3 COMPONENTS OF MAGNETIC WAVES UP TO 4 kHz

Slides:



Advertisements
Similar presentations
Melting Probe IWF-EXP/ÖAW GRAZ Size: 40 x 40 x 195 mm Mass w/o electronics Calculated: 450g Measured: 350g, 3m tether Main Components Cable.
Advertisements

Test and Assembly Plan Results P09141 Satellite Thermal Heater Controller.
Collaboration Meeting at UCI, April 7-9, 2005 EMI Control System Design Kurt Liewer.
LSU 10/09/2007Drawing a System Diagram1 How to draw a system diagram Project Management Unit #2a.
2 1 Amplifiers. Definition A device which increases the level of a signal from line level to power level. Always the final active component in the signal.
HL-LHC Standards and Best Practices Workshop (11-13 June 2014)
Solar Probe Plus FIELDS Monthly Management Telecom Sep 17, 2012.
Telecom 1 9/17/2012 SPP/FIELDS Solar Probe Plus FIELDS Monthly Management Telecom Sep 17, 2012.
Main task  Development, calibration and operation of spaceborne magnetometers Main research topics 1.Building and test of space magnetometers  Integration.
Selda HeavnerFIELDS iPDR – Antenna Electronics Board Solar Probe Plus FIELDS Instrument PDR Antenna Electronics Board Selda S. Heavner U.C. Berkeley
PACS IBDR 27/ BOLC/BOLA1 BOLC / BOLA SAp/DAPNIA/DSM/CEA C. CARA WE Design Team: A. BOUERE - N. DEVIN - G. DHENAIN - E. DOUMAYROU M. SEYRANIAN -
THEMIS-SCM THM – SCM – CDR – 08-April-2004 in Velizy
1 Ist Virgo+ review Cascina H. Heitmann Alignment: Virgo+ changes.
Laguna Beach, CA March 30-April 1, 2003 PMT HV Base Board Development Nobuyoshi Kitamura SSEC / UW-Madison.
MERMAG-M/MGF MGF-OS MGF-IS MAST-MGF MAST-SC PWI-SC Credit : RISH, Kyoto Univ.
ESA EJSM/JGO Radio & Plasma Wave Instrument (RPWI) Warsaw meeting Lennart Åhlén.
Seminar ON SMART SENSOR Submitted by : SUBIR KUMAR GHOSH Roll No. IN-14/04 Electrical & Instrumentation Deptt. B.E 7th Semester JORHAT ENGINEERING COLLEGE,
18-20 December rd ATF2 Meeting, KEK ATF2 Power Supplies1 ATF2 High Availability DC Magnet Power Supplies By Paul Bellomo, Antonio de Lira, David.
THEMIS Mission CDR -UCB, June 14-18, 2004 Search Coil Magnetometer (SCM) MCDR Alain Roux, CETP-Velizy Co-i: O.Le Contel Technical Manager: B.de la Porte*
THEMIS Mission PDR/CAR 1 UCB, November 12-14, 2003 Search Coil Magnetometer (SCM) Mission PDR/CAR Alain Roux CETP-Velizy Co-i: O.Le Contel Technical Manager:
THEMIS SCM CDR MC VASSAL - 3D PLUS CETP 04/08/ Preamplifiers in 3D Technology EM manufacturing Part list and component Lot Acceptance Tests FM manufacturing.
CMS ECAL End Cap Meeting CERN 18 Oct to 22 Oct ECAL End Cap High Voltage and Fibre Optic Monitoring Systems Progress. Progress on High Voltage and.
Best Practices for CCATS & CJs October 25, 2012 Cindy Hollohan Sr. Manager, Empowered Official Corporate Trade Compliance.
Test-as-You Fly SpaceWire for Solar Probe Plus
1 SXC on SXG Aim: basic agreement about this SXC on SXG by the end of September (formalities may come later) Clarify key technological items Thermal environment.
1 Thermal tests planning for mock-up TM0 Thermal tests planning for CLIC prototype module type 0 May 30th,
SDR 7 Jun Associated Electronics Package (AEP) Curtis Ingraham.
