Locational Net Benefit Analysis Working Group

Slides:



Advertisements
Similar presentations
State of Indiana Business One Stop (BOS) Program Roadmap Updated June 6, 2013 RFI ATTACHMENT D.
Advertisements

Project Overview 2010 Programme FA: 14 June 2007 Start: 2 Sept 2007 Completion: 31 June 2011 Budget: €10,155,000 (EU), €155,000 (National)
1 February 10-11, 2015 Revisions to RPS Calculator (v6.0) Workshop.
Making Clean Local Energy Accessible Now Storage Bid Evaluation Protocols Role of CEP, Quantifiable Benefits Stephanie Wang Policy Director Clean Coalition.
California Energy Commission Retail Electric Rate Scenarios: Key Drivers and Structure 2015 Integrated Energy Policy Report California Energy Commission.
Workshop for Proposed EPIC Triennial Plans Investor Owned Utility Programs July 31, 2014.
BASELINE POLICY FRAMEWORK Dina Mackin, CPUC Workshop on Energy Efficiency Baselines April 28, 2015 California Public Utilities Commission1.
Post 2012 Energy Efficiency Planning Schedule: Options and Implications February 16, am - 5 pm CPUC Auditorium.
Residential Sector Market Studies Planning Tool Output of Market Studies Needs Assessment ( study) July 29, 2014 webinar Opinion Dynamics, for California.
California Energy Commission Options for Developing Contingency Mitigation Measures 2015 Integrated Energy Policy Report UC Irvine Campus, Irvine, California.
California Public Utilities Commission CPUC Climate Change Activities Paul Clanon Executive Director August 28, 2007 Presentation to the Senate Energy,
SOUTHERN CALIFORNIA EDISON SM Southern California Edison Company’s Proposal to Participate in Convergence Bidding August 23, 2010.
Energy Networks Association RIIO-ED1 Update for Suppliers December 2012.
Energy Efficiency Forum State of California/Investor Owned Utility Partnership Program Date: September 27, Partnership. A Unique Opportunity.
MTS Working Group October 8, Introduction More Than Smart Mission – Enabling state integrated distribution grid efforts 1.Continue the work of.
Integration Capacity Analysis & Locational Net Benefits Analysis Working Groups Kick-off Meeting May 12, 2016.
Locational Net Benefit Analysis Working Group June 1, am – 3 pm Webinar drpwg.org.
1 Distribution Resources Plan [R ] Locational Net Benefit Analysis (LNBA) and Demonstration Project A (Demo B) Workshop California Public Utilities.
Locational Net Benefit Analysis Working Group June 9, pm – 3:30 pm CPUC Golden Gate Room, San Francisco drpwg.org.
Integrated Capacity Analysis Working Group June 1, am – 12 pm CPUC Hearing Room E drpwg.org.
Info-Tech Research Group1 Info-Tech Research Group, Inc. Is a global leader in providing IT research and advice. Info-Tech’s products and services combine.
Integrated Capacity Analysis Working Group June 9, am – 12 pm CPUC Golden Gate Hearing Room drpwg.org.
1 North Carolina Transmission Planning Collaborative Overview Clay Norris, Chair OSC October 5, 2005.
Joint Energy Auction Implementation Proposal of PG&E, SCE and SDG&E California Public Utilities Commission Workshop – November 1, 2006.
1 Public Teleconference 9/9/2015 Agenda and Schedule RPS Calculator Update: V6.1, Land Use Data, Portfolio Selection.
1 CSFWG – Spectrum of Oversight (f) and Time Requirements (g) subgroup: Meeting 2 – Distribution Planning Group (DPRG) Structure and Time Requirements.
1 Integrated Capacity Analysis Working Group August 31, Frank H. Ogawa Plaza, Oakland, CA drpwg.org.
1 Integrated Capacity Analysis Working Group August 31, Frank H. Ogawa Plaza, Oakland, CA drpwg.org.
Locational Net Benefit Analysis Working Group
Multifamily Working Group Announcement Webinar
Locational Net Benefit Analysis Working Group
CSFWG – Spectrum of Oversight (f) and Time Requirements (g) subgroup:
JU September Stakeholder Engagement Conference Webinar #1
LNBA Subgroup: Avoided Transmission Value
Existing Condition Baseline Programs & Codes and Standards
Integrated Capacity Analysis Working Group
Transmission-Distribution Interface Working Group Meeting
SEIA Perspective on Smart Inverter Functions
Pacific Coast Inter-Staff Collaboration Summit
Locational Net Benefit Analysis Working Group
Consolidated EIM Initiatives from 2017 Roadmap Issue Paper
August ICA Agenda Time Topic 8:00 – 8:15
Market Operations Engagement Group EVSE Working Group – Principles
Integrated Capacity Analysis Working Group
ERCOT – Southern Cross Transmission ROS/WMS Working Group Assignments
La Mesa Climate Action Plan Supplemental Environmental Impact Report Scoping Meeting May 31, 2017.
Mike Jaske California Energy Commission
Locational Net Benefit Analysis Working Group
Integrated Capacity Analysis Working Group
Integrated Capacity Analysis Working Group
Integrated Capacity Analysis Working Group
Integrated Capacity Analysis Working Group
Implementation Strategy July 2002
August LNBA Agenda Time Topic 1:00 – 1:15
LNBA Subgroup: Avoided Transmission Value
Integrated Distribution Planning Process
Introduction to Growth Scenario Working Group
GENERAL SERVICES DEPARTMENT Facilities Management Division PROOF –NM (Process Reengineering & Optimization of O&M Functions for New Mexico) Phase II.
Evaluation in the GEF and Training Module on Terminal Evaluations
Integrated Capacity Analysis Working Group
Rule 21 Working Group 2 IN-PERSON WORKSHOP August 29, 2018
Special MRC – Fuel Security
Project Management Group
SIWG CALL ISSUES 27 AND 28 APRIL 4,
SIWG CALL ISSUES 27 AND 28 APRIL 4,
ICA Methodology Clarifications ICA Working Group 5/18/2016
DER Growth Scenarios and Load Forecasts Working Group
California Transportation Electrification Activities
Commission Direction on Locational Disaggregation
Project Name Here Kick-off Date
Presentation transcript:

