Hydrological Information System

Slides:



Advertisements
Similar presentations
Flood Profile Modeling with Split Flows and Weirs
Advertisements

John H. Kerr Dam and Reservoir John H. Kerr Dam and Reservoir U.S. Army Corps of Engineers Wilmington District.
Mark Heggli Consultant to the World Bank Expert Real-time Hydrology Information Systems Workshop Module 4: Data Management Solutions for a Modernized HIS.
DES 606 : Watershed Modeling with HEC-HMS Module 12 Theodore G. Cleveland, Ph.D., P.E 29 July 2011.
Antamina Mine Water Management Model Alan Keizur Golder Associates Roberto Manrique Arce Compañia Minera Antamina User Conference 2006 Background The Antamina.
Notes on river discharge measurements
Hydrological Information System Module 20 – Integrated Reservoir Monitoring System.
RQ30 RADAR SYSTEM (An Australian Perspective) RQ30 RADAR SYSTEM (An Australian Perspective) Malaysia JPS Offices Ampang, Kuala Lumpur 8 th May 2012.
Hydrologic Routing Reading: Applied Hydrology Sections 8.1, 8.2, 8.4.
Reading: Applied Hydrology Sections 8.1, 8.2, 8.4
Hydropower Dams © The GlobalEd 2 Project Photo credit: Noodle snacks, Wikimedia Gordan Dam, a dammed hydro facility in Tasmania.
HYDROPOWER DAMS By Hydro Power Group PYP 6 – Sekolah Ciputra
Green Energy Hydro Power (Hydroelectric Inflow Dam System) By IP Management Pte Ltd
Hydro Power Plant Prepared by: Nimesh Gajjar
Site Selection and Security Considerations Mark Heggli Innovative Hydrology, Inc. Consultant To The World Bank Expert Real-Time Hydrology Information Systems.
Workshop Mark Heggli Consultant to the World Bank Expert Real-time Hydrology Information Systems Module 6: Operations & Maintenance and Training.
Workshop Mark Heggli Innovative Hydrology, Inc. Consultant to the World Bank Expert Real-time Hydrology Information Systems Module 6: Training, Operations.
Structures.
HYDROELECTRIC POWER PLANT. PRELIMINARY INVESTIGATION  The purposes of preliminary investigations are to provide sufficient information to find out the.
South Africa PRIMA Operating Rules. Model Trans-boundary Operating Process PRIMA,TPTC etc Trans-boundary Agreement Operational Committee Representatives.
Site Selection and Security Considerations Mark Heggli Innovative Hydrology, Inc. Consultant To The World Bank Expert Real-Time Hydrology Information Systems.
__________________________ SITES INTEGRATED DEVELOPMENT ENVIRONMENT for WATER RESOURCE SITE ANALYSIS COMPLEX WATERSHEDS SITES IN SERIES.
Global monitoring of runoff and lake storage: - important elements of Integrated Global Observing Systems - integral parts of water resources management.
CE 424 HYDROLOGY 1 Instructor: Dr. Saleh A. AlHassoun.
WATER QUALITY MODEL FOR AGUAMILPA AND EL CAJON DAMS By: Eduardo Parra Ramos Alessia Kachadourian Marras Oliver Obregon Edith Lugo Rushit Hila.
Engineering Hydrology (ECIV 4323)
US Army Corps of Engineers BUILDING STRONG ® Reservoir Simulation Software “Westfield Sub-basin” Presenter – John Hickey, HEC August 2010.
Where I worked for the day Dad’s team manages all of Contact Energy’s generation offers to New Zealand Electricity Market. There is over 20 computer screens.
Penny Coombes Sarah Wharton Gary Davies Simon White River Bee, Desing FLOOD ALLEVIATION FEASIBILITY.
Martin Rule Curve Study Ashley McVicar, APC Maurice James, Water Resources Consulting LLC.
Reservoir Operation Simulation D Nagesh Kumar, IISc Water Resources Planning and Management: M7L2 Simulation.
Hydrological Information System
Flood Routing Applied Hydrology
Hydrology and application of the RIBASIM model SYMP: Su Yönetimi Modelleme Platformu RBE River Basin Explorer: A modeling tool for river basin planning.
Hydrology and application of the RIBASIM model SYMP: Su Yönetimi Modelleme Platformu RBE River Basin Explorer: A modeling tool for river basin planning.
WATER RESOURCES DEPARTMENT
Enrollment No.Name Ketan Laiya Vipul Vasava Prepared by: Guided by Prof. M.J.Zinzuvadia.
Hydropower introduction
5th Shire River Basin Conference 22 February 2017 Shire River Basin Management Project Shire Basin Planning Tool Sub-Component A1 Development of a.
Assessment of hydropower system safety using a systems approach and dynamic resilience June 27, 2017 Civil and Environmental Engineering.
DES 606 : Watershed Modeling with HEC-HMS
Hydrological changes resulting from dam construction
Channel Routing Simulate the movement of water through a channel
DISCHARGE OVER A BROAD-CRESTED WEIR
DES 606 : Watershed Modeling with HEC-HMS
Management of Flood Waters through Mcphee Reservoir
Klamath ADR Hydrology Report
Engineering Hydrology (ECIV 4323)
HYDRO ELECTRIC POWER PLANTS BY Prabhakaran.T AP/MECH
Data Management Solutions for a Modernized HIS
03/02/2006 Flow Routing Reading: 8.1, 8.4, 9.1, 9.2.
Channel Routing Simulate the movement of water through a channel
Hydrological Information System
GANDHINAGAR INSTITUTE OF TECHNOLOGY
By: Kelly Brown Matt Burger
Selection of Site for Hydrokinetic
The Journey of Hydropower in Snohomish County
6.1 BASIC ENGINEERING New ‘modernised’ diversion structures have promoted larger inequity in the distribution of irrigation water between upstream and.
Reservoir Routing.
Reservoir sedimentation
Hydro electric (Hydel) Power Plant
Hydrology CIVL341.
Hydro electric (Hydel) Power Plant
Floods and Flood Routing
Flood Routing.
RESERVOIRS Mahammad IIIT M.TECH STRUCTURAL ENGINEERING.
Engineering Hydrology (ECIV 4323)
Hydrology CIVL341 Introduction
Engineering Hydrology (ECIV 4323)
MECHATRONICS SYSTEMS PRIVETE LIMITED
Presentation transcript:

Hydrological Information System Module – Integrated Reservoir Monitoring System

Examples that refer to products are intended for illustrative purposes only, and do not imply an endorsement or recommendation of any particular product

Integrated Reservoir Monitoring System Inflow Water level recorder in upstream of reservoir preferably at the bridge Storage Water level:: Shaft encoder if stilling well exists or Radar/Ultrasonic in reservoir Spillway Outflow Gated Spillway: Gate sensors to monitor opening and estimate discharge Water level in the downstream of spillway in the river. Canal Outflow Water level in the downstream of spillway in canal Introduction

Options for Reservoirs Need all components of reservoir water balance Inflow + outflow + change in Storage = 0 If sensors are installed for 2 components, third can be estimated However, if all three components are not measured, the losses of reservoir (evaporation and seepage) would be counted towards underestimated inflow or overestimated outflow Inflow Sensors On all tributaries contributing to inflow Outflow Sensors Gate Sensors On all Gates of Spill, Canals or at location downstream in all canals and River outflow Reservoir Water Level Sensor – On the Dam Introduction

Reservoir Monitoring Example 1 Inflow Sensor on Bridge Upstream Reservoir Water Level Sensor in Stilling Well Canal 1 Water Level radar 100 m Away from Gates Canal 2 Water Level shaft encoder in Stilling Well

Criteria for selection Reservoir Water Level First option is Shaft Encoder or Ultrasonic sensor if Gauge well available Second option is Radar from top of Dam, down looking at suitable location upstream side If none is available, Bubbler on upstream side of Dam Reservoir Monitoring - 1

Reservoir Monitoring Example 1 Reservoir Water Level Sensor (Shaft Encoder) on stilling Well

Criteria for selection Inflow Inflow sensor on all Tributaries contributing to Reservoirs A location upstream of reservoir, such that water level in river is always ABOVE Full reservoir level (otherwise the station will be submerged when reservoir is full) Sometime the suitable location could be kilometers away, depending on size of reservoir Reservoir Monitoring - 1

Reservoir Monitoring Example 1 Reservoir Inflow Radar on Bridge

Criteria for selection Outflow Option 1 – Gate sensors on all canals and river outlet Needed on all gates May be suitable option if Automation of Canal gates is needed in future Expansive option if number of gates is high Can share same telemetry infrastructure of Dam level sensor as distance is short Can be calibrated for discharge measurements, no rating curve needed Option 2 – Water level sensors on all canals and River outlet Might need own telemetry system, as distance from Dam could be high Would need rating curves for all water level locations A combination of options, with Water level in canals and Gate sensors for spillway / river outlet A compromise would be needed based on number of sensors needed and number of telemetry stations needed If the hydropower is installed, it is possible to tap energy generation (for each turbine) from SCADA system and using rating curve of turbines, outflow may be estimated Reservoir Monitoring - 1

Reservoir Monitoring Example 1 Canal 1 Water Level radar 100 m away from Gates

Reservoir Monitoring Example 1 Canal 2 Water Level Shaft Encoder on Stilling Well

Reservoir Monitoring Example 2 Outflow Gate Sensors Reservoir Water level Sensor