TOTEM Electronics Status

Slides:



Advertisements
Similar presentations
Fischer Manufacturing is an electrical fabrication company based in New Brighton, MN. We specialize in building to engineering specified requirements.
Advertisements

Flavio Dal Corso - INFN Padova1 OPERA coll. meeting - Hamburg 3 July 2004 RPC & XPC Electronics Status Front End Boards (FEBs) Controllers HV system Crates.
Meeting on status and plans of the LP subsystems for the LP beamtest at DESY 02/25/2008 Franck SENÉE1 LP-TPC: Micromegas Panel and Cosmic Muon Trigger.
CMS Annual Review 2003 PACT - the RPC Muon Trigger Bari-Helsinki-Laapperanta-Warsaw Jan Królikowski Warsaw University.
LAr ROD Status Arno Straessner and Alain, Daniel, Annie, Manuel, Imma, Laurent, Eric, Jean-Pierre, Gilbert,... ATLAS Geneva DPNC January 12 th, 2005.
Electrical Installation CM39 Andy Gallagher & Ian Mullacrane.
Saverio MINUTOLITIG meeting, 10 February Report on T1 installation activities and achievements made during this shutdown.
Electrical & Control CM40 Daresbury Laboratory. CM40 Electrical Infrastructure Update RRM2 Latest Latest on Installation Progress Rack Allocations Racks.
ATF2 Q-BPM System 19 Dec Fifth ATF2 Project Meeting J. May, D. McCormick, T. Smith (SLAC) S. Boogert (RH) B. Meller (Cornell) Y. Honda (KEK)
Takashi Matsushita Imperial College T. Matsushita 1 Tracker Status.
March ‘08G. Ruggiero Totem Collaboration Meeting Roman Pot Detectors 1 st RP Detector Assembly RP vs DCS and DB CERN Open day.
P. 1Mario Deile – TOTEMino: Infrastructure Status and Schedule Mario Deile Zone 2.Gas system 3.Cabling 4.Cooling water 5.Counting-Room 6.Safety.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester July 8, 2013.
Saverio Minutoli INFN Genova 1 1 T1 Electronic status Electronics Cards involved: Anode Front End Card Cathode Front End Card Read-Out Control card VFAT.
LHCf Arm2 – status of hardware upgrade in Firenze Lorenzo Bonechi 20 December 2013.
Status of NA62 straw electronics and services Peter LICHARD, Johan Morant, Vito PALLADINO.
V. Bobillier1 Long distance cable installation status Calorimeter commissioning meeting.
1 5 December 2012 Laurent Roy Infrastructure / Electronics Upgrade -Cabling (long distance) -Rack and Crate (space, electrical distribution, cooling) -Detector.
Construction and Installation Readiness of TOTEM Roman Pots Detectors Federico Ravotti (PH/TOT) Gennaro Ruggiero (PH/TOT) LHCC minireview – 06 May 2009.
13 June 2013Laurent Roy Optical Fibers / Electronics Upgrade -Fibers need for Upgrade -> Installation ? -Two techniques possible for multi fibers installation.
Hall D Online Meeting 27 June 2008 Fast Electronics R. Chris Cuevas Jefferson Lab Experimental Nuclear Physics Division 12 GeV Trigger System Status Update.
Tracker Summary Alan Bross MICE CM October 10, 2007.
1 MICE Hall and Infrastructure - Progress since CM18 Chris Nelson MICE CM19 Oct 2007.
Status of NA62 straw electronics Webs Covers Services Readout.
John Coughlan Tracker Week October FED Status Production Status Acceptance Testing.
Total Cross Section, Elastic Scattering and Diffraction Dissociation at the LHC January 17, 2003TOTEM plenary meeting -Marco Bozzo1 CSC detectors for T1.
Status of the PMT light detection system Gian Luca Raselli 20-AUG-2015 ICARUS executive meeting.
PIP Budget Codes Budget FY12 Updates October 19, 2011 PIP Meeting.
R. Boyd 1 February  Dr. M. Saleem  D. Jana  M. R. Meera Labbai  R. Boyd.
1 Onsite Status Itaru Nakagawa RIKEN/RBRC. 2 Schedule.
NQPS commissioning …a long way to go. Topics nQPS component overview Enhancements in Firmware Commissioning diagram Detailed task list Summary.
February 14, Comprehensive Review B. Schmidt Outline: Status and overview of activities: –Platforms and staircases –Muon Filters and beam plugs.
V. Bobillier1 Cable installation status.
Walter Snoeys – CERN – PH – ESE – ME –TOTEM October 2009 TOTEM Electronics Status.
Saverio MINUTOLITOTEM Electronics W.G., 9 December T1 electronics status.
Tile HCAL status Felix Sefkow CALICE Technical Board Review April 19, 2007.
Preparations to Install the HBD for Run 6 Craig Woody BNL PHENIX Weekly Meeting January 26, 2006.
GlueX Collaboration May05 C. Cuevas 1 Topics: Infrastructure Update New Developments EECAD & Modeling Tools Flash ADC VXS – Crates GlueX Electronics Workshop.
T2 Status Report IP5 Installation Future plans. IP5 installation The mechanical structure has shown problems on installation and should be changed slightly.
Xbox and Structure testing news N. Catalan Lasheras, R. DeGiovanni, J. Giner-Navarro, G. Mcmonagle, I. Syratchev, B. Wooley, X. Wu
D.Macina TS/LEATOTEM Meeting25/02/2004 Roman Pot test at the SPS Test of the Roman Pot prototype in the SPS proposed in December 2003 (CERN/LHCC ):
1 DCS Meeting, CERN (vydio), Jun 25th 2013, A. Cotta Ramusino for INFN and Dip. Fisica FE Preliminary DCS technical specifications (v1.0) for the Gigatracker.
Walter Snoeys – CERN – PH – ESE – ME –TOTEM June 2008 Electronics WG Report TOTEM Electronics’ Status.
P. 1Mario Deile – TOTEMino: Status and Schedule Mario Deile Zone 2.Gas system 3.Cooling water 4.Cables 5.Safety 6.Schedule, Project Plan 7.Schedule.
Current Status of QBPM Electronics and Magnet Movers D. McCormick, J Nelson, G White SLAC S Boogert Royal Holloway Y. Honda, Y.Inoue KEK.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester June 3, 2013.
S A Griffiths CM42 June 2015 Electrical & Control.
Berkeley status Aug 10th, 2012.
TDC2/TCC2 Electrical remedial work /12/14
University of Wisconsin
4m. Blanco TCS Upgrade: Electronic Status at March/2010
LKr status R. Fantechi.
Introduction Status before the 2009 run Results from the 2009 run
HF Test station at P5 A.Mestvirishvili.
CMS Area Working Group Meeting
T1 Electronic status Conclusions Electronics Cards:
CMS November Upgrade Week
LHCb electronics, 12th June 2014
EMU Slice Test Run Plan a working document.
Jan Królikowski Warsaw University
Nearly the end of a long story...
GlueX Electronics Review Jefferson Lab July 23-24, 2003
Pierluigi Paolucci - I.N.F.N. Naples
Trigger M&O Progress -- Florida, Rice, UCLA, Wisconsin
Regional Cal. Trigger Milestone: Production & Testing Complete
LCLS Cavity BPM Electronics Undulator Week January 22, 2008
Trigger M&O Progress -- Florida, Rice, UCLA, Wisconsin
UK CMS Oversight Committee Mtg
Jason Gilmore Vadim Khotilovich Alexei Safonov Indara Suarez
Status report MEG DC 20/6/06 Test in COBRA Hajime,Matthias,Johny Peter : beam, Wataru : COBRA Necessary Modifications in DC.
Presentation transcript:

TOTEM Electronics Status

Electronics Status 2 Roman Pots installed, 3rd pot and 4-6th assembled, rest in progress, mezzanines available, last batch of RP MB in mounting 1st quarter T1 under test in Genova, worked hard on noise issues, still some questions with respect to large frame 1st quarter T2 installed, second very soon, rest in assembly Printed Circuit boards issues HOST board (for all three subdetectors, main VME board in counting room) production relaunched, can still work with ‘bad’ ones RP hybrid : still some in reproduction after metallization problem T1 and T2 hybrid: lost ~ 250 hybrids in last production due to delamination – will be tight for assembly, is problem area - in discussion with the companies. Relaunched small quantity of pad hybrids Trigger mezzanines almost fully delivered (some to T1 remaining) CC mezzanines being finalized, last trigger mezzanines Electronics for electrical repeaters under test Interlock box layout finished – production to be launched

Electronics Status Technicians issue : Quench Protection System requires significant resources, also technicians from our group taken for this – in discussion with division for replacement, will not be enough, need help from the institutes (DCS boxes) Cabling : long distance cabling complete Cabling for racks in alcove and T2 rack to be completed/cleaned up Short cabling on 220 m stations to be verified, on 147 m stations to be done Short cabling to be done for T1, done for T2 Labeling and database update being finalized (with S. Bally), work almost finished for RP, T2, T1 still need update (short cables) Local optical fibers to be installed and connected during pots installation, need preparing in protection sleeve DCS & DSS (DCS rack, boxes in production), some cables to be (re)done (USC55), in discussion with CMS DSS to finalize connections Power supplies – need to repair OPFCs (increased protection) – need technician for ~ 1-2 days. INB coding defined, some feedback to be included, then published. GBTx specifications for upgrades being discussed. Should give feedback (could