Locational Net Benefit Analysis Working Group January 11, 2017 Webinar 1pm-3pm drpwg.org

Purpose To continue discussion on the use of LNBA within the context of the planning use case, and provide a demonstration of the LNBA tool

ICA and LNBA Working Group Background ICA and LNBA WG Purpose - Pursuant to the May 2, 2016, Assigned Commissioner’s Ruling (ACR) in DRP proceeding (R.14-08-013), the Joint Utilities are required to convene the ICA and LNBA WG to: Refine ICA and LNBA Methodologies and Requirements Authorize Demonstration Project A and Project B CPUC Energy Division role Oversight to ensure balance and achievement of State objective (ensure adequate stakeholder representation in consensus statements, keeping WG activities on track with Commission expectations/needs, demonstration project results review, quality control on deliverables) Coordination with both related CPUC activities and activities in other agencies (IDER CSF WG, CEC and CAISO interagency matters, interconnection/Rule 21/SIWG, other proceedings that may impact or be impacted by locational value calculation such as AB 350/IRP and LTPP/TPP/RPS) Steward WG agreements into CPUC decisions when necessary More Than Smart role Engaged by Joint Utilities to facilitate both the ICA & LBNA working groups. This leverages the previous work of MTS facilitating stakeholder discussions on ICA and LBNA topics.

