Lounge Closely Seated Permitted Persons 80

Slides:



Advertisements
Similar presentations
By Annelies Kuypers. For this competition I had to do the following things- Design a performing arts centre for Dio and make at least 2, no more than.
Advertisements

Ras Kisimani Construction Camp. Beach Proposed Kitchen Fire place Guest Tent Toilet Shower Cleared Area Cleared Walkways Manager Tent.
Berwickshire High School Presentation compiled 15 th October 2009.
Magali Pauzié Magali Pauzié $1,000 $2,500 $5,000 $10,000 $25,000 $50,000 $75,000 $150,000 $1,000.
Building for Learning Project Photo Progress Report Month of June 2010 Project commencement 21 st September 2009.
BRIGHTON, UK 8 TH – 10 TH MAY 2014 THE PRINCE ALBERT – DISABLED INFO.
Furniture are things we have in the house: a sofa, a table, a cupboard, a carpet, a desk, a bookcase, a TV set, a cooker, a sink, a bath, a mirror, a bed.
View of Barcombe Village hall from the reservoir. Built in A modern green sustainable hall that can boast a green roof, a rainwater harvesting system,
House of the Future By Michael Shears. Front of House One floor One floor Insulated with mud Insulated with mud Makes own electricity Makes own electricity.
EMERGENCY BRIEFING Institute of Critical Thinking The University of the West Indies Tel: Fax:
Heath and Safety Contractor Induction. AUTHORISATION TO WORK No work should be carried out unless you have been given authorisation from your host Contact.
Floating city design Reg.no Concept- Lotus flower The site platform was evolved from the petals and arrangement of Lotus Flower. Reg.no1030 Evolution.
My house in Brussels Made by Jonas Ercisson. My House Upstairs House from outside Downstairs.
FMP Update to the Congregation Sunday July 20 and 27, 2014.
Thematic Dining Total experience – all senses, intimacy.
Thursday 8 th January To provide an update on the work and new structure of the Governing Body To present the results of the questionnaire.
Hawthorne Hall – LEVEL 1 EXISTING. PROPOSED Hawthorne Hall – LEVEL 1.
Please be informed that this building is equipped with an automatic alarm system. Should the alarm be activated, please remain calm. Our staff will investigate.
Performing Arts Centre By Sarah Reid. Research In my research I looked at lots of picture of top Performing Art Centre's to see what attributes were needed.
„Moderné vzdelávanie pre vedomostnú spoločnosť/Projekt je spolufinancovaný zo zdrojov EÚ“ Inovácia obsahu a metód vzdelávania prispôsobená potrebám vedomostnej.
a bedroom a kitchen a living room a hall a bedroom a bathroom a bedroom.
Vehicle enters through this gate Vehicle exits through this gate 1. Entering and Exiting the Hire Car Zone.
Lift Typical Building Floor Plan. Complete with fire walls. Click on and we will add Some of the different Passive and Active systems that you could come.
Set Design and Lighting Revision Year Which dance piece is this? There is black and white squares on the floor There are five beds There are.
Seating Room for lighting, recording etc. Area behind Stage Wings Stairs Orchestra Pit Wall for Backdrops.
Movie Sponsorship Proposal. About Jupiter Ascending Storyline: Jupiter Jones was born under a night sky, with signs predicting that she was destined for.
POV Renovations November 14,2014. Repairing the East Wall.
Planning For Oakbrook House!. Ground Floor In Oakbrook.
Greater Mt. Zion Baptist Church 26 January 2014 Jackson Galloway Associates, PLLC.
Beth Messiah Congregation Building Committee Status March 27, 2010 Major Congregational Needs Additional Sanctuary seating Continuous enhancement of our.
Codes and costing construction + materials II. Building Code (780 CMR) Building Code (780 CMR) Accessibility Code (521 CMR) Accessibility Code (521 CMR)
Footscray Club Renovation Purpose of the Renovation 1.To improve the facilities for the existing members - Better facilities -Increased comfort -Meet existing.
Photo Album of Model flat as on by Prestige Misty waters.
Olson Hall Classroom Renovations Rooms 101, 105, 118, 125, 141, 163, 227.
By Amy Hansen. Stage Seating Stage Dressing Room Prop Room Area for relaxing and last minute practicing.
CDM Site Induction. Welcome to the ICC. Contents CDM Who’s who Welfare Hall Access Policy Site Rules Emergency Evacuation.
Hall КОРИДОР Kitchen КУХНЯ Pantry Кладовая Living room ГОСТИННАЯ.
New Stainless Counter in Kitchen. Bus Garage New Lighting.
A HOUSE.
Turner Sims - stage layout WITHOUT ORGAN
TOBY ZACK DESIGNS LA MER
Help Ted and Tilly put the furniture in the house.
Bosphorous Mansion tp://.
“kicking on to the finish”
IN THE EVENT OF FIRE OR YOU ARE DIRECTED TO EVACUATE THIS BUILDING
Addition of Fire Alarm system. None existing.
2 BEDROOMS - REF KMI 340 Located 50 meters from la Croisette, on the 2nd floor in a residence just behind the Martinez Hotel, 2 bedrooms apartment with.
Fire & Evacuation Muster Point
East Sussex Village Halls & Community Buildings Conference 2017
Kasbeer Hall, 15th Floor of 25EP
Updated home in good location
Maidsincali info
3. Refurbishment - Project 1
WELCOME TO IT CONFERENCE ROOM
CHAPTER TEN-PLANNING AND EQUIPPING THE KITCHEN
PROJECT 3, UNIT 3 Tomašević Snežana January, 2016
Special Valuation 1017 W First Avenue Odd fellows Hall/Montvale Event Center Commercial.
Special Valuation 1017 W First Avenue Oddfellows Hall/Montvale Event Center Commercial.
Part 1 Introduction You choose to….
ELY FOLK FESTIVAL – Site Plan
Event Security Operations Live Event
Interstate 35 Building Project Update
Презентация для 5 класса
. Game Ranch approximately 1,000 hectare 40 km north of Livingstone and 30 minutes drive from Victoria falls and tourist capital of Zambia.
Around the room Orders of operations.
Welcome to the King’s Somborne Village Hall
Автор: Дулуб Светлана Николаевна учитель англ. яз. ГОУСОШ № 843
Park Place Wesleyan Gala 2019
Fire Escape Plan Bus & Car Drop-off K Playground (Boys) PK Playground
Presentation transcript:

