DISTRICT 7 DESIGN-BUILD PUSH BUTTON (FEDERAL SAFETY AND STATE FUNDS)

Slides:



Advertisements
Similar presentations
Tracy Lovell, PE A FOCUSED APPROACH TO SAFETY. Provide a Transportation System  Safe  Efficient  Environmentally Sound  Fiscally Responsible.
Advertisements

City of Eugene Certification Project Case Study. Why Did Eugene Get Certified? Can’t do fund exchange ODOT's Local Agency Program More project control.
US Highway 17 (Center Street) Sidewalk Feasibility Study Town of Pierson, Florida.
Florida Department of Transportation, November 2009
State of Florida Department of Transportation SR 7 (US 441) Value Engineering Study September 24-28, 2001 Segment III - From North of Hollywood Blvd to.
Oregon Pedestrian and Bicycle Safety Implementation Plan.
From Island Estates Parkway to St. Johns County Line.
Clinton Street Bridge over the Maumee River ODOT Project DEF May 14, 2015 Public Meeting.
Safety Project Request received by TDOT Safety Project Request sent to RSAR Coordinator Safety Planning Office completes Letter of Findings for internal.
2005 AASHTO Value Engineering Conference Using VE in Design Build Presented by: Jerry R. Blanding Innovative Contracting Engineer FHWA – NRC July 21, 2005.
US 1 COLLEGE PARK – SEGMENT 1 FROM COLLEGE AVE/REGENTS DRIVE TO MD 193 (UNIVERSITY BLVD) Presentation to College Park City Council August 5,
Alachua County Board of County Commissioners March 24, 2009 Main Street Milling & Resurfacing Project Project Update & Plan Approval.
From Planning to Pouring: The Evolution of Safe Routes to School Julie Walcoff, Ohio DOT, Columbus, OH Alex Smith, Columbus Public Health, Columbus, OH.
Capital Improvement Program. During the Annual Strategic Action Plan (SAP) evaluation, long-term needs and priorities are identified by City Council Capital.
ILLINOIS ROUTE 23 (LaSalle St.) DOWNTOWN RE-ALIGNMENT December 2, 2008.
Broward Complete Streets Technical Advisory Committee (TAC) Meeting Monday August 10, 2015.
WELCOME! July 31, 2012 ODOT District July 31, 2012 PURPOSE OF TONIGHT’S MEETING Introduce the project –Reconstruct I-75.
MARCH 9, 2006 Boating Safety and Enforcement Grant Program Regulations Stakeholder Workshop Proposed Conceptual Regulations Department of Boating and Waterways.
Alternate Technical Concepts AASHTO Subcommittee on Design July 28, 2010 Columbia, S.C. KATHY HARVEY State Design Engineer Missouri Department of Transportation.
Signal Optimization Study Community Development Department.
Local Agency Programs An Overview Gonzalo Puente, PE Shaun Bates, PE Development Engineer Project Manager.
Tracy Lovell, PE HSIP PROJECT PROCESS. HSIP Process  Identify the location – RD Corridor, Emphasis Area, etc.  Conduct Road Safety Audit with multi-disciplinary.
COUNTY ROAD 517 Improvements from State Highway 172 to Howe Drive DECEMBER 16, 2015 At Tribal Multipurpose Facility.
Street Design Construction White Bear Avenue Reconstruction Jesse Farrell, P.E &
Florida Department of Transportation Design-Build Push Button Contract David C. O’Hagan, PE State Roadway Design Engineer.
FTA Real Estate March 26, 2014 Christopher S. Van Wyk Director FTA Environmental Office.
Florida Department of Transportation District 7 Design-Build Push Button Contract Florida Department of TRANSPORTATION Presented By: Matt Weaver, P.E.,
PUBLIC INFORMATION MEETING Ridgewood Avenue Safety Improvement Project From North of Falcon Avenue / Riverside Drive to North of Lamont Street in Volusia.
Florida Department of Transportation District-Wide DESIGN-BUILD TOPICS PUSH BUTTON Contract (FEDERAL SAFETY AND STATE FUNDS) Contract Evaluation June 2013.
Florida Department of Transportation DESIGN-BUILD PUSH BUTTON Contract (FEDERAL SAFETY AND STATE FUNDS) Presentation to FHWA EDC 3 Systemic Safety Implementation.
Maintenance and Temporary Traffic Control
S.R. 30A / U.S. 98 / Panama City Beach Parkway Project Development & Environment (PD&E) Study F ROM M ANDY L ANE TO T HOMAS D RIVE I NTERSECTION B AY C.
PRESENTED AND PREPARED BY CITY OF MISSOULA PUBLIC WORKS DEPARTMENT.
A presentation by Kittelson & Associates, Inc. Broward Boulevard Presentation to the Broward MPO TCC and CIR March 2012 Agenda Item NA-1, Attachment.
Visit Our Website at: Click to edit Master title style.
Florida Department of Transportation DISTRICT 7 DESIGN-BUILD PUSH BUTTON Contract (FEDERAL SAFETY AND STATE FUNDS) Contract Evaluation 12/21/10 12/21/20101FDOT.
City of Snoqualmie Tokul Roundabout Project April 10, 2012.
ADA/504 Technical Assistance Tool Ken Woodruff, Civil Rights Program Manager, FHWA.
County Road 19(Manning Road) & County Road 22 Improvements Environmental Study/ Preliminary Design Report November 2008.
Compliance with CCNA F.S..  Advertisement  Longlist  Shortlist  Request for Proposal  Scope of Services Meeting  Technical Proposal Review.
Design Build Projects from the Consultants Perspective
S.R. 30A / U.S. 98 / Panama City Beach Parkway
Sully District Council of Citizens Associations January