THEMIS INSTRUMENT CDR Peer ReviewSYSTEM- 1 UCB, April 19, 2004 TITLE: Test Flow RFA CODE: UCB-10 REQUESTED BY: Preble SPECIFIC REQUEST: We recommend that.
SWGTemplate- 1 UCB, Nov 15/16, 2006 THEMIS SCIENCE WORKING TEAM MEETING Search Coil Magnetometer (SCM) team Co-i: A. Roux, O. Le Contel Technical Manager(*):
Pixel power R&D in Spain F. Arteche Phase II days Phase 2 pixel electronics meeting CERN - May 2015.
1 BROOKHAVEN SCIENCE ASSOCIATES Power Supply Status George Ganetis Power Supply Status ASAC Review October 22-23, 2009.
BlackBox Sat Critical Design Review Colorado State University-Pueblo April 2, 2004 Greg Barela Jose Segovia Enrique Cornejo.
Dr.F. Arteche EMC DEPFET Project: A general overview.
Cloudland Instruments Hawkeye Electronics Snapshot March 10th, 2016.
Double Star meeting ESTEC 25/26 March Hardware Status Engineering breadboard fabricated to validate the FPGA concept – Using an ACTEL A1280 – Tested.
Double Star Active Archive - STAFF-DWP Data errors and reprocessing Keith Yearby and Hugo Alleyne University of Sheffield Nicole Cornilleau-Wehrlin LPP.
Cluster Active Archive Science User Working Group (CAASUWG) - update Matt Taylor on behalf of CAASUWG.
Cluster Active Archive Status of DWP Data Activities Simon Walker, Keith Yearby, Michael Balikhin Automatic Control and Systems Engineering, University.
Double Star Active Archive - DWP/STAFF 1 Double Star Active Archive STAFF/DWP Keith Yearby and Hugo Alleyne University of Sheffield Nicole Cornilleau-Wehrlin.
Laboratoire de Physique des Plasmas 20 TH CAA CROSS-CAL M EETING CLUSTER-STAFF REPORT O CTOBER 2014 G ÖTTINGEN The STAFF Team Laboratoire de Physique.
WEC meeting TED status and WEC timing.
Cluster Active Archive Status of DWP Data Activities Simon Walker, Keith Yearby, Michael Balikhin Automatic Control and Systems Engineering, University.
THEMIS-SCM SCM – OVERALL RESSOURCES – STATUS versus REQUIREMENTS ItemSpecificationStatus Sensor Bandwith Sensor Sensitivity Up to 4 kHz 1 pT/√Hz at 10.
Double Star Active Archive - STAFF- DWP 1 K.H. Yearby, S.N. Walker, M. Balikhin University of Sheffield.
Fan Assembly Driven by Magnetic Fields
Status of the DSP/ASPOC EM
Double Star: Experiment Activities
FGM CDR FGM Electronics (FGE) Ronald Kroth MAGSON GmbH Berlin Germany.
Calorimeter Mu2e Development electronics Front-end Review
Double Star: Table of Contents
Double Star: Table of Contents
Cluster Active Archive – Wideband data BM2 mode
SCADA for Remote Industrial Plant
Solar Probe Plus FIELDS
Search Coil Magnetometer (SCM) CDR/Peer review CETP-Velizy
THEMIS Mission Assurance
Science Requirements The FGM shall measure DC and low frequency perturbations of the magnetic field  see performance requirements The FGM shall measure.
Double Star Progress Meeting #3 Beijing 2 July, 2002.
EM pre-integration review
The European Contribution to eXTP
ISUAL Associated Electronics Package
SIS100 quadrupole status S. Kostromin, H. Khodzhibagiyan, G. Trubnikov, FAIR 11th MAC, GSI, May,
MIME – Update Report Olivier LE DUFF – 10 May 2012
Systems Engineering Bob Goeke.
Underwater wireless communication
Sheffield team interests
How to draw a system diagram
<Your Team # > Your Team Name Here
The Magnetic Loop Antenna (MLA)
Radio Interface Board Status
Presentation transcript:

