Maintenance Vattenfall Europe Mining AG

Slides:



Advertisements
Similar presentations
Ukraine, Кyiv, 2013 Presentation of LLC SERVICE-NS: Reliable and uninterrupted technical service of filling stations and petroleum storage depots, providing.
Advertisements

COMPANY ACTIVITY QUALITY ASSURANCE ENVIRONMENTAL ORGANISATION COMPANY HISTORY OUR MISSION Serving You Around the World, Around the Clock.
Activity INDUSTRY OIL EXTRACTION CONSTRUCTION INDUSTRY ENVIRONMENTAL PROTECTION ENERGY SCOPE OF SERVICES 1.
12-May-151 Khan Younis Waste Water Treatment Plant Management Arrangements Khan Younis Waste Water Treatment Plant Management Arrangements.
Advanced hydraulic solutions
Increasing the Quality of Public Transport in Prague Prague Integrated Transport.
INDUSTRIAL & SYSTEMS ENGINEERING
Documenting the Existing Network - Starting Points IACT 418 IACT 918 Corporate Network Planning.
Copyright © 2003 Americas’ SAP Users’ Group Making a Profit with Customer Service David Baethke, Vice President, The Baer Group Wednesday, May 21, 2003.
Nr / RENEWABLE ENERGIES AND THE DEVELOPMENT OF LIGNITE MINES IN GERMANY, LUSATIA CONFLICT OR CHANCE OF THE FUTURE OF ENERGY SUPPLY? Prof.
Energy Management Proposed At KTPS. Objectives for Energy Management Generate energy at lowest possible price Manage energy use at highest energy efficiency.
EFRTC welcome & presentation EC project, AUTOMAIN workshop, Paris, 4 th October 2012 Imrich Korpanec, EFRTC Secretary General.
Workshop on Infrastructures Sustainable Infrastructure for Efficient Mobility: the Key Challenges Luc Bourdeau ECTP Secretary General Industrial Technologies.
Term 2, 2011 Week 3. CONTENTS The physical design of a network Network diagrams People who develop and support networks Developing a network Supporting.
Current Job Components Information Technology Department Network Systems Administration Telecommunications Database Design and Administration.
DRIVING INNOVATION © Poclain Hydraulics – 2010 Confidential.
Computerized Manufacturing Systems
Unrestricted / © Siemens AG All Rights Reserved. Integrated Drive Systems – for measurable customer benefit.
HŽ Passenger Transport – overviewBUCHAREST HŽ PASSENGER TRANSPORT.
GREG CAPPS [ ASUG INSTALLATION MEMBER MEMBER SINCE:1998 ISRAEL OLIVKOVICH [ SAP EMPLOYEE MEMBER SINCE: 2004 GRETCHEN LINDQUIST [ ASUG INSTALLATION MEMBER.
Life cycle services for automation products
African Regional Director
The Internet of Things Embedded Products Overview
1.st South East Environment Workshop September Belgrade, Serbia Mr. Saša Živković, B.Sc.Eng. Head of Department for Energy Efficiency IT support.
Facts About the Energy Industry  By 2015, 35 percent of the workforce (approximately 200,000 high-skill, high- wage workers) may need to be replaced.
Modern Maintenance. Management
TGYDGL09 Project DEPLOYABLE RAPID DIAGNOSTIC LABORATORY MOBIOCHEM Ltd.
The history of BALTIC WIND SOLUTIONS growth 2 Experience Quality Safety Accepting the challenge 3 What is BALTIC WIND SOLUTIONS?
IT Jobs Positions available in the field of Information Technology.
Restructuring of the Finnish Infrastructure Administration Draft
How selected hoist overload limiter. How should hoist overload limiter Selection Electric hoist is a motor, reducer and rope reel (or chain) as one of.
Plant Maintenance Experts CPM Engineering offers diagnosis and repair of electrical and mechanical equipment. From pump, gearbox & motor repairs, machining.
State Regulation in the Natural Monopoly Sphere Agency of the Republic of Kazakhstan on Regulation of Natural Monopolies ALMATY – 2006.
JSC UZBEKENERGOTAMIR A specialist enterprise with more than 45 years of experience in overhauling an maintenance. 1.
Cryogenics Operations 2008, CERN, Geneva, Switzerland 1 CRYOGENICS OPERATIONS 2008 Organized by CERN Industrial contributions to the maintenance of CERN.
SCADA Supervisory Control And Data Acquisition Pantech Solutions Here is the key to learn more.
Fact Sheet CTT Moscow th International Show of Construction Equipment and Technologies Issued in: 09/2007 Key data Premier event:1999.
Artificial Intelligence In Power System Author Doshi Pratik H.Darakh Bharat P.
Planning and Realisation of Wind Farms
«My future profession»
Today´s Challenges of the Rail Infrastructure Industry
Minimum Set of Requirements for Suppliers
Uniper Energy Services
Pipe Shop Consulting Planning and Execution of an Automated Pipe Shop
Minimum Set of Requirements for Suppliers
Hailo US Tower Equipment Manufacturer
Discovering Computers 2010: Living in a Digital World Chapter 14
We enable Digitalization Thomas Hahn CERN Openlab, March 2016
Health and safety organization on construction site
Clinical Engineering Lecture (3).
FERO INVEST
Fans & Heaters technical seminar
JSC “UKRAINIAN RAILWAY” (UZ) DEVELOPMENT STRATEGY FOR
IMPLEMENTATION OF EIGHT PILLARS THE TOTAL PRODUCTIVE MAINTENANCE AT WATER SUPPLY COMPANY Iswandi Idris Ibrahim Ruri Aditya Sari.
GlueX Electronics Review Jefferson Lab July 23-24, 2003
Maintenance module Martin Heigl CTO
Pipe Shop Consulting Planning and Execution of an Automated Pipe Shop
Operations Management
CEIT Group Introduction
Across the entire value chain
Celtic-Plus Proposers Day 20th June 2017, Helsinki
Dr.-Ing. Bruno van den Heuvel RWE Power AG
Fabrication, Erection, Operation & Maintenance Under One Roof
Operations Management
RIGA CONTAINER TERMINAL Corporate Presentation
Presentation of the Company
Your partner with over 70 years of experience
OP Integrated infrastructure 2014 – 2020
ILO Industrial Opportunities Days, 6-7 June 2019
Principles of Information Technology
Presentation transcript:

Maintenance 2012 @ Vattenfall Europe Mining AG Overview of VEM Methods and Measures Maintenance organization Results Cottbus, 06.06.2012

What we did in VEM over the last years? Maintenance = core business Clear functional divide between maintenance and operation Outsourcing of part of maintenance to competitive local market Modernization of equipment Centralization of strategy, planning and budgeting Unification of components One central warehouse for 5 mines and 12 power plants Concentration of production and performance increase Implementation of sophisticated diagnostic systems Implementation of SAP; TIS, ZEDAS and other software systems Continuous improvement process with process line approach Management tool to measure the success of maintenance - PMB 12.05.2018 | MIning Solutions and PL-PPE; Strategie_IH_VEM

The Lusatian Lignite Mining Area – 5 active mines Status: 01.01.2011 Vattenfall Records 2010 Guben Jänschwalde-Nord Lignite Production Jänschwalde Cottbus-Nord Welzow-Süd Nochten Reichwalde 56.7 mill. t 11.5 mill. t 5.8 mill. t 20.7 mill. t 18.7 mill. t 0.0 mill. t Spree Jänschwalde power plant Spreeaue Jänschwalde mine Brandenburg Cottbus-Nord mine Cottbus Jänschwalde storage site Overburden Removal Jänschwalde Cottbus-Nord Welzow-Süd Nochten Reichwalde 406.3 mill. m³ 121.4 mill. m³ 24.6 mill. m³ 137.9 mill. m³ 118.6 mill. m³ 3.8 mill. m³ Forst/ Lausitz Neiße Bagenz-Ost Welzow-Süd mine Overburden Ratio 7,17 m³/t Republic of Poland Partial section II, Welzow-Süd Spremberg Spremberg-Ost Mining field 2, Nochten Power plants (installed capacity) Jänschwalde Boxberg Schwarze Pumpe 7,175 MW 3,000 MW 2,575 MW 1,600 MW Schwarze Pumpe Nochten mine Weißwasser Storage site „Spreyer Höhe“ Hoyerswerda Reichwalde mine Spread of the 2nd Lusatian coal seam Mined out seam areas Saxony Boxberg power plant 12.05.2018 | MIning Solutions and PL-PPE; Strategie_IH_VEM 3

