Nanobeacon Calibration in DU2

Slides:



Advertisements
Similar presentations
Data analysis BTF 23 e 24 mag 05 T1 T2 500MeV electrons Repetition Rate 50 Hz Pulse Duration 1-10 ns Current/pulse 1 to 8 particles σ XY ~2mm Max Electronic.
Advertisements

Veto Wall Test Hyupwoo Lee MINERvA/Jupiter Group Meeting Feb, 13, 2008.
Calibration of the 10inch PMT for IceCube Experiment 03UM1106 Kazuhiro Fujimoto A thesis submitted in partial fulfillment of the requirements of the degree.
Cosmic Ray Test Stand with Scintillating Cells for Digital Hadron Calorimeter As of 9am 05/28/2003.
UM PPS Lab Activities - HV Readout Long Run - Single Source Saturation Test PPS meeting April 30, 2012.
Paolo Musico on behalf of KM3NeT collaboration The Central Logic Board for the KM3NeT detector: design and production Abstract The KM3NeT deep sea neutrino.
MPPC R&D status Kobe Univ. CALICE collaboration meeting Yuji SUDO Univ. of Tsukuba ~ contents ~ Introduction Linearity curve Recovery time.
Leroy Nicolas, HESS Calibration results, 28 th ICRC Tsukuba Japan, August Calibration results of the first two H·E·S·S· telescopes Nicolas Leroy.
Francisco Salesa Greus IFIC (CSIC–Universitat de València, Spain) Representing the KM3NeT Consortium 4 th International Workshop on Very Large Volume Neutrino.
1 S. E. Tzamarias Hellenic Open University N eutrino E xtended S ubmarine T elescope with O ceanographic R esearch Readout Electronics DAQ & Calibration.
Tests with JT0623 & JT0947 at Indiana University Nagoya PMT database test results for JT0623 at 3220V: This tube has somewhat higher than usual gain. 5×10.
CAEN November 15, 2002 Vandelli W. 1 Test Conditions Prototype fed by CAEN Module 2527 through 100 m long cables From channels status page on generator.
14/02/2007 Paolo Walter Cattaneo 1 1.Trigger analysis 2.Muon rate 3.Q distribution 4.Baseline 5.Pulse shape 6.Z measurement 7.Att measurement OUTLINE.
Amsterdam 29 March 2011 Fernando Urbano IFIC (CSIC – Universidad de Valencia) KM3NeT Optical Calibration Laser Beacon and Nanobeacon Status.
1 N eutrino E xtended S ubmarine T elescope with O ceanographic R esearch Operation and performance of the NESTOR test detector.
Calibration Methods and Tools for KM3NeT V. Kulikovskiy on behalf of the KM3NeT collaboration.
MPPC Measurements at LSU Brandon Hartfiel LSU Hardware Group Thomas Kutter, Jessica Brinson, Jason Goon, Jinmeng Liu, Jaroslaw Nowak Sam Reid January 2009.
CHANTI update F. Ambrosino, T. Capussela, D. Di Filippo, P. Massarotti, M. Mirra, M. Napolitano, L. Roscilli, G. Saracino.
TELL1 high rate Birmingham Karim Massri University of Birmingham CEDAR WG Meeting – CERN – 26/03/2012.
1 A.Tsirigotus Hellenic Open University N eutrino E xtended S ubmarine T elescope with O ceanographic R esearch The NESTOR O.M.
PMT gain check at Indiana University. Test setup inside dark box LED white paper PMT # JT0298 channel #2 (per HPK numbering) OTHER CHANNELS MASKED WITH.
MPPC Saturation Corection Idea -> how to do. MPPC Gain measurement To apply saturation correction to the beam data, all MPPC are needed to be calibrated.
Status of the ETL 9125FLB Photomultiplier Tubes Steve Bache UNC-Wilmington.
1 LHCb CALO commissioning meeting Anatoli Konoplyannikov /ITEP/ XCAL commissioning with LED News New LED scan and stability data for ECAL were.
Calibration instructions for Quarknet Cosmic-Ray Detector How to Plateau the Counters A friendly guide for students and teachers Edited by Jeremy Paschke,
Cold PM test at Indiana final measurements, September 9 – 24, 2007 PM under test: Hamamatsu R7725 serial # ZK3692 (tube with Pt underlayer) Hans-Otto Meyer.