Updated LNBA timeline Wednesday, 1/11: LNBA webinar (1pm-3pm) Friday, 1/13: First round of comments, questions, and recommendations due Thursday, 1/19: First draft of LNBA report circulated Friday, 1/20: Joint ICA/LNBA meeting to review and form recommendations At meeting: decide whether to request report extension past 1/31 If no extension, tentative schedule: Tuesday, 1/24: Second draft of LNBA report circulated Friday, 1/27: Final round of comments due Monday, 1/30: Report finalized Tuesday, 1/31: Report submitted

DRP LNBA Demonstration (Demo B) Q&A on Applications in Distribution Planning and Tool Demonstration January 11, 2017

Agenda Distribution Planning and LNBA/Demo B Review LNBA Use Case Discussion Overview of IOUs’ Proposed Distribution Infrastructure Deferral Framework (DIDF) and Prioritization Process Other Learnings from Demo B related to Distribution Planning LNBA Tool Demonstration

LNBA Use Cases Refresher Heat Map of Potential Optimal Locations Public/Indicative Generic OR DER Specific No DER Costs Included Visual heat map to inform DER providers and stakeholder of locations where DERs may be most valuable. Prioritization for DER Deferral Opportunities Confidential/Commercial DER Costs May Be Included Use LNBA to identify & prioritize locations for deploying DERs (results may be shared with DPAG non-market-participants) Future? Demo B May not include all the same components and inputs as public LNBA LNBA uses outputs of the distribution planning process, but is not part of that process. July 26, 2016 LNBA WG Meeting

Proposed DIDF Process Deferral Framework and IPE/DDAG Review Planning Activities following application of Deferral Framework Develop Assumptions and Scenarios Distribution Planning Assessment Evaluate Conventional Solutions and determine projects Apply Deferral Criteria Incorporate into Future Demand and DER Forecast Non-deferrable Projects Implement conventional solution Planning Prioriti-zation and selection of projects for RFO Projects not selected: Reassess next planning cycle Planning Activities Potentially Deferrable Projects Selected Projects: Develop contingency plan Implement contingency plan (if necessary) LNBA Project list drives Public LNBA output LNBA Activities Selected Projects: Proceed to RFO Develop requirements Launch RFO Receive bids Least-Cost/ Best Fit Valuation & Selection Procurement Select DER Portfolio to meet needs of potentially deferrable projects Monitor Performance RFO and IE/PRG Cost Recovery Mechanism Cost Recovery for Contingency planning Cost Recovery for Selected Portfolio Seek Cost Recovery December 12, 2016 DRP Workshop

Prioritization Process Process occurs following the identification of DER deferrable candidate projects Process will determine which potentially deferrable projects should be sourced immediately via RFO, and which projects may be sourced in a future year Process will consider both Timing of need, as well as Market/Economic Considerations We envision a “Walk – Jog – Run approach” to sourcing for DER Deferrals (expand scope as knowledge increases) Projects not selected for current RFO will be reassessed through next year’s planning cycle Timing Considerations Higher Priority: Timing of Need is soon (less than 5 years out) with a high certainty of need Lower Priority: Timing of Need is further out (greater than 5 years) and is relatively uncertain Market/Economic Assessment Based on market knowledge gained over time Likely to be a location-specific benefit analysis that includes some components of LNBA with additional confidential information December 12, 2016 DRP Workshop

Other Demo B Learnings Relevant in Distribution Planning Different DER Growth Scenarios do impact LNBA results, not always intuitively Increasing DER growth embedded in forecast can increase or decrease locational T&D benefits of incremental DERs Level of DER growth assumed in distribution planning can impact the magnitude and timing of a deficiency, however, not always intuitively Learnings from Load Reduction Requirements Development New methods to create load reduction requirements for distribution upgrade deferrals in Demo B will be refined/evaluated as DERs are increasingly deployed for this purpose. Load reduction requirements to mitigate voltage issues are large and very locational Relatively low cost of voltage support equipment and large amount of load reduction needed in a very small area results in relatively low benefit Using DERs to reduce load to mitigate voltage issues may not be as successful as using DERs to manage reactive power

LNBA Tool Demonstration Public Version of LNBA Tool and Documentation is available here: https://e3.sharefile.com/d-sb2965cf362c48399

Conclusion http://www.drpwg.org