Principle of Opencast Mine Process in Lusatia 12.05.2018 | MIning Solutions and PL-PPE; Strategie_IH_VEM

Overview Heavy Opencast Mine Equipment Overburden Conveyor Bridges 5 units Bucket wheel excavators 19 devices Bucket chain excavators 27 devices Spreader & Belt wagon 19 units 12.05.2018 | MIning Solutions and PL-PPE; Strategie_IH_VEM

Quantity structures of active plants (Plan 2011) Designation Number / Length Overburden conveyor bridges 5 Excavator, reclaimer 46 Spreader, belt wagon 19 Belt conveyor systems     96 km Cables and overhead lines 600 km 110 kV Transformer stations 6 Locomotives 76 Rail cars 967 Track network incl. equipment tracks 553 km Track shifting Machines 39 Dewatering Pumps 6797 Pit water purification plants 4 Control centres Raw coal production 59.5 mill. t Overburden removal 417.3 mill. m3 Water pumpage 383.2 mill. m3 Drilling meter 105.4 km Sealing wall 119.0 tsd. m2 Men-hours 853.0 tsd. h 12.05.2018 | MIning Solutions and PL-PPE; Strategie_IH_VEM 6

Applied maintenance methods and their shares Travelling gears thereof rail cars Limit switches Air-conditioning systems Digging tools Belts Drums Motors Gearboxes Transformers Control systems Converter Cables Lines Ropes Linings Crawler track shoes Idlers and garlands Aprons Track wheels Value percentage of process allocation 2010 12.05.2018 | MIning Solutions and PL-PPE; Strategie_IH_VEM

Typical maintenance measures for mining equipment Service Planned weekly repair (8-12h) Annual overhaul (14 days in the first and 28 days in second year) Trouble shooting and defect removal Ad hoc repairs parallel to other stand stills Project measures – technical reconstruction, life time extensions Complex modernization and rehabilitation measures 12.05.2018 | MIning Solutions and PL-PPE; Strategie_IH_VEM

Organisational Structure of Opencast Mine Safety Laws, Standards & Regulations VEM Board of Directors Technical Services Mining Department Securing and proof of technically necessary standard For the requirements of mining Use of plants and equipment with authorized personnel according to current technical documentation Recognized experts for heavy opencast mine equipment Mining authorities 12.05.2018 | MIning Solutions and PL-PPE; Strategie_IH_VEM

Structure of Vattenfall Europe Mining in 2010 3 Strategy 12.05.2018 | MIning Solutions and PL-PPE; Strategie_IH_VEM

Maintenance Department HO: Systems Engineering Equipment strategy planning Investment planning Life time extension Modernization planning R&D activity planning Innovation planning Performance increase planning System integration planning 12.05.2018 | MIning Solutions and PL-PPE; Strategie_IH_VEM

Maintenance Department 1: Field Service Structure: Mechanical Field Service Team mines Jänschwalde / Cottbus N Electrical Field Service Team mines Jänschwalde / Cottbus N Mechanical Field Service Team mines Nochten / Reichwalde Electrical Field Service Team mines Nochten / Reichwalde Mechanical Field Service Team mine Welzow Electrical Field Service Team mine Welzow Staff unit (Planning and works preparation) Central power supply and network service Tasks Supervision and evaluation of equipment condition Identification and specification of repair measures (works, spares), Involvement and supervision of outside service companies Standard repairs, planned repairs and defect removal 12.05.2018 | MIning Solutions and PL-PPE; Strategie_IH_VEM