Lounge Closely Seated Permitted Persons 80 Reedham Village Hall Fire Regulations Seating Plan in Lounge and Main Hall Fire Exit Gents Toilet Changing Rooms Lounge Closely Seated Permitted Persons 80 Storeroom Bar Foyer Ladies Toilet Fire Exit Kitchen Main Hall Closely Seated Permitted Persons 220 Stage Cleaning Cupboard Storeroom Fire Exit Fire Exit Last update 25th August 2013

Lounge For Dancing Persons 60 Reedham Village Hall Fire Regulations For Dancing Plan in Lounge and Main Hall Fire Exit Gents Toilet Changing Rooms Lounge For Dancing Persons 60 Storeroom Foyer Bar Ladies Toilet Fire Exit Kitchen Main Hall For Dancing Permitted Persons 180 Stage Cleaning Cupboard Storeroom Fire Exit Fire Exit Last update 25th August 2013

Reedham Village Hall Measurements Lounge and Main Hall etc 35’ Fire Exit Gents Toilet 9’ Changing Rooms 12’ 14’ Lounge Storeroom Bar Foyer 18’ 7’ 7’ 9’ Ladies Toilet 18’ 18’ 14’ 4’ 10’ Fire Exit 18’ 64’ Kitchen 17’ 29’ Main Hall Stage 18’ Cleaning Cupboard 5’ 18’ 10’ Storeroom Fire Exit Fire Exit Last update 25th August 2013

Reedham Village Hall Emergency Lighting Lounge Bar Storeroom Kitchen Fire Exit Gents Toilet Changing Rooms Lounge Bar Foyer Storeroom Ladies Toilet Fire Exit Kitchen Stage Cleaning Cupboard Main Hall Storeroom Fire Exit Fire Exit Last update 8th January 2015