3 COMPONENTS OF MAGNETIC WAVES UP TO 4 kHz THE DSP – STAFF/DWP EXPERIMENT 3 COMPONENTS OF MAGNETIC WAVES UP TO 4 kHz COMMON EXPERIMENT PROPOSED BY THE CETP AND SHEFFIELD FOR THE EQUATORIAL SATELLITE ONLY Keith Yearby Bertrand de la Porte TM Hugo Alleyne Nicole Cornilleau-Wehrlin PI SHEFFIELD CETP Bertrand de la Porte – 25/03/2002

THE DSP-STAFF/DWP EXPERIMENT Bertrand de la Porte - March 2002 (IEL connection to be added) STAFF-ant : Search Coil antenna STAFF-amp : Pre-Amplifier STAFF-mwf : Magnetic Waveform STAFF-DWP : Digital Wave Processor STAFF-pwr : Power Supply

DSP-STAFF/DWP Changes w.r.t. CLUSTER BANDWIDTH limitation to reduce the Spin Signal (small RC filters inside the connector) Improvement of the Rad Protection for the Power Supply (+60g) New Design of the Main Electronic Unit STAFF –mwf/DWP Bertrand delaPorte – 25/03/2002

DSP – STAFF/DWP – STATUS & DELIVERABLES   Instrument Cluster name DSP name Status Search Coil Sensor WEC.6 STAFF-ant Cluster EM/Spare, available No EM, no Spare for DSP Pré-Amplifier WEC.7 STAFF-amp Cluster Spare, available Spin Correction needed No Spare for DSP Magnetic Waveform WEC.8/1 STAFF-mwf Cluster Spare, available Wave Processor WEC.9/2 like STAFF-DWP new unit derived from Cluster-DWP An EM will be built Power Supply WEC.11 STAFF-pwr Cluster Spare, available Radiation protection to be improved Possibly EM, no Spare Harness to be manufactured  Integrations with an EM can be performed in Europe but it is not envisaged to send an EM for STAFF- in China Bertrand delaPorte – 25/03/2002

DSP-STAFF/DWP INTERFACE DEFINITION Cluster WEC-EID_B not well adapted to DSP STAFF/DWP EID_B + ECR possible for STAFF –ant, -amp, -pwr NOT for the main electronic box STAFF –mwf/DWP A STAFF/DWP IDS was compiled mid Feb 2002 by Dong Wei Largely corrected by Keith Yearby and Bertrand delaPorte Current issue: 4.0 (?) not complete, but right Configuration Control needed Something like an EID_A is urgently requested !!! Bertrand delaPorte – 25/03/2002

DSP-STAFF/DWP COMMUNICATION Assigned Engineer: DONG Wei no E-Mail – no direct contact But: large number of technical exchange with Lanlan Wll Information obviously exchanged within the Chinese teams Q/R forwarded to Keith with a copy to Roland COMMUNICATION EXISTS but FINAL CONCLUSIONS /AGREEMENTS NOT ALWAYS CLEAR (lack of Control Managment) Bertrand delaPorte – 25/03/2002

DSP-STAFF/DWP COMMUNICATION liste of Questions /Responses in 2001 Q.011022: STAFF – PEACE Interconnections Q.011105: Telemetry, parameters Q.011112: STAFF/DWP characteristics, OBDH i/f, temperature sensors Q.011114: temperature & mechanical characteristics Q.011121: thermal, mechanical, telemetry, harness Q.011130: mechanical, thermal specifications Q.011204: On board monitoring Q.011204: mechanical specifications Q.011212: C.o.G., M.o.I. specifications Bertrand delaPorte – 25/03/2002

liste of Questions /Responses in 2002 Q.020108: STAFF/DWP mechanical specifications Q.020116: Stack mechanical design, boom harness Q.020121: Boom harness, relation with Magson Q.020128: Boom harness, request for LFEW harness Q.020131: Boom harness, responsibilities Q.020211: Common STAFF/DWP IDS – Hua Hzhao, Dong Wei R.020218: STAFF/DWP IDS updates, KHY, BdlP Q.020221: IEL connector, +-6V to DWP, small corrections Q.020224: questions about connectors and parameters R.020226: new revision of the IDS – now issue: 4.0 Q.020228: On board Monitoring Q.020301: request to manufacture the power cable in Europe Q.020310: questions about the Power cable again Q.020313: Control Files for Integrations Q.020318: Request about the boom cable Bertrand delaPorte – 25/03/2002

DSP – STAFF EXPORT REGULATION STATUS LETTER SIGNED BY THE PIs Parts classification completed with a good support from IC and OAW For USA: No ITAR, one component only: A/DC, classified CCL : 3A001.a.2.c One Time Report prepared for BXA to invoque « de-minimis » rule. To be joined in the common request coordinated by IC For EU: No Arms classification, Magnetic Sensor classified as « dual-use » in the EU List: 6A006.b Contacts engaged with the « Service des Douanes » No serious difficulty expected Bertrand delaPorte – 25/03/2002

DSP-STAFF/DWP Outstanding Issues BOOM DESIGN PAYLOAD ACCOMMODATION HARNESS EMC (Grounding Plan requested) THERMAL FUNDING – requested mainly for missions Additionnal funding expected from the CNES for harness AIV/Control Files/TM/TC/HK/Monitoring: presented by DWP Bertrand delaPorte – 25/03/2002

3 BOOMS CONSTRUCTED BY MAGSON - BERLIN DSP-STAFF OUTSTANDING ISSUES BOOM & HARNESS DESIGN 3 BOOMS CONSTRUCTED BY MAGSON - BERLIN REQUEST FROM THE CHINESE FOR PROCUREMENT OF 3 SETS OF CABLE BY STAFF MEASUREMENT AXIS TO BE COORDINATED WITH FGM Bertrand delaPorte – 25/03/2002

DSP-STAFF OUTSTANDING ISSUES Payload ACCOMMODATION – STILL UNKNOWN PREFERRED SOLUTION CURRENT DESIGN Bertrand delaPorte – 25/03/2002