Mechanical Field Service Team mines J/CN Substructure: Field teams for process lines (precut, bridge, coal system) Trouble shooting and defect removal group Local workshop repairs Work and repair preparation group Example for involvement of outside services and personnel in a typical weekly repair (8-12h): VEM supervision Contract worker Precut 4 20 Conv. Bridge 8 40 Coal system 4 15 12.05.2018 | MIning Solutions and PL-PPE; Strategie_IH_VEM

Maintenance Department 2: Technical Office Planning and implementation of innovations Planning and preparations of complex reconstructions / modernizations Technical process optimization and bottleneck removal Supervision and maintaining of mine equipment safety Component unification Setting and adjusting of internal technical standards Administration of all technical documentation of VEM Elaboration of technical solutions for special areas Coordination of outside and inside works and supplies Preparation of technical specifications and tender documents for complex rehabilitation measures Project Management and Implementation Supervision for large and complex project measures 12.05.2018 | MIning Solutions and PL-PPE; Strategie_IH_VEM

Maintenance Department 3: Central Workshop Tasks: Defect removal / service and maintenance of rolling stock repair of railway equipment, reconditioning of wheels, drives,… Repair of underground motor and waste water pumps Repair of mechanical mine equipment components and units: Buckets, bucket chains, belt drums, gearboxes, turas, crawler plates, travel gears, wheels, other Reconditioning of standard components Component and material management Measuring and test service Features: 50 million EUR turnover per annum 14 000 SAP repair jobs and work orders per annum 12.05.2018 | MIning Solutions and PL-PPE; Strategie_IH_VEM

Central warehouse and logistics Schleswig-Holstein Rostock Mecklenburg-Vorpommern Hamburg Schwerin Brandenburg GTKW Ahrensfelde (G) Bremen GTKW Thyrow (G) Berlin Niedersachsen Jänschwalde, Cottbus (M), KW Jänschwalde (G) Hannover Magdeburg Schwarze Pumpe (M), KSP Schwarze Pumpe (G) Sachsen-Anhalt Cottbus Welzow (M) PSW Wendefurt (G) Halle Leipzig Nochten / Reichwalde (M) Boxberg (G) Sachsen Dresden KW Lippendorf (G) Erfurt Thüringen PSW Niederwartha (G) PSW Hohenwarte / PSW Bleiloch (G) Saalfeld Chemnitz PSW Markersbach (G) PSW Goldisthal (G) 12.05.2018 | MIning Solutions and PL-PPE; Strategie_IH_VEM

Maintenance Department 4: Central Warehouse Timely and efficient supply of spares, materials and components Material, spares and component disposition Storage, commissioning, distribution and shipment av. Spare parts and material stock for mining 66 million € 5 internal petrol stations annual value of mining outtake: 103 million EUR Annual number of spare supply orders: 79 000 Annual number of SAP material orders: 217 300 Annual number of transports for mining: 12 000 Annual number of claims: 700 Workforce: 34 employees full time 12.05.2018 | MIning Solutions and PL-PPE; Strategie_IH_VEM

Already implemented Equipment Optimisations at VEM Main drives on excavators: (equipment and construction) direct drives at bucket chain excavators extension of digging tools optimisation of bucket chains new design of bucket wheel boom head Belt drives converter drives at belt conveyor systems new generation of drives conveying lines on overburden conveyor bridge systems Conveyors: (design and construction) transfers / chute design baffle plate construction idler garland geometry / dimensioning noise emission Control systems and process instrumentation and control centralised operation control (central control rooms) complex systems of production coor- dination and coal quality management tools of plant diagnosis complex automation functions at large opencast mine equipment 12.05.2018 | MIning Solutions and PL-PPE; Strategie_IH_VEM Confidentiality - None (C1),

Extended Process Data Acquisition by Systems Engineering Drums Bearing Belt Gearboxes Undercarriage Idlers drive, operating time PLANT CONDITION Analysis Modelling Optimization Trend Knowledge Parameters History Structure Diagnosis Operating time, reference model Condition, operating time Temperature, vibration tension force, reference model speed, moment, lubrication Process data in functional context (temperature, vibrations, process data) SAFETY AVAILABILITY COSTS 12.05.2018 | MIning Solutions and PL-PPE; Strategie_IH_VEM

Internal Diagnosis-Specialist External Service partner Plant - and Process Diagnostics Maintenance Drive Station Monitoring System Monitoring System Monitoring System Monitoring System Monitoring System Monitoring System Monitoring System Monitoring System Monitoring System LAN Ethernet (LWL) TCP/IP Internal Diagnosis-Specialist Firewall Control centre Systems engineer ISDN- Access- Router WAN- connection Router LAN Ethernet TCP/IP PC-Network Schwarze Pumpe PC-Network opencast mine LAN Ethernet TCP/IP Modem Telephone network External Service partner System maintenance 12.05.2018 | MIning Solutions and PL-PPE; Strategie_IH_VEM

Time balance @ Precut system Jaenschwalde 12.05.2018 | MIning Solutions and PL-PPE; Strategie_IH_VEM

Performance increase Precut system with SRs 2000 (1557) 14,7 Mio.m³ 18,5 Mio.m³ 19,8 Mio.m³ 20,9 Mio.m³ 23,3 Mio.m³ 18,2 Mio.m³ 19,0 Mio.m³ 16,4 Mio.m³ 21,9 Mio.m³ 4.561 m³/h 4.798 m³/h 5.231 m³/h 4.373 m³/h 4.112 m³/h 4.009 m³/h 3.753 m³/h 4.573 m³/h 3.223 m³/h 5 10 15 20 25 30 35 40 45 2001 2002 2003 2004 2005 2006 2007 2008 2009 1.000 1.500 2.000 2.500 3.000 3.500 4.000 4.500 5.000 5.500 [Mio.m³] [m³/h] 12.05.2018 | MIning Solutions and PL-PPE; Strategie_IH_VEM

Maintenance cost per m³ BWE-belt-spreaders system JW 12.05.2018 | MIning Solutions and PL-PPE; Strategie_IH_VEM

Breakdown rate 2011 for BWE – belt-spreader systems 12.05.2018 | MIning Solutions and PL-PPE; Strategie_IH_VEM

Breakdown rate 2011 for Conveyor bridges 12.05.2018 | MIning Solutions and PL-PPE; Strategie_IH_VEM

Breakdown rate 2011 for Coal belt systems 12.05.2018 | MIning Solutions and PL-PPE; Strategie_IH_VEM

Life resource growth vs. maintenance cost: bucket chains Life resource development of one bucket chain in million. m³ Specific cost for bucket chain maintenance in cent/m³ cent/m³ Mio.m³/EK 16 14 12 10 8 6 4 2 8 6 4 2 1991 1992 1993 1994/95 1995/96 1996/97 1997/98 1998/99 1999/00 2000/01 2001 2002 12.05.2018 | MIning Solutions and PL-PPE; Strategie_IH_VEM

Maintenance costs mining 1995-2010 12.05.2018 | MIning Solutions and PL-PPE; Strategie_IH_VEM

Split of maintenance cost in 2010 12.05.2018 | MIning Solutions and PL-PPE; Strategie_IH_VEM

Summary and outlook VEM Maintenance has to ensure an extended equipment fleet service life without performance restrictions having an average age of approx. 38 years Cost reduction and efficiency increase is possible by a systematic identification of potentials and cost drivers in the ongoing operating process Efficient division of responsibilities between commercial data network and process data net-work The data-technical link between Preparation/ Planning, Execution/ Maintenance , Operating Control is the key for a mining-related total process optimization 12.05.2018 | MIning Solutions and PL-PPE; Strategie_IH_VEM

Thank you for your attention!