David Kurz, P.E. Lead Wastewater Engineer

Slides:



Advertisements
Similar presentations
Site Location and Design Approval for Domestic Wastewater Treatment Works Mark Kadnuck, P.E. District Engineer – Grand Junction Office Engineering Section.
Advertisements

Agenda Introduction Advisory Circular Changes Consultant Selection Procedures Contract Format and Provisions Methods of Contracting and Allowable Costs.
Berkeley Charleston Dorchester Water Quality Management (208) Program Vonie Gilreath, Regional Planner, BCDCOG Coastal Community Workshop February 7, 2006.
Floyd County Board of Commissioners Special Town Hall Meeting Topic: Update on status of Georgetown WWTP.
2009 ENVIRONMENTAL SEMINAR Boat Bottom Pressure Washing Requirements & General Permit for the Discharge of Stormwater Associated with Industrial Activity.
Alabama Dept of Public Health New Onsite Regulations Overview of Permitting Requirements.
Contractor Management and ISO 14001:2004
Platting Update Orange County BCC January 27, 2015.
6 th Edition CCCWP Management Committee February 15, 2012.
Implementation of Antidegradation Policies for Indiana Waters.
1 PSD - Case #1 Case #1: –A simple cycle natural gas power plant with PTE NOx of 300 tpy and GHGs of 150,000 tpy CO2e receives a PSD permit addressing.
Module 19 STEP 9 Completion of the Feasibility Study Module 19 STEP 9 Completion of the Feasibility Study Civil Works Orientation Course - FY 11.
Team Tech meeting May 22, 2006 State Traffic Commission & DEP Storm Water Permitting State Traffic Commission Permitting & Storm Water Permitting State.
10/1/ Air Quality Permitting Air Quality Committee William D. Willets, P.E. Engineering Supervisor DAQ Permitting Section May 7, 2014.
Reliable Power Reliable Markets Reliable People Performance Targets for the Customer Interconnection Process January, 2008.
Screen | 1 EPA - Drivers for Regionalisation Max Harvey Director Operations Environment Protection Authority Presentation, reference, author, date.
Agency Drafts Statement of Scope Governor Approves Statement of Scope (2) No Agency Drafts: Special Report for rules impacting housing
1 Public Hearing to Consider Proposed Amendments to the Emission Inventory Criteria and Guidelines Regulation for the AB 2588 Air Toxics “Hot Spots” Program.
Renewable Energy at Closed Landfills Workshop: Landfill Post Closure Use Permitting Guidelines January 19, 2010 Daniel Hall, Solid Waste Section Chief.
STATUS OF ECOLOGY’S DRAFT FLOW BLENDING POLICY WATER QUALITY PARTNERSHIP MEETING January 20, 2005.
SITE LOCATION AND DESIGN APPROVAL FOR DOMESTIC WASTEWATER TREATMENT WORKS GARY SOLDANO, P.E. SOUTHEAST REGIONAL OFFICE SUPERVISOR TECHNICAL SERVICES UNIT.
1 Smart Schools Bond Act Completing the Smart Schools Investment Plan
Division Of Early Warning And Assessment MODULE 5: PEER REVIEW.
VI. Developing a VSMP Program General Stormwater Training Workshop.
Connecticut Department of Energy and Environmental Protection.
International Atomic Energy Agency Roles and responsibilities for development of disposal facilities Phil Metcalf Workshop on Strategy and Methodologies.
1 Waste Discharge Authorization Application - British Columbia WG6 Application Process WG Document Review presented by Helga Harlander October x, 2008.
Antidegradation and Alternatives Analysis Mary E. Gardner Regulatory Programs Administrator Littleton/Englewood WWTP Colorado.
Town of Genoa October 6, Agenda Why are we here? Background Capacity Analysis & Facilities Plan Preferred Alternative Board Direction Implementation.
NYS Department of Environmental Conservation Flow Standard Amendment to New York’s Water Quality Standards Regulations Scott J. Stoner Chief, Standards.
REVISIONS TO THE FEDERAL WATER QUALITY STANDARDS RULE JILL CSEKITZ, TECHNICAL SPECIALIST TEXAS COMMISSION ON ENVIRONMENTAL QUALITY.
Redefining the Role of the Overall Responsible Operator May 18, rd Annual Northeastern Ontario Water Works Conference Alex Salewski Ministry of.
COLORADO DEPARTMENT OF PUBLIC HEALTH AND ENVIRONMENT WATER QUALITY CONTROL DIVISION Regulation 100 Update September 2011.
1 Staff Public Workshops Fall 2011 Policy for Siting, Design, Operation and Management of Onsite Wastewater Treatment Systems San Luis Obispo: October.
“702 KAR 4:160, Capital construction process” 1.  To be developed as procedures document for K-12 school construction projects  Allows KDE to update.
Climate: ANPR, SIPs and Section 821 WESTAR October 2, 2008.
Framework for CSO Control Planning
COCE Institutional Review Board Academic Spotlight
HB 328 SITING OF SOLID WASTE MANAGEMNT FACILITIES
PLWG Review 6.9 and the Interconnection process
THE DESIGN CRITERIA FOR WASTEWATER SYSTEMS (30 TAC Chapter 217)
Submittal And Review Of New And Revised Water Quality Standards
Chromium 6 Regulation Corrective Action Plan October 6, 2015
FDA’s IDE Decisions and Communications
Anna Preston Vance, HA of Paris
Vessels and Facilities that are Temporarily Out of Service or Laid-up
Colorado Onsite Regulations …Vision 2010
Illinois School Code and Administrative Rules
FY 2018 Community Capital Pre-Submittal Meeting
FIVE PROJECT PHASES 5C-3 Sun. 8:00-10:00am 21/ 2/2016.
MPO School Transportation Working Group
Virtual Network Meeting: Consolidated Application
Michigan Dept. of Environmental Quality Water Resources Division
Joint WG on Guidance for an Integrated Transport and Storage Safety Case for Dual Purpose Casks TM TM to Produce Consolidated Drafts of the IAEA’s.
Involuntary Resettlement 0P 4.12: Planning Instruments
Groundwater and Waste Management Committee November 9, 2016
Single Event Violations
Van Wert, OH Water and Wastewater Element Training
Colchester Interceptor System Improvements Project
Mayor’s Task Force On Adoption of 2006 I-Codes
Julie Woosley, Division of Waste Management
Controlling Project Cost and Schedule
TRTR Briefing September 2013
Air Quality Permitting
Village of Naples New Sanitary Sewer System Final System Layout
Introduce myself & around table
PUBLIC WATER SYSTEM PLAN and EXCEPTION REVIEW
DEVELOPMENT IMPACT FEES AB 1600 UPDATE
Rule 5/6/13 Conversion to General Permits
Presentation transcript:

SITE LOCATION AND DESIGN APPROVAL FOR DOMESTIC WASTEWATER TREATMENT WORKS David Kurz, P.E. Lead Wastewater Engineer Water Quality Control Division January 17, 2014

Objectives Provide information to facilitate: A better, general understanding of Regulation 22. More efficient interactions between Domestic WWTW owners, their engineers, and the WQCD on Regulation 22

Presentation Format Overview of General Process Not a detailed review of Regulation 22 or Design Criteria Specifics are included in those documents Clarifications of common misunderstandings

REFERENCE DOCUMENTS Colorado Water Quality Control Act (Title 25, Article 8, C.R.S.) Regulation No. 22 (Site Application/Design Review) and others listed in Regulation 43.4(A)(1)(b) Policies Regulation 22 Guidance Document (August 2010) Policy 6 (WQSA-6 Multiple OWTS) Wastewater Design Criteria

Authority and Requirements Water Quality Control Act, 25-8-702 “No person shall commence the construction of any domestic wastewater treatment works or the enlargement of the capacity of an existing domestic wastewater treatment works, unless the site location and the design for the construction or expansion have been approved by the division.” [emphasis added] Fees set in statute [25-8-702(b.7)] – effective July 1, 2007

Domestic Wastewater Treatment Works (DWWTW) Facility with capacity 2,000 gpd or more Includes pumping stations and interceptor sewers Does not include industrial wastewater treatment plants

Structure of Regulation 22 Key Components Definitions (22.2) Core Requirements (22.3 through 22.10) Section 22.3 – Policy considerations Project Specific Sections (22.4 through 22.8) WWTF requirements in 22.4, 22.5, or 22.8, as applicable to situation Pilot Study in 22.8 Section 22.9 - Factors Section 22.10 – In-Kind Replacement Design Review Process (22.11) Basis and Purpose (Starting at 22.12) Regulation 22 Guidance Document provides explanations My background

Evaluate Suitability of Proposed Site [25-8-702(2) C.R.S.] Local review Consider local long-range comprehensive plan and any approved water quality management plan for the area Confirm DWWTW can be managed to minimize potential adverse impact on water quality Encourage consolidation where feasible

