LIU – EVM status and next steps

Slides:



Advertisements
Similar presentations
PSB extraction and transfer kickers 01/10/2014 LIU-PS ABT review1 L. Ducimetière, L. Sermeus.
Advertisements

HIE-ISOLDE (High Intensity and Energy) project Protection of superconducting solenoids MPE work shop – December 14, 2010 G.J. Coelingh TE-MPE-CP.
Status of the PSB 2 GeV Upgrade and the RCS Study SGUI Meeting B. Mikulec, 07 July 2011.
1 1. Some recent views ( ) 2 Linac tunnel
Work Effort in the LHC Injector Complex for the Upgrade Scenarios B. Mikulec Thanks to all the valuable input from the LIU project leaders and LIU work-
LIU-ABT systems: SPS B.Balhan, J.Borburgh, H.Day 20 th November 2015.
ABT LIU Project Review 2015 BI.KSW: Magnet November 20 th 2015 L. Feliciano TE/ABT.
2. Linac Systems 3. Booster Systems 4. Installation commiss. 5. Building, Infrastruct. 2.1 Ion Source and LEBT, R. Scrivens, BE/ABP 2.2 Radio Frequency.
PSB Injection Overview + Specification changes ABT LIU Project Review Wim Weterings.
Planning of Injector Activities for Linac4-to-PSB Connection and LS2 Thanks to all the valuable input from the LIU project leaders and LIU work- package.
Serge Pittet (Work-Package holder) Konstantinos Papastergiou (Work-unit: Sirius converters) CERN Technology Department | Electrical Power Converters 12.
ABT review on the LIU-PSB Systems PSB KSW Magnets September 10 th 2014 L. Feliciano TE/ABT.
Linac4 Project Meeting 1/2011 3/3/2011 M. Vretenar Update on schedule and structure 1.
Each converter 3 racks (fighting for 2?) Access from front and rear of each rack! 56 racks total + 6 racks Ethernet/control Existing RF equipment to be.
Reminder of upcoming milestones For all machines: Nov. 2012:Table of performance parameters Jan. 2013: Baseline activities defined Feb. 2013: Update APT/EVM.
CV Activities for PSB-LIU POPS-B (new MPS for the PSB-LIU) B 245 PSB Demi water cooling plant Stefano Moccia, EN-CV Meeting 07/03/16.
Cost and schedule for ELENA Beam Transfer Systems W. Bartmann, J. Borburgh, E. Carlier, L. Ducimetiere, T. Fowler, M. Hourican, R. Ostojic, L. Sermeus.
PSB extraction and transfer kickers LIU TE-ABT review, 20 November L. Sermeus.
ELENA installation progress F. Butin / ELENA collaboration.
LS1 Day: The Injectors S. Baird EN/MEF Thanks to R Brown, N Gilbert, D McFarlane & V Chohan, IEFC workshop…. LS1 Day: The Injectors 1.
Wim Weterings Remy Noulibos
Report Technical Director Storage-Ring-Installation Completed
Survey on “Chargés de Consignation” Status Update
LIU and TE/VSC activities Status September 2016 LIU-SPS aC coating & flange impedance reduction Paul Cruikshank on behalf of TE-VSC LIU & TE-VSC, 19/9/2016.
Linac4-PSB 160 MeV connection readiness review
TE-EPC internal review of the ELENA project
Update on the Critical Path of the PS Booster Schedule for the EYETS
PSB Lock Out Test, Follow-Up AP. Bernardes-/EN-STI, K
LIU Workpackages 1 August 2014 Edms Id LIU-PM-PP-0030
Brief Status SPS Prototype PSB Prototype Installed in LS1
LIU & MME ACTIVITIES Fabrication Alessandro DALLOCCHIO on behalf of the EN-MME Workshop LIU & MME ACTIVITIES – Fabrication A. Dallocchio.
ELENA installation and commissioning status
LIU Wire Scanner Milestones June 2017
LIU / HL-LHC Cost and Schedule Review
EC Activities Status for LIU September 2017
LIU – EVM status and next steps
AD consolidation activities in LS2
Configuration Management and Layout Database ELENA Project
LIU–PLI report LIU PSB meeting.
News from EVM.
Planning and Installation
EC Activities Status for the LIU
LIU-PSB Status and Outlook
BE/RF-IS Contribution to LIU C. Rossi and M. Paoluzzi
EN/HE activities for LIU
TE-ABT Activities for LS2
Status of the BI Work Package in the LIU-PSB frame
M.Jonker CTC MPO-WG status
PS Booster Hardware Tests & Cold Check-out planning 16th of March 2017
TE/EPC activities for YETS & LS2 LINAC 2-3, PSB, PS & TT2
SPS Planning for the EYETS Meeting 8 (07/12/2016)
Renovation of the 45-year old PS magnets
WPs concerned by L4 connection:
SPS activities during LS2 TE-EPC (Power Converter Group)
J. Bento - Taking over the responsibility of the RF-bypasses
YETS PS + PS SWY + TT2 Facility Coordinator:
EN-HE L2 – PS – PSB – TT2 works during YETS
BE-CO Activities for PSB
East Hall under construction
LIU Wire Scanner Series Costs
K. Foraz on behalf of OSS members
Linac4-PSB 160 MeV connection readiness review ( TE/VSC )
GIS Portal Racks Project
HIE-ISOLDE Project: Planning & Resources
Benoît DAUDIN (GS-AIS-PM – CERN) 22-March-2012
Experimental Areas – LS2 planning
LIU-SPS review for BI (no BWS)
East Hall under construction
Status of the BI Work Package in the LIU-PSB frame
Linac4 Connection Broken Line 07/08/19
Presentation transcript:

