from HIE-ISOLDE HEBT WG J.Bauche‎, P.Farantatos‎, M.Fraser‎, B.Goddard, Y.Kadi‎, D.Lanaia‎, D.Nisbet‎, E.Siesling‎, G.Vandoni‎, D.Voulot‎, E.Zografos.
CLIC Stabilisation Day’08 18 th March 2008 Thomas Zickler AT/MCS/MNC/tz 1 CLIC Quadrupoles Th. Zickler CERN.
SBS Magnet and Support Status Robin Wines June 2013.
cern.ch CLIC MEETING (17-Dec-2010) CLIC TWO-BEAM MODULE LAYOUT (short introduction) BE / RF 1.
TEMPORAL VISUALIZATION OF DATA FROM THE FRENCH SENTINEL NETWORK.
July 2007 SundayMondayTuesdayWednesdayThursdayFridaySaturday
Magnet design issues and discussion David Harding for Vladimir Kashikhin 3 April 2005.
Linac4 MAC 29 th January 2008 Thomas Zickler AT/MCS/MNC/tz 1 Magnets for Linac4 Th. Zickler CERN Linac4 Machine Advisory Committee 28 th - 30 th January.
HIE-ISOLDE Design Study Safety and Beam Quality Challenges for the HIE-ISOLDE Frontend Jacobo Montaño (EN/STI/RBS) HIE-ISOLDE Workshop, November 2013 *
Yingshun Zhu Design of Small Aperture Quadrupole Magnet for HEPS-TF
ELENA installation progress F. Butin / ELENA collaboration.
IN THIS Slide show YOU WILL LEARN ABOUT ALL VERSIONS OF "MS OFFICE"
WP15.4 Status March 2017.
High energy beam transport.
Some Design Considerations and R &D of CEPCB Dipole Magnet
Test of a Permanent Magnet Quadrupole Placed in a Dipole Field
Schedule for the FAIR Antiproton Target
Status of HESR 18th March Gießen Dieter Prasuhn.
Procurement, Measurement and Installation of 2 Octupoles for ATF
Testing of SC Magnets Status - November 2010
HIE-ISOLDE HEBT vacuum system
Development of the Canted Cosine Theta Superconducting Magnet
PANDA Collaboration Meeting , BINP Sergey Pivovarov.
EFREMOV INSTITUTE SAINT PETERSBURG RUSSIA
Target and Horn status report
Main magnets for PERLE Test Facility
Pierre-Alexandre Thonet
Dictation practice 2nd Form Ms. Micaela-Ms. Verónica.
McDonald’s Kalender 2009.
McDonald’s Kalender 2009.
13-block rotation schedule
ELENA Magnet Installation Planning
PERMANENT MAGNET QUADRUPOLE FOR THE LINAC 4 CCDTL
McDonald’s Kalender 2009.
III. Correction Dipoles MDG Accessories for all Magnets V. Summary
Problem Gambling Clicks to Opgr.org
Design of Nb3Sn IR quadrupoles with apertures larger than 120 mm
66th ISOLDE Collaboration Committee meeting
McDonald’s calendar 2007.
Strategic Planning Timeline Overview
Teacher name August phone: Enter text here.
The Transformation of A Small Company Into A Golden Legend
Optics Measurements in the PSB
Tropical cyclones movement
February 2007 Note: Source:.
McDonald’s calendar 2007.
IR Beam Transport Status
Habitat Changes and Fish Migration
SAME 15 existing quadrupoles (QFS, QDS, QFL)
2015 January February March April May June July August September
Habitat Changes and Fish Migration
Presentation transcript:

New electromagnets for the HIE-ISOLDE beam transfer lines: Current work status PANAGIOTIS FARANTATOS(TE/MSC-MNC)* WP3, ESR 4: New Magnet HIE-ISOLDE Workshop: The technical aspects, 28th November 2013 * The research project has been supported by a Marie Curie Early Initial Training Network Fellowship of the European Community’s Seventh Programme under contract number (PITN-GA-2010-264330-CATHI) HIE-ISOLDE Workshop, 28-29 November 2013 P. FARANTATOS

Outline HIE-ISOLDE: Magnet requirements Magnets’ status Dipole Quadrupole H/V Steerer Current integration studies Influence of welds in quadrupole’s vacuum chamber bellow Influence of steerer’s stray field on vacuum and instrumentation Conclusions and future work HIE-ISOLDE Workshop, 28-29 November 2013 P. FARANTATOS

The HIE-ISOLDE magnets * Options additional to baseline order 4 + 3* dipoles (TESLA, UK) 24 + 8* quads (ELYTT, ES) 13 + 10* H/V steerers (ANTEC, ES) HIE-ISOLDE Workshop, 28-29 November 2013 P. FARANTATOS

Deflection angle [deg] Dipole Bending radius [m] Deflection angle [deg] Field in centre [T] Integrated field [Tm] Magnetic length [m] 1.8 45 0.11 - 1.14 0.15 - 1.61 1.414 Laminated steel yoke M1400-100A ARMCO end plates Welded tension straps Bronze water connection blocks Pancake coils Detailed in “Magnets” presentation at HIE-ISOLDE HEBT Technical Design Review, 6th July 2012 HIE-ISOLDE Workshop, 28-29 November 2013 P. FARANTATOS

