US TileCal Meeting at UT Arlington

Slides:



Advertisements
Similar presentations
CMS Week March presented by John Coughlan RAL FED Hardware Status Pre-Series Manufacture Final Production Plans.
Advertisements

M. Gilchriese US ATLAS Pixel Meeting July 18-19, 2002 UC Santa Cruz.
TileCal Electronics A Status Report J. Pilcher 17-Sept-1998.
The LAr ROD Project and Online Activities Arno Straessner and Alain, Daniel, Annie, Manuel, Imma, Eric, Jean-Pierre,... Journée de réflexion du DPNC Centre.
HCAL RBX PRR 2 March H C A L RBX Monitoring RBX Production Readiness Review Monitoring, Fieldbus and DCS John E. Elias HCAL Electronics Coordinator.
Status of the Optical Multiplexer Board 9U Prototype This poster presents the architecture and the status of the Optical Multiplexer Board (OMB) 9U for.
June 2006Juan A. Valls - FPA Project1 Producción y validación de los RODs Read-Out Driver (ROD)
Detector Systems Update MICO May 19, MICE Detector Systems  Beam Monitors u Over heating of sender boards has been s Solution.
LAr ROD Status Arno Straessner and Alain, Daniel, Annie, Manuel, Imma, Laurent, Eric, Jean-Pierre, Gilbert,... ATLAS Geneva DPNC January 12 th, 2005.
Slide 1UCSB Rod Production presented by Jim LambDOE review, January 20, 2004 UCSB Rod Production UCSB Rod Production, Jan , presented by Jim Lamb.
Detector Systems Update MICO March 3, MICE Detector Systems  CKOV u CKOV humidity (HIH4000) and temperature (LM35) sensors in hand for installation.
Slide 1Rod Production presented by Jim Lamb (UCSB)April 9, 2004 Rod Production Rod Production, April , presented by Jim Lamb (UCSB)
Commissioning TileCal with Cosmic Ray Muons J. Pilcher University of Chicago.
S.Sergeev, JINR, Dubna. This is just an example of what could be done Could be extended to needs of any NA62 sub- detector requiring a lot of analog measurements.
VC MICO Report July 07Jean-Sébastien GraulichSlide 1 Main news  DAQ test bench running in Geneva 2 LDCs connected to 2 different PCs, 1 GDCs DAQ trigger.
5 March DCS Final Design Review: RPC detector The DCS system of the Atlas RPC detector V.Bocci, G.Chiodi, E. Petrolo, R.Vari, S.Veneziano INFN Roma.
Pixel Upgrade Plans ROD/BOC PRR July 17, 2013 T. Flick University of Wuppertal.
Silicon Inner Layer Sensor PRR, 8 August G. Ginther Update on the D0 Run IIb Silicon Upgrade for the Inner Layer Sensor PRR 8 August 03 George Ginther.
Concluding Summary WBS1.1.2 SCT Subsystem A. Seiden BNL March 2001.
1/24/01TDC Review1 Report to the TDC Review Committee Presented by Myron Campbell.
Mobile DAQ Testbench ‘Mobi DAQ’ Paulo Vitor da Silva, Gerolf Schlager.
CMS ECAL End Cap Meeting CERN 18 Oct to 22 Oct ECAL End Cap High Voltage and Fibre Optic Monitoring Systems Progress. Progress on High Voltage and.
Status report on the development of a readout system based on the SALTRO-16 chip Leif Jönsson Lund University LCTPC Collaboration Meeting
CSC ME1/1 Upgrade Status of Electronics Design Mikhail Matveev Rice University March 28, 2012.
Installation and Commissioning of the ATLAS LAr Readout Electronics
PMG, Aug 03, 2000 Slide 1 Schedule In preparation Done Started Done Started Half done.
Status of NA62 straw electronics Webs Covers Services Readout.
John Coughlan Tracker Week October FED Status Production Status Acceptance Testing.
Update on the Triple GEM Detectors for Muon Tomography K. Gnanvo, M. Hohlmann, L. Grasso, A. Quintero Florida Institute of Technology, Melbourne, FL.
1 ME1/1 OTMB Production Readiness Review: Schedule and Budget Darien Wood Northeastern University For the ME1/1 Electronics Project.
1 ME1/1 ODMB Production Readiness Review: Schedule and Budget Darien Wood Northeastern University For the ME1/1 Electronics Project.
Electronics: Junction Cards, Adapter Card, Purple Card, …. Ron Sidwell, K. Harder, T. Sobering, R. Taylor, E. VonToerne, Kansas State U.
DOE/NSF Review of U.S. ATLAS May 21-23, 2003 CSC Mechanics and Electronics Paul O’Connor Tom Muller BNL May 22, 2003.
US CMS DOE/NSF Review, 20 November Trigger - W. Smith1 WBS Trigger Wesley H. Smith, U. Wisconsin CMS Trigger Project Manager DOE/NSF Status.
US TileCal Meeting at UTA Possible Electronics Evolution J. Pilcher University of Chicago.
The ATLAS Tiles Hadronic Calorimeter
9/12/2003Ivan Hruska1 First box prototype –Box design in July ‘03 –Box produced during August ’03 Tested last week in few fingers Small changes necessary.
ECAL Plenary 27/2/07 D.J.A. Cockerill - RAL 1 Status of the CMS ECAL Endcaps ECAL Plenary, 27 Feb 2007 D Cockerill  VPTs  Electronics and Integration.
Electronics Workshop GlueX Collaboration Meeting 28 March 2007 Fast Electronics R. Chris Cuevas Group Leader Jefferson Lab Physics Division Topics: Review.
Preparations to Install the HBD for Run 6 Craig Woody BNL PHENIX Weekly Meeting January 26, 2006.
July 10, 2001 Status Report of the ROD Testing at BNL Kin Yip Activity update of the ROD system at BNL: DAQ-1 with trigger controller Data corruption testing.
August 24, 2011IDAP Kick-off meeting - TileCal ATLAS TileCal Upgrade LHC and ATLAS current status LHC designed for cm -2 s 7+7 TeV Limited to.
Within ATLAS both TILECal and LAr are planning upgrades to the readout systems - current systems will reach limits on radiation exposure aging of components.
Outline Upgrade status of the ECAL/HCAL HV control mezzanine board;  Firmware design,  Setup for making functional tests and validation FPGA firmware.
G-2 Calorimeter test beam “ T-519 has been assigned beam time is from Thursday July 17 to Monday morning July 27 at ESTB” LCLS is operating lower beam.
S-band processing electronics R. Ainsworth (summer student), S. Boogert, G. Boorman (Royal Holloway) A. Lyapine (University College London) Weekly ATF2.
TileCal EM scale status Irene Vichou University of Illinois at Urbana on behalf of TileCal Collaboration MPI Hadronic Calibration Workshop May 3 rd, 2006.
DAQ / Trigger Card for HCAL SLHC Readout E. Hazen - Boston University
DT-LHCb coordination meeting 18 April 2016
Why we need an improved LASER calibration system
GLAST Large Area Telescope:
University of Wisconsin
Status of NA62 straw readout
LKr status R. Fantechi.
Upgrade activities at Clermont-Ferrand
Alberto Valero 17 de Diciembre de 2007
CCS Hardware Test and Commissioning Plan
Test Stand Status and Plans
Update on CSC Endcap Muon Port Card
DAQ for ATLAS SCT macro-assembly
Roger Wendell for the OD group
T1 Electronic status Conclusions Electronics Cards:
Mini-drawers, FE-ASIC , Integrator
VELO readout On detector electronics Off detector electronics to DAQ
8-layer PC Board, 2 Ball-Grid Array FPGA’s, 718 Components/Board
University of California Los Angeles
ATLAS Tile Calorimeter Interface The 8th Workshop on Electronics for LHC Experiments, Colmar, 9-13 September 2002 K. Anderson, A. Gupta, J. Pilcher, H.Sanders,
US Rod Burn-in Readiness DAQ Hardware/Power Supplies
Equipment Status ARCS equipment status DAQ equipment status
Pulsar Construction Schedule
Presentation transcript:

US TileCal Meeting at UT Arlington Status Update 1.4.3 - Readout Electronics J. Pilcher University of Chicago

3-in-1 STATUS 3-in-1 Cards 10,600 being produced Plus spare semiconductors for 900 cards (8.5%) 9856 needed to equip calorimeter Extra 8% for spares, test setups, waste, etc. 9924 burnt-in, tested, shipped to CERN Enough for full drawer assembly Minor repairs needed on the rest Several hundred diagnosed and flagged for technician Repairs and testing proceeding on “as available” basis (summer students) 5/13/02 J. Pilcher

Mother Board Status Mother Boards 277 sets being produced (4+1 boards) Plus spare semiconductors for 22 sets (8%) 256 sets needed to equip calorimeter Extra 21 sets (8%) for spares, test setups, etc. 185 sets burnt-in, tested, shipped to CERN Minor issues with Mezzanine board used for control Yield of working boards lower than expected (85%) Bad boards being diagnosed for repair (~40 boards) How to handle sets used for radiation tests (10) Use as is? Change semiconductors? 5/13/02 J. Pilcher

Interface Board Status Optical Interface board Receives and distributes TTC signal Transmits data to RODs One per electronics drawer 17 pre-production boards burnt-in, tested, delivered to CERN All parts on hand and ready to ship for production of 264 boards Spare semiconductors for 21 boards 5/13/02 J. Pilcher

Interface Board Status Work waiting for signed contract from Radiantech Sent 8 weeks ago Being reviewed by “lawyers” Cost in Taiwan is $19.6K Next closest vendor is Altron (US) at $27.7K 5/13/02 J. Pilcher

Electronics Planning & Coordination Kelby at CERN this week for TTC review Clarify operation of TTCrx chip Weekly phone conferences on drawer production Need 6 drawers for June calibration run Working group on ROD specifications Valencia has production responsibility How to adapt LAr ROD design? Appears to be little experience in Valencia 5/13/02 J. Pilcher

Electronics Planning & Coordination Receipt of LVL1 trigger signals Ensure desired treatment and processing Low voltage power supplies To be located in “fingers” As of March, no production design Radiation tolerance issues Space and power issues Cost likely high Prague group seems to have responsibility now George is a consultant 5/13/02 J. Pilcher

Electronics Planning & Coordination Low voltage power supplies ≥2 years before production units in hand after design is frozen Radiation tests, PRR, parts procurement, assembly, burn–in, testing Stand-alone control and testing in pit System issues to resolve Multiple TTC domains Coordination of CIS, Laser, Cs, Min-bias calibrations Monitoring plans? 5/13/02 J. Pilcher