Preliminary Effluent Limitations (PELs) Current PELs required: New WWTF and WWTF with capacity changes. Other WWTF modifications may require PELs. Obtain PELs before Site Location Application (incomplete without) PELs developed in the Permits Section of WQCD. Fee is required. Need capacity & discharge point Impacted by changes in: water quality standards stream flows and ambient water quality 18 month “shelf life”

Site Location Application Process Local approval PELs from Permit Section Submit fee, Site Location Application, and Engineering Report Assigned to Reviewer Comment and Response Letters as needed Approval

Notes re: SA Process Local Review / Completeness Emphasis on local review and public notification processes WQCD is not the only agency involved in review Owner must submit SA local authorities and 208 planning agency (if one exists). These agencies may have other requirements and time lines that may impact timing of SA processing. WQCD cannot take action on a site location application until the local review process is completed The Division review begins after receiving fee and complete submittal (e.g., Emergency Operations Plan in §22.4(1)(b)(xiv) to demonstrate owner’s ability to operate and maintain).

Items of Note re: SA Review and Approval Site Location Application Review and Approval Systems evaluated for other water quality requirements Informs the CDPS permit writing (evaluation of proposed treatment, changes to PELs/permit limits, capacity, etc.) Division does not issue concurrent site location and design approvals or verbal approvals. All approvals are issued in writing on CDPHE letterhead. Site Location Approvals good for 18 months to start construction. Site Location Approval is NOT approval for construction. Design approval is required prior to commencement of construction.

The Design Review Process Submit fee and Design Report Two step process for WWTF (new, expansions, modifications) Process Design Report (Division approval) Final Design (Design Engineer approval if streamlined as in section 22.11) Assigned to Reviewer Comment and Response Letters as needed Approval

‘Streamlined Final Design Approval’ Available ‘streamlined design review’ process for WWTFs. Allows ‘certification’ for approval of final design (plans and specifications) as long as specific requirements are met. SA and PDR approvals still required. Specific requirements in section 22.11.

Items of Note re: Design Review Process Small systems with groundwater discharge have closely coordinated SA, design review, and permit development. Design must be consistent with site location approval (organic & hydraulic capacities, SA conditions, etc.). Ensure that all submittals fully address design criteria requirements. Wastewater Design Criteria (Policy WPC-DR-1) has specific requirements for content of Process Design Report and final design. DORA requirements for P.E. signing and stamping engineering reports and drawings must be met. This includes technical documentation and drawings submitted in response to issues letters.

Notes to Speed Review SA and Design Review Submittals Contact Engineering Section Unit Manager to discuss project and clarify information before and after submittals are made. If the Division sends RFI letter regarding a SA or DR submittal, the sooner that the (adequate) response is received, the sooner that the review work can resume and move toward approval. Possible Alternative Technology? Don’t wait until the SA or design submittal. Contact WQCD to discuss. Design approval is still required for each site.

Common Process Pitfalls Not providing all necessary documentation Incompatible SA and DR capacity Alternative Technology Unsubstantiated data Planning Values Non-peer reviewed references Computer model input/output Compliance Points (flow, samples)

Available Resources Regulation 22 Regulation 22 Guidance Document Format Follows Regulation 22 Explains Interpretations Sets expectations for fulfilling requirements Engineering Section Unit Managers North = Douglas Camrud 303-692-3271 South = Amy Zimmerman 303-692-3545

Effective Use of Resources Entities and Consultants May: overlook or not foresee regulatory pitfalls misinterpret regulations not understand full implications of process Open communication with Division Discuss issues with Unit Manager/Review Engineer Set a clear pathway through the regulatory maze Get regulatory interpretations Find best and creative ways to work within regulations

Questions?

Reference Links (Note: Website may be changing …again.) http://www.colorado.gov/CDPHE/WQCD Site Application Forms: Use the link in “Services” box for Facility Design and Approval, then left bar or bottom of the page select Domestic Wastewater Facility Approval page, and the forms are provided under the ribbon for Domestic Wastewater Design Submittal Forms. Regulation 22: Use the link in the top navigation bar to “Boards/Commissions”, Water Quality Control Commission, lower middle box select Current Commission Regulations, Regulation 22 Policies: Use the link in “Services” box for Facility Design and Approval, then left bar or bottom of the page select Domestic Wastewater Facility Approval page, and the policies are provided under the ribbon for Domestic Wastewater Design Policies.