Planning: Dipole 1st beam line Supply Contractual delivery dates Manufacturing file, schedules and samples 13th December 2013 Pre-series dipole 30th May 2014 One series dipole 1st August 2014 Two series dipoles + coils 10th October 2014 Two optional series dipoles 5th December 2014 One optional series dipole 5th January 2015 1st beam line HIE-ISOLDE Workshop, 28-29 November 2013 P. FARANTATOS

Integrated gradient [T] Quadrupole Gradient [T/m] 0.5 - 25 Integrated gradient [T] 0.1 - 5.0 Aperture radius [mm] 25 Magnetic length [m] 0.2 Detailed in “Magnets” presentation at HIE-ISOLDE HEBT Technical Design Review, 6th July 2012 HIE-ISOLDE Workshop, 28-29 November 2013 P. FARANTATOS

Planning: Quadrupole 1st beam line Supply Contractual delivery dates Manufacturing file, schedules and samples 14th October 2013 Two pre-series quadrupoles 14th April 2014 Four series quadrupoles (1st batch) 30th May 2014 Four series quadrupoles (2nd batch) 27th June 2014 Four series quadrupoles (3rd batch) 25th July 2014 Four series quadrupoles (4th batch) 15th September 2014 Four series quadrupoles (5th batch) 13th October 2014 Two series quadrupoles + coils (6th batch) 27th October 2014 Four series quadrupoles (1st optional batch) 24th November 2014 Four series quadrupoles (2nd optional batch) 22nd December 2014 1st beam line HIE-ISOLDE Workshop, 28-29 November 2013 P. FARANTATOS

Integrated field [Tmm] H/V Steerer Integrated field [Tmm] Magnetic length [mm] Physical aperture [mm x mm] Physical length [mm] 9.1 (LINAC) 6 (HEBT) 256 90 × 90 92 Solid steel yoke block (ARMCO) Racetrack coils Bronze water connection blocks Flexible water hoses Detailed in “Magnets” presentation at HIE-ISOLDE HEBT Technical Design Review, 6th July 2012 HIE-ISOLDE Workshop, 28-29 November 2013 P. FARANTATOS

Planning: H/V Steerers Supply Contractual delivery dates Manufacturing file, schedules and samples 7th February 2014 One pre-series H/V steerer 20th June 2014 Four series H/V steerers (1st batch) 8th August 2014 Four series H/V steerers (2nd batch) 29th August 2014 Four series H/V steerers (3rd batch) 19th September 2014 Four series H/V steerers (1st optional batch) 10th October 2014 Four series H/V steerers (2nd optional batch) 31st October 2014 Two series H/V steerers (3rd optional batch) 14th November 2014 1st beam line HIE-ISOLDE Workshop, 28-29 November 2013 P. FARANTATOS

Integration study: Quad bellow Longitudinal welds Relative permeability: 1.15-1.25 Quadrupole center point HIE-ISOLDE Workshop, 28-29 November 2013 P. FARANTATOS

Integration study: Quad bellow HIE-ISOLDE Workshop, 28-29 November 2013 P. FARANTATOS

Integration study: Stepping motor Potential perturbation on DB’s stepping motors’ operation due to steerer’s stray magnetic field HIE-ISOLDE Workshop, 28-29 November 2013 P. FARANTATOS

Integration study: Stepping motor Stray field distribution along stepping motor envelope HIE-ISOLDE Workshop, 28-29 November 2013 P. FARANTATOS

Integration study: Vacuum pump Turbo-pump: Potential perturbation on its operation due to interference with steerer’s stray magnetic field 81 mm 258 mm H/V steerer HIE-ISOLDE Workshop, 28-29 November 2013 P. FARANTATOS

Integration study: Vacuum pump Stray field distribution along vacuum pump’s envelope Field limit for Baxial Upper limits Field limit for Bradial Field component Operational limit of pump Radial field (Br) 3 mT Axial field (Bz) 15 mT Solutions: 1) Move turbo-pump 100mm away 2) Shielding HIE-ISOLDE Workshop, 28-29 November 2013 P. FARANTATOS

Vacuum pump: Shielding proposal Material: 1010 steel Advantages of 1010 steel compared to Mu-metal Higher saturation No need for thermal treatment after machining Less expensive HIE-ISOLDE Workshop, 28-29 November 2013 P. FARANTATOS

Vacuum pump: Shielding proposal Stray field distribution along turbo-pump envelope Field limit for Baxial Field limit for Bradial Safe operation for turbo-pump HIE-ISOLDE Workshop, 28-29 November 2013 P. FARANTATOS

Vacuum pump: Shielding proposal Shielding does not affect the steerer’s field quality HIE-ISOLDE Workshop, 28-29 November 2013 P. FARANTATOS

Conclusions - Future work Magnet manufacturing On schedule so far – however, no margin Longitudinal welds on quad’s bellow Minor influence on quad’s field quality - within tolerances - ongoing DB stepping motors - H/V steerer stray field Field tolerances for stepping motor’s normal operation should be defined Magnetic shielding if necessary Vacuum pump - H/V steerer stray field Steerer’s stray field significantly affects the operation of the vacuum pump Magnetic shielding assures vacuum pump’s undisturbed operation H/V steerer’s field quality is almost intact Integration of magnetic shielding HIE-ISOLDE Workshop, 28-29 November 2013 P. FARANTATOS

THANK YOU FOR YOUR ATTENTION! HIE-ISOLDE Workshop, 28-29 November 2013 P. FARANTATOS