ISO/IEC 17020.

Slides:



Advertisements
Similar presentations
Establishing a New Accreditation Program in the U.S.
Advertisements

EMS Checklist (ISO model)
Dispelling Myths Surrounding ISO/IEC 17020
Environmental Management System Implementation
[Organisation’s Title] Environmental Management System
ISO 9001:2000 Documentation Requirements
Ensuring Better Services and Fair Value “Introduction and roadmap to implementation of ISO in Zambia’s water utilities” Kasenga Hara March 2015.
Environmental Management System (EMS)
The New TNI Laboratory Accreditation Standards Requirements for an Accreditation Body.
ISO 9001 : 2000.
EPSON STAMPING ISO REV 1 2/10/2000.
ISO Culture SHOQ Quiz 1. This program must be run in MS PowerPoint and requires sound. 2. Click “View” and then “Slide Show”. 3. Click “Continue”
The ISO 9002 Quality Assurance Management System
Quality Management System
Transmille Training Quality System.
Quality Assurance/Quality Control Policy
Prepared by Long Island Quality Associates, Inc. ISO 9001:2000 Documentation Requirements Based on ISO/TC 176/SC 2 March 2001.
Changes in new ISO/IEC 17024:2012. ISO/IEC 17024:2012 was published in July 2012.
ISO 9000 Certification ISO 9001 and ISO
THE PRINCIPLES OF QUALITY MANAGEMENT. DEFINING QUALITY Good Appearance? High Price? The Best? Particular Specification? Not necessarily, but always: Fitness.
Technical requirements:
5.2 Personnel Use competent staff Supervise as necessary
4. Quality Management System (QMS)
Instructions and forms
4. Quality Management System (QMS)
CPA is a UKAS company The Assessment Process 2014 Seminars.
JENN SHAFNER BRIAN KROUSE CLINT KEHRES. Pre ISO 9000  The BS 5750 standard required factories to document manufacturing procedures.  BS 5750 was known.
NVLAP Overview and Accreditation Process March 2006.
Bodil Mose Pedersen, DHI Status for implementering af ”Quality Manual”
ISO/IEC A review of the new standard for laboratory accreditation
ISO 9001:2000 QUALITY MANAGEMENT SYSTEM REQUIREMENTS
ISO 14001:2004, Environmental Management System
1/25 S tandardization & Quality Assurance Policy Management Cross- Functional Management Daily Management Suggestio n System Quality Control Circle 5S5S.
| Folie | Folie 2 ISO approach to GHG-inventory QA/QC UNFCCC Workshop on National Systems April 2005, Bonn Doris.
ISO / IEC : 2012 Conformity assessment – Requirements for the operation of various types of bodies performing inspection.
FOURTH EUROPEAN QUALITY ASSURANCE FORUM "CREATIVITY AND DIVERSITY: CHALLENGES FOR QUALITY ASSURANCE BEYOND 2010", COPENHAGEN, NOVEMBER IV FORUM-
4.3 Document control 4.4 Review of requests, tenders and contracts
a guidance to conversion
Paul Hardiman and Rob Brown SMMT IF Planning and organising an audit.
Requirements for the Competence of Providers of Proficiency Testing Schemes ILAC Guide 13:2000 – supplementing ISO Guides 43-1 and 43-2.
QUALITY MANAGEMENT STATEMENT
Webinar FSSC audit report 7th september 2015
ISO Registration Common Areas of Nonconformances.
It was found in 1946 in Geneva, Switzerland. its main purpose is to promote the development of international standards to facilitate the exchange of goods.
TOTAL QUALITY MANAGEMENT
QUALITY MANAGEMENT SYSTEM
Most Common Deficiencies Cheryl O. Morton Managing Director, AIHA Laboratory Accreditation Programs, LLC.
WORKSHOP ON ACCREDITATION OF BODIES CERTIFYING MEDICAL DEVICES INT MARKET TOPIC 9 CH 8 ISO MEASUREMENT, ANALYSIS AND IMPROVEMENT INTERNAL AUDITS.
Improving performance, reducing risk Dr Apostolos Noulis, Lead Assessor, Business Development Mgr Thessaloniki, 02 June 2014 ISO Energy Management.
1 SMA/November 2007 ISO/IEC 17025: International Organization for Standardization.
NCSLI 2007 Training Records from an Auditors Viewpoint Shawn Mason Boston Scientific.
Dr Mairiead MacLennan Quality and Training Manager, Medical Microbiology NHS Fife.
Visit us at E mail: Tele:
DOCUMENTATION ISO/IEC 17025:2005 Documentation.
WORKSHOP ON ACCREDITATION OF BODIES CERTIFYING MEDICAL DEVICES INT MARKET TOPIC 6 CH 5 ISO MANAGEMENT RESPONSIBILITY Philippe Bauwin Medical.
Responsibilities of Test Facility Management, Study Director, Principal Investigator and Study Personnel G. Jacobs Belgian GLP Monitorate Zagreb, 17 December.
ISO Certification For Laboratory Accreditation ISO Certification For Laboratory Accreditation.
A LOOK AT AMENDMENTS TO ISO/IEC (1999) Presented at NCSLI Conference Washington DC August 11, 2005 by Roxanne Robinson.
Software Quality Control and Quality Assurance: Introduction
UNIT V QUALITY SYSTEMS.
Testing and Certification according to ISO and ISO 17065
Standardization in the Beauty and Wellness Sector
Quality Management Systems – Requirements
Achieving ISO Compliance
Technical requirements:
International Organization
How to conduct Effective Stage-1 Audit
ACCREDITATION PROCESS
Presentation transcript:

ISO/IEC 17020

Procedures Policy Instructions

Legally Identifiable Conflict of interest Scope of activities (3) Administrative Requirements Legally Identifiable Conflict of interest Scope of activities Liability

POLICY Legally Identifiable Conflict of interest Scope of activities Liability

Contract Review 1st part of 3.3 indicates the scope of inspections for which the body is competent. 2nd part of 3.3 refers to “the scope of inspection being determined by the individual contract or work order.” 3.4 indicates the inspection body SHALL have adequate liability insurance. (3.4a) 3.5 indicates the body SHALL have documentation (procedures) describing the conditions on which it does business (contractual conditions) Above would be considered as contract review.InspConRev.docx

Procedures Contract Review

Inspection Body type A, B or C (4) Independence, Impartiality & Integrity Independence Inspection Body type A, B or C Confidentiality

POLICY Legally Identifiable Conflict of interest Scope of activities, Liability Impartiality/Independence Inspection Body Type

4.2 Inspection Body Types Type A Body 3rd Party      Type B Body Part of an organization but forms a separate part. supplying services to its parent organization Type C Body Part of a larger Organization which is involved in Manufacture, Design etc and supplies inspection services outside of parent.

(5) Confidentiality Who does this concern?

Scope of activities, Liability Impartiality/Independence POLICY Legally Identifiable Conflict of interest Scope of activities, Liability Impartiality/Independence Inspection Body Type Confidentiality

(6) Organisation &Management Organised to maintain technical functionality ( personnel with the technical capabilities and necessary supervision and support) Responsibilities and reporting structure (Organigrams refer 3.2 also) Permanent Technical Manager (however named – Project Manager) Deputies, Effective Supervision, Job descriptions,

POLICY Legally Identifiable Conflict of interest Scope of activities, Liability Impartiality/Independence Inspection Body Type Confidentiality Organogram (structure) Roles & Responsibilities

Examples: 6.4 Effective Supervision Checking reports, (detail) Observations, Audits (Personnel approval by the Accreditation Body).

7 Quality System??? An effective quality (Management) system is one which monitors and controls the work to deliver technically valid and consistently reliable outputs (Information from the system)

POLICY Policy Objectives &Commitment Legally Identifiable, Conflict of interest Scope of activities Liability Impartiality/Independence, Inspection, Body Type Confidentiality Organogram (structure) Roles & Responsibilities

Policy, Objectives & Commitment (7) Quality System??? (Management System) Policy, Objectives & Commitment Documented System Person with Authority and responsibility for QA

Policy Statement I&S Inspection Services I as the Technical Manager of I&S Inspection Services commit myself and my staff to the implementation of ISO 17020 and the SANAS accreditation requirements. The implementation of the requirements will be the basis for attaining the goals and objectives set by management. The main goals of I&S are to meet customer requirements in the provision of timeous and competent inspections and meeting the business objectives of the company.   This will be done by performing our work in the most effective, efficient and profitable way which will be reflected in the procedures and instructions covering the various activities within our inspection organization. I therefore require all personnel to read, understand and implement the policy of this organization so that all our efforts can be directed towards achieving our goals. This will enable us to service our clients in a professional and efficient manner whilst remaining competitive. Signed ………………. Technical Manager

System Documentation (3 Tier system) Main Policy statement Areas of activity Organigrams Job Descriptions Policies for the required procedures Procedures for control of documents, audits, corrective action, management reviews Other Procedures, Instructions, References Distribution list for Quality Manual

Procedures Contract Review Control of Documents, Internal Audits Management Review “Other Procedures “

Clause 7.3 of ISO 17020 states it must be a documented system. “Other Procedures”

Feedback and Corrective Action Description of the issue Investigation of the cause Description of the immediate action Description of the action to prevent recurrence Identification responsible for the corrective action Target date for completion of corrective action Monitoring of progress of corrective action Sign off of completed corrective action

TECHNOLOGY ORIENTATED ACCREDITATION ACCREDITATION ISO 17020 TECHNOLOGY ORIENTATED The basic requirements for a system where the facility has all the necessary self-regulating procedures, organisation and controls on all factors to demonstrate their competence to carry out inspections to specified requirements (and provide evidence of this). So that it is possible to guarantee (give confidence) that competent inspections are carried out consistently. COMPETENCE BASED

Specific Clauses for attention Confidentiality Personnel Equipment & Facilities Inspection Methods & Procedures Handling Inspection Samples & Items Sub contracting Records Inspection Reports & Certificates “Other Procedures”

(5) Confidentiality Who does this concern?

Personnel with necessary expertise Evidence of competence (6.4d) Qualifications Training Evidence of competence (6.4d)

Personnel with necessary expertise HOW? (2.1c) Definition of Inspection overlaps with Testing & Product Certification. An important difference is that many types of inspection involve professional judgement. Thus the inspection body will have to demonstrate that it has the necessary competence to perform the task. HOW? (2.1c)

(9) Facilities and Equipment Are facilities and equipment suitable for the type of inspections undertaken Use of equipment specified (trained personnel) Equipment identified, maintained, calibrated. Procedure for dealing with defective equipment. Reference standards for traceability of measurement Interim checks proceduralised Purchasing Validation of software, integrity of data

Documented instructions Planning of inspections (10) Inspection Methods and Procedures Documented instructions Planning of inspections Contract review to establish client requirements and capability of meeting the requirements

Contract Review 1st part of 3.3 indicates the scope of inspections for which the body is competent. 2nd part of 3.3 refers to “the scope of inspection being determined by the individual contract or work order.” 3.4 indicates the inspection body SHALL have adequate liability insurance. (3.4a) 3.5 indicates the body SHALL have documentation (procedures) describing the conditions on which it does business (contractual conditions) Above would be considered as contract review.

Inspection Methods & Procedures Documented instructions The Performance of Inspections. Non – conformance / corrective action - Inspections

Inspection Instructions Equipment Operating Instructions

Feedback and Corrective Action - Inspection Description of the issue Inspection Body Investigation of the cause Client Description of the immediate action Client Description of the action to prevent recurrence Client Identification of responsibility for the corrective action Client Target date for completion of corrective action Client Monitoring of progress of corrective action Client/Inspection Body Sign off of completed corrective action Inspection Body

Feedback and Corrective Action - System Description of the issue Inspection Body Investigation of the cause Inspection Body Description of the immediate action Inspection Body Description of the action to prevent recurrence Inspection Body Identification of responsibility for the corrective action Inspection Body Target date for completion of corrective action Inspection Body Monitoring of progress of corrective action Inspection Body Sign off of completed corrective action Inspection Body

Procedures (on-site?) Identification Storage (11) Handling of Inspection Items Procedures (on-site?) Identification Storage

Suitable system for the inspection Body. (12) Records Suitable system for the inspection Body. Sufficient information available for audit trail to reconstruct past inspections Safe storage Readily retrievable

& Certificates Include all necessary results of inspections (13) Inspection Reports & Certificates Include all necessary results of inspections Signed by authorised personnel. Detail client requires?

Competency of subcontractors (14) Subcontracting Competency of subcontractors Register of suitable subcontractors Who would these be? Independent evaluation of results where necessary (14.4)

Concerning recording of complaints/appeals and how resolved. (15)Complaints and Appeals Procedures Concerning recording of complaints/appeals and how resolved.

(16)Co-operation

Policy Procedures Instructions Direction Procedures What we do Instructions How it must be done

ACCREDITATION PROCESS   ACCREDITATION PROCESS  ORGANISATION PREPARES DOCUMENTATION AND IMPLEMENTS SYSTEMS IN COMPLIANCE WITH RELEVANT REQUIREMENTS APPLICATION FOR ACCREDITATION TO SANAS OPTIONAL PRE-ASSESSMENT VISIT ASSESSMENT OF THE APPLICANT DOCUMENTATION SITE ASSESSMENT BY SANAS ASSESSORS RESULTS OF DOCUMENTATION AND SITE ASSESSMENTS EVALUATED BY THE APPROVALS COMMITTEE AND ACCREDITATION STATUS DECIDED SPECIALIST TECHNICAL COMMITTEES  AUDIT SAMPLES/ PROF. TEST. Guide 43  SURVEILLANCE VISITS BY SANAS ASSESSORS SANAS BOARD WITHDRAWL OF ACCREDITATION

Motivation Requirements Resources Implemented System Improvement due To system Knowledge Positive Change Cycle Yes No