Feature Extractor Dima Chirkin, LBNL The future is here.
Fumihiko Ukegawa University of Tsukuba, Japan 6th Joint Korea-Japan ScEcal Meeting September 3, 2010 Kobe University Photo-sensor studies.
Nanobeacon test (Could the Nanobeacon be used to extract the PPS signal from the DOM once closed?): Signal 1 (yellow).- Nanobeacon trigger signal derived.
PMT test device setup functionality –reproducibility of output signal –dynamic range –limitations –test duration conclusion T. Wälchli, TT-Meeting Brussels,
PMT time offset calibration (not completed) R.Sawada 27/Dec/2007.
A. Tsirigotis Hellenic Open University N eutrino E xtended S ubmarine T elescope with O ceanographic R esearch Reconstruction, Background Rejection Tools.
ILC-CAL Test status of HPK photon sensors Kobe-U Y.Tamura / K.Kawagoe Confidential: do not distribute outside.
Status of NEWCHOD E.Guschin (INR), S.Kholodenko (IHEP), Yu.Kudenko (INR), I.Mannelli (Pisa), O.Mineev (INR), V.Obraztsov (IHEP), V.Semenov(IHEP), V.Sugonyaev.
The Results of 10 Additional PMT Tests 1.Timing of afterpulse 2.ADC readout 3. Conclusion TTU HEP Group Meeting, Apr. 14, 2004.
Umberto Emanuele IFIC (CSIC-UV), Valencia (Spain) Status of Time Calibration System forKM3NeT.
KM3NeT Optical Calibration Umberto Emanuele IFIC (CSIC – University of Valencia, Spain) WPF/L KM3NeT Meeting Nikhef 5 th - 7 th July
Marseille 29 January 2013 Diego Real IFIC (CSIC – Universidad de Valencia) Instrumentation for Optical Calibration: Laser Beacon and Nanobeacon.
1 PMT Univ. of Tokyo Yasuko HISAMATSU ICEPP, MEG Collaboration meeting Feb. 10th, 2004.
1 PMT Univ. of Tokyo Yasuko HISAMATSU ICEPP, The University of Tokyo MEG VRVS meeting Jan. 20th, 2004.
Test boxes software and first tests V. Kulikovskiy.
Group refractive index ● Method ● Additional runs ● Wavelength distribution ● Systematics ● Results.
1 MPPC Timing Resolution Akito Kobayashi Shinshu University Table of contents ・ Timing Resolution ・ Set up ・ data treatment ・ result(1) ・ result(2) ・ result(3)
Preliminary Analysis of the New Focusing DIRC Prototype Beam Data
Calibration Instructions for Quarknet Cosmic Ray Detector
DOM acceptance and calibration
Pre-calibration of PM gain by photo-statistics
HERD Prototype Beam Test
LKr status R. Fantechi.
TDR Measurement of MCP Anode
MoNA detector physics How to detect neutrons. Thomas Baumann NSCL.
Rate of voltage clamp-induced depolarization of DVR endothelial layer with di-8-ANEPPS. Rate of voltage clamp-induced depolarization of DVR endothelial.
TDR of PMT: Timing issues
Shahab Khan and Peter Torres
Tutorial on the Ortec 935 Quad Constant Fraction Discriminator
Time calibration Dmitry Chirkin, LBNL UC Berkeley, November 2004.
Rundown of the Hyperpolarization-Activated KAT1 Channel Involves Slowing of the Opening Transitions Regulated by Phosphorylation  Xiang D. Tang, Toshinori.
String-21 Flasher Analysis
NanoBPM Status and Multibunch Mark Slater, Cambridge University
Read Delay Simulations
Geometry and Timing Verification with Flashers
High Rate Photon Irradiation Test with an 8-Plane TRT Sector Prototype
Neutron Beam Test for Measuring Quenching Factor of CsI(Tl) Crystal
Update on Laser ‘Aftershock’ Triggers
Modulation of the Gating of Unitary Cardiac L-Type Ca2+ Channels by Conditioning Voltage and Divalent Ions  Ira R. Josephson, Antonio Guia, Edward G.
KEK, 阪大RCNPA, 阪大理B, 京大理C, 原研先端研D,
Module Testing at HLL – W08_OB1
RPC Configuration DataBase Pierluigi Paolucci - I.N.F.N. of Naples.
Nanobeacon: A low cost calibration instrument for KM3NeT
ASD-TDC joint test with MDT-CSM
Presentation transcript:

Nanobeacon Calibration in DU2 Avaliable data from DataBase: Calibration Curves Test in Naples First analysis Next Operation 15/01/2016 G. Riccobene

Nanobeacon Calibration in DU2 Calibration Curves from DataBase All nanobeacon curves are in the database but it seems we have 2 populations DOM 1:6 DOM 7:18 (typ, DOM1) (typ, DOM 11) 15/01/2016 G. Riccobene

Nanobeacon Calibration in DU2 Test in Naples Voltage set = 7V DOM # - Rate/10 [kHz] nanobeacon off - Rate/10 [kHz] nanobeacon ON 1 200 65000 2 400 108000 3 2000 67000 4 500 101000 5 290 96000 6 350 6400 7 400 2000 8 400 8500 9 350 20000 10 400 1200 11 300 NO Nanobeacon 400 700(7V) 3800(8V) 400 9300 400 18000 400 80000 500 15500 400 3600 450 2800 See elog entry http://elog.km3net.de/DU+Integration/44 15/01/2016 G. Riccobene

Nanobeacon Calibration in DU2 Test in Naples (CLB swissknife screenshot) 15/01/2016 G. Riccobene

Runs Performed First Runs: aim optimising nanobeacon voltage (maximum power avoiding PMT saturation and High Rate Veto) http://elog.km3net.de/Operations+IT/1899 We use JavaGUI tool first to find the optima settings for The nanobeacon voltage. A run setup will be defined after these tests The procedure on how to operate is described on the Operation wiki page

Runs Performed

Runs Performed http://elog.km3net.de/Operations+IT/2049 The voltage settings were changed to reach a rate on channel 0 of ~13 kHz, in order not to blind the DOMs. 1649: DOM3, mV = 6600 1651: DOM4, mV = 6000 1653: DOM5, mV=5800 1655: DOM6, mV= 7000 DOM7 mV= 8500 1693 DOM 8 mV= 7100 1695 DOM 9 mV = 6800 1697 DOM9 mV= 6800 The other settings were: pulse period 6251 (10 kHz) pulse count 9500 pulse duration 1 (change of pulse duration has no effect) DOMs 1, 2, 10 and 11 skipped http://elog.km3net.de/Operations+IT/2049 http://elog.km3net.de/Operations+IT/2050 http://elog.km3net.de/Operations+IT/2051 http://elog.km3net.de/Operations+IT/2060

Runs Performed Cumulative DOM rate DOM 3 and 4 DOM 3 and 4

Runs Performed Cumulative DOM rate DOM 4 and 5

Strategy Use Channel0 [3,4]of the emittng DOM as reference and measure delay of LED emission (width 16 ns, expected delay wrt PPS ca. 1 ns) Measure arrival time distribution of photons to downward looking PMTs of upper DOM (modulo 10 kHz) Increase LED power and check that this delay is constant, then run at higher power