LIU – EVM status and next steps Slides prepared by S. Prodon (Friday night) and checked/commented by GP Di Giovanni and K. Hanke LIU-PSB Contribution to overall CtC 2016 budget situation EVM budget trends 5 December 2016

LIU-PSB contribution to overall LIU CtC In 2015 prices Workpackage Description Cost to Completion (Material + M to P) [kCHF] LIU-PSB 5 Power Converters 21,435 LIU-PSB 4 RF systems 13,281 LIU-PSB 9 LINAC4 to PSB transfer line and PSB injection systems 7,752 LIU-PSB 6 Beam  instrumentation 3,755 LIU-PSB 15 Civil Engineering 3,266 LIU-PSB 10 PSB Extraction system and PSB-PS transfer line 3,045 LIU-PSB 3 Magnets 2,956 LIU-PSB 12 Electrical Systems 2,718 LIU-PSB 13 Cooling and Ventilation 2,351 LIU-PSB 8 Vacuum System 1,768 LIU-PSB 14 Installation, Transport and handling 1,015 LIU-PSB 23 Half-Sector Test Project + Stripping Foil Test 900 LIU-PSB 7 Beam Intercepting Devices 803 LIU-PSB 1 Management 536 LIU-PSB 11 Controls 330 LIU-PSB 17 Interlock systems 244 LIU-PSB 21 Commissioning and Operation 145 LIU-PSB 20 Survey 48 LIU-PSB 2 PSB Beam dynamics 35 Total 66,380 groups MCHF EPC 21.6 RF 13.3 ABT 11 BI 3.8 SMB 3.2 MSC 3 EL 2.7 CV 2.4 VSC 1.9 HE 1 STI 0.9 Others 1.7 LIU-PSB : ~37% of the LIU CtC 5 December 2016 Klaus Hanke LIU-Project team meeting

LIU-PSB budget situation per group for year 2016 5 December 2016 Klaus Hanke LIU-Project team meeting

Klaus Hanke LIU-Project team meeting LIU-PSB Budget trends Data extraction : 29.11.16 OK overall OK OK OK have only recently started to look into budgets… not OK but small figure OK 5 December 2016 Klaus Hanke LIU-Project team meeting

Klaus Hanke LIU-Project team meeting LIU-PSB Budget trends Data extraction : 29.11.16 A lot of open commitments on BC 99238 The total charged is still below the budget not OK and large figure The money has been committed but will not be charged to the budget code this year, it includes the orders for the transfer line magnets and yokes/coils for the new INJ and EXT bending magnets. overspending is linked to the advancement of some activities/procurements: Mechanical parts fabrication in RF workshop (including tools) Procurement of raw materials and parts for contracts to be executed in 2017 Procurement of electronic parts Fabrication of vacuum interfaces between cavities and magnets OK not OK and large figure OK not OK and large figure 5 December 2016 Klaus Hanke LIU-Project team meeting

Klaus Hanke LIU-Project team meeting LIU-PSB Budget trends Data extraction : 29.11.16 not OK not OK OK Pour une raison inconnue, la personne qui a rempli le budget 2016 a mis 984 kCHF à la place des 1300 kCHF que j’avais demandé (voir mon mail joint). C’est pour ça que tu vois un dépassement du budget 2016 En outre, l’engagement 2016 de 1180 kCHF n’a pas encore été payé car nous avons quelques différends avec l’entreprise qui bloquent la facturation En ce qui concerne le budget non utilisé, il a été provisionné en 2017 comme tu peux le voir dans le EVM baseline v3 The budget increase for 2016 (charged to budget code) is in the order of 35%. There are two specific jobs (J3025940 and J3032998) with high commitment (60kCHF + 25 kCHF) which will be charged during 2017; in 2016 they appear as open commitment budget. Payment budget = 46 kCHF Charged to budget code = 68 kCHF Open commitment = 85 kCHF 5 December 2016 Klaus Hanke LIU-Project team meeting

Klaus Hanke LIU-Project team meeting LIU-PSB Budget trends Data extraction : 02.12.16 LIU-L2B 5 December 2016 Klaus Hanke LIU-Project team meeting

Klaus Hanke LIU-Project team meeting LIU-PSB EVM status for year 2016 status at the 2016 CSR and on 1st December 2016 2016 CSR 1st Dec. 2016 SV = -3,567 kCHF CV = -164 kCHF SV = -3,054 kCHF CV = +225 kCHF [1] Schedule Variance (SV) = Earned Value (EV) – Planned Value (PV) [2] Cost Variance (CV) = Earned Value (EV) – Actual Cost (AC) 5 December 2016 Klaus Hanke LIU-Project team meeting

EVM status metrics – 2016 CSR In kCHF   Comment Schedule Variance -3,567 BE-BI: Cables and electronics for beam loss monitors not yet delivered (new electronics not yet validated). SV = -500 kCHF. BE-CO: Control infrastructure: hardware for LS1 and LN4 signals not yet purchased. SV = -120 kCHF. BE-RF: Amplifiers, cavities and ancillaries production for RF consolidation not yet started. SV = -500 kCHF. TE-ABT: Foil handling system (mechanical parts & vacuum equipment) not linear: only 2 sets over 8 (WU from Jun-15 to Nov-16); BI.BSW magnets: reporting by unit, not all components received (vacuum chambers, coils, yokes) and assembly not yet started; delays in the purchase of prototype hardware for electronics and controls for kickers. SV = -1,150 kCHF. TE-EPC: Transformer and strip line for booster injection septa converters not yet purchased; booster injection stripping foil chicane converters series assembly and tests not yet started; delays in the delivery of 20 kA, 6kA and 3.4 current transducers; LHC600A-40V power racks and modules for booster injection not started; power cables for booster MPS not yet purchased. SV = -950 kCHF. Cost Variance -164 TE-ABT: Components for foil handling systems and BI.BSW magnets received but not reported as general reporting by unit. CV = -400 kCHF. EN-EL: delays between the commissioning of equipment and the payment of the invoice. CV = +300 kCHF. 5 December 2016 Klaus Hanke LIU-Project team meeting

EVM status metrics – 1st Dec. 2016 In kCHF   Comment Schedule Variance -3’054 Cost Variance +225 5 December 2016 Klaus Hanke LIU-Project team meeting

Klaus Hanke LIU-Project team meeting Summary Since the re-baselining which was done before the CSR we seem to overspend slightly (before we were heavily underspending) The overall situation is OK and everything is under control Sylvie is doing a great job updating the EVM data with each WP holder. There have been n (n>>3) new baselines in the last couple of days. It is not possible that our WP holders interact with two different teams for these matters. We are very happy to give this responsibility to Sylvie. 5 December 2016 Klaus Hanke LIU-Project team meeting

Spare Slides or Slides which I don’t understand 5 December 2016 Klaus Hanke LIU-Project team meeting

LIU-PSB budget situation for year 2016 (PSB + L2B) 5 December 2016 Klaus Hanke LIU-Project team meeting

LIU-PSB example for the biggest variances 5 December 2016 Klaus Hanke LIU-Project team meeting