2007/2008 Consolidated Annual Municipal Performance Report prepared in terms of Section 47 of the Municipal Systems Act.

Slides:



Advertisements
Similar presentations
1 NATIONAL MUNICIPAL CAPACITY COORDINATION AND MONITORING COMMITTEE (NMCCMC) 22 June 2012 Presented to Masibambane Coordinating Committee.
Advertisements

Implementation of the Government Immovable Asset Management Act, 2007 (GIAMA) National Department of Public Works Presentation to the Select Committee.
FARM WORKER AND FARM OCCUPIER HOUSING ASSISTANCE PROGRAMME (FHAP) JUNE 2006.
PRESENTATION TO THE SELECT COMMITTEE ON LOCAL GOVERNMENT AND ADMINISTRATION Budget Briefing BRANCH: MONITORING AND EVALUATION Ms Tumi Mketi 07 May 2007.
CIVILIAN SECRETARIAT FOR POLICE Assessing and monitoring the ability of the SAPS to handle complaints CSP Presentation to the Portfolio Committee of Police.
HUMAN SETTLEMENTS PLANNING Presentation to Human Settlements Portfolio Committee 9 June 2009.
Michalis Adamantiadis Transport Policy Adviser, SSATP SSATP Capacity Development Strategy Annual Meeting, December 2012.
City of Tshwane GDS August Reputation promise/mission The Auditor-General of South Africa has a constitutional mandate and, as the Supreme.
The Issues of Budgetary Reform Unit 3. PFM Reform – Change Management Module 3.2. Preparing and managing a reform programme.
INTOSAI Capacity Building Committee Meeting Stockholm, 8-10 September 2015 SAI capacity from a Post-2015 development agenda perspective The PASAI cooperative.
Expanded Public Works Programme EPWP 4 rd Summit Commission 4 1.
Audit of predetermined objectives Presentation: Portfolio Committee on Economic Development March 2013.
1 Monitoring and Evaluation System Mr M Thibela by Director: Corporate Planning Department: Water Affairs (DWA) 18 August 2009.
COMPLYING WITH THE UN CONVENTION ON THE RIGHTS OF PERSONS WITH DISABILITIES.
CIVILIAN SECRETARIAT FOR POLICE STATUS REPORT ON IMPLEMENTATION OF THE CIVILIAN SECRETARIAT FOR POLICE SERVICE ACT 2 OF 2011 PORTFOLIO COMMITTEE ON POLICE.
Select Committee on Appropriations Wednesday, 29 August 2012 Committee Room M46, Marks Building Presentation by Mr MG Seitisho LOCAL GOVERNMENT TURNAROUND.
Presentation on OPCA and Governance support to Gauteng Municipalities on clean audit achievements: PCC Case Study 22 May 2014.
Assessment of Annual Performance Plan 2014/15 Department of Rural Development and Land Reform 2 July 2014.
Public Service Commission Presentation to the Portfolio Committee on Public Service and Administration 25 May 2007 Batho Pele Audits and Citizen Satisfaction.
A short introduction to the Strengthened Approach to supporting PFM reforms.
The importance of oversight and protecting the public purse PRESENTED BY: HON T GODI 11 MAY 2011.
PRESENTATION TO PORTFOLIO COMMITTEE ON WATER AFFAIRS AND FORESTRY Cindy Damons 28 May 2008 The role of municipalities in managing and giving effect to.
Auditing of Performance A conceptual discussion. Auditing of performance To demonstrate and discuss the differences between auditing of performance information.
PROVINCIAL INFRASTRUCTURE GRANT NCOP 06 March 2006.
MUNICIPAL SYSTEM IMPROVEMENT GRANT QUARTERLY MSIG PERFORMANCE PRESENTATION TO SELECT COMMITTEE OF FINANCE 08 AUGUST 2006.
Life circumstances and service delivery Community survey Finalise pilot survey (June 2006) List of dwellings completed (September 2006) Processes, systems.
PRESENTATION TO THE PORTFOLIO COMMITTEE ON SRSA INFORMATION PERFORMANCE QUARTER 4 OF THE 2015/16 FINANCIAL YEAR Date: 24 MAY 2016.
PFM reform – change management Module 3.2 Preparing and managing a PFM reform programme 1.
1 Progress Report on Operation Clean Audit by 2014 Presentation to Select Committee on Appropriations 29 August 2012.
“Are Quarterly Performance Information Reviews adding Value to our municipalities or are just done for compliance? Follow-the money audit." Paledi Marota,
Your partner in service delivery and development
The British Accreditation Council: ensuring standards
Audit of predetermined objectives
SCOA for Municipalities:
14th CAS meeting Performance reporting Presentation by SAI-SA
Institute of Municipal Finance Officers & Related Professions
THE SELECT COMMITTEE ON LOCAL GOVERNMENT AND ADMINISTRATION
Consolidated Local Government audit outcomes
AUDIT AND RISK INDABA JUNE 2017.
SCOA for Municipalities:
Institutional Effectiveness Plan
Your partner in service delivery and development
PROGRESS REPORT ON IMPLEMENTATION OF THE PUBLIC FINANCE MANAGEMENT ACT
National Treasury 28 January 2009
Select Committee on Cooperative Governance and Traditional Affairs Operational Response Plan Audit Outcome of Municipalities 16 August
SA Fakie Auditor-General
REVIEW AND IMPROVEMENT OF PED REPORTING SYSTEMS
OFFICE OF THE PUBLIC SERVICE COMMISSION
Department of Cooperative Governance
2018/19 ANNUAL PERFORMANCE PLAN FOR MISA
Strategies for improving M&E in South Africa
Consolidated Annual Municipal Performance Report (Section 47) 2013/14 1 November 2016 The Select Committee on Co-operative Governance and Traditional.
CIGFARO ANNUAL CONFERENCE
Framework for an Effective Statewide System of Support
Helene Skikos DG Education and Culture
GUIDE FOR THE PREPARATION
STRATEGY TO REDUCE CASE BACKLOGS TO THE PORTFOLIO COMMITTEE ON POLICE
Assessing Academic Programs at IPFW
Select Committee on Finance (SCoF) National Treasury 10 October 2007
PROGRAMME 2: GOVERNANCE, POLICY & RESEARCH
Generic Service Delivery Toolkit
The Strengthened Approach to Supporting PFM reforms
Eastern Cape Province 2007/08 Municipal Budget Process
30 January 2014 Department of Agriculture, Forestry and Fisheries (DAFF) Briefing to the Portfolio Committee.
ORC Strategic Objective
Director-General: Mr. E Africa
MUNICIPAL AUDIT SUPPORT PROGRAMME
Strategic Management and
Strategic Management and
Presentation transcript:

2007/2008 Consolidated Annual Municipal Performance Report prepared in terms of Section 47 of the Municipal Systems Act

Introduction 1 Background to the 2007/2008 process Findings of previous 2006/2007 CAMPR Summary of the 2007/2008 process 4 Good Practices and Challenges Developing a Municipal Differentiation Model as part of the 2007/2008 CAMPR Findings of the Municipal Differentiation Model as part of the 2007/2008 CAMPR

1. Background to the 2007/2008 process use of local government white paper as back drop

2. Findings of previous 2006/2007 CAMPR In 0607, a number of municipalities (close to 1/3 = 20) struggled with establishment issues A bit more than 1/3 = 30 municipalities were having challenges with the consolidation of operations Few (10 municipalities) were moving towards sustainability

3. Summary of the 2007/2008 process The preparation followed the finalisation of the 2007/2008 Municipal Annual Reports, hence the assumption that “valid” (accurate to audited) information was available Process followed in compiling the 2007/2008 CAMPR: Structured surveys in terms of Provincial Template, and Provincial Core KPIs Report structured as per 5 LGSA KPAs Development of a Municipal Differentiation Model Evaluation and Summary Findings The Provincial Report was tabled to the Provincial Legislature in October 2009 and submitted to National CoGTA and the NCOP thereafter Integrate the findings into a DLGTA Municipal Capacity Building and Support Strategy, now the Local Government Turn Around Strategy

4. Good Practices and Challenges Good Practices (DLGTA support) Provincial standards developed (OPMS Functionality Criteria) Provincial KPI Framework (KPIs, Reporting Template) Provincial and DM OPMS support structures established for monitoring system functionality Municipal Differentiation Model to measure progression Challenges Slow progress of municipal processes in preparing Annual Performance Reports in terms of Section 46 of the MSA as part of Annual Report in terms of Section 121 of MFMA DLGTA capacity constraints Lack of stakeholder coordination (internal and external to DLGTA)

5. Developing a Municipal Differentiation Model In 0708 the 0607 process of municipal differentiation was explored further. A Model was developed to plot indicators against. 4 levels of performance were created.

5. Developing a Municipal Differentiation Model The Model has three dimensions: Performance, Compliance and Data Quality It contains a series of performance benchmarks to distinguish one performance level from another This informs the support programme per municipality

6. Findings of the Municipal Differentiation Model Data Quality: Most municipalities keep record of performance information. The challenge is meeting the requirements of the Auditor General ito auditing performance information

Data Quality: Size of the bubble = the size of the municipal council Municipalities provide better “compliance” information than “performance” information The size of the municipality (capacity) does not influence the quality of information. Quality of information influences the accuracy of “performance” assessment. Most municipalities fall between average to below-average data quality. (between the green and orange lines)

A 3 year programme to support municipalities in OPMS development. REMEDY A 3 year programme to support municipalities in OPMS development. Main aims: Assess performance management functionality Develop municipal specific action plans Provide technical advice and support Specific support around data/ information management, reporting and auditing

6. Findings of the Municipal Differentiation Model Compliance Average compliance of municipalities = 64/100 Compliance appears to be good with a few municipalities needing assistance. This is without exception to their type or capacitated

6. Findings of the Municipal Differentiation Model Performance Red line = the minimum requirement Performance evaluation is influenced by data quality Appears as if larger municipalities perform better wrt basic service delivery

6. Findings of the Municipal Differentiation Model Performance Red line = the minimum requirement Most municipalities just above or under the red line are small category B4 municipalities. Then there are B4s who are performing just as well as B1/B2 municipalities

6. Findings of the Municipal Differentiation Model Performance Red line = the minimum requirement Most municipalities appear to perform above the minimum requirement.

6. Findings of the Municipal Differentiation Model Performance Red line = the minimum requirement Most municipalities appear to perform above the minimum requirement.

6. Findings of the Municipal Differentiation Model Performance Red line = the minimum requirement Most municipalities appear to perform just above the minimum requirement. Largely due to the inconsistencies in measuring what the role of LG is in LED

Findings of the Municipal Differentiation Model Overall Score (Compl and Perf) No municipality perform at a level 3 28 municipalities perform at level 2. Better data will move some into level 3. Level 2 are generally complaint municipalities and performance is above the average

Findings of the Municipal Differentiation Model Overall Score (Compl and Perf) 28 municipalities perform at level 1. Better data will move some into level 2. Level 1 municipalities experience compliance challenges and are performing poor to adequate. No level 0 municipalities (5 were excl due to very poor data provided)

Overall Score (Compl and Perf) Size of the bubble = the size of the municipal council About 20 municipalities are just complying but performance is really low Most municipalities fall within an acceptable compliance area as well as performing adequately No municipality falls within the “ideal state” Not a strong correlation between the size of the municipality and where it lies on the graph

example of a municipal profile from the Differentiation Model

REMEDY Integrate and Align three major projects/ processes into a Municipal Capacity Building and Support Strategy: External Evaluation of the Departmental Support Programmes to Municipalities CoGTA Comprehensive Assessment of Local Government This 2007/2008 CAMPR, especially the findings of the Municipal Institutional Development Model

Accurately profiling a municipality and its challenges Categorizing the issues to identify the intensity of support needed Re-engineer the Department in its new role as cooperative governance facilitator Prepare and adopt detailed Municipal Turn Around Strategies addressing the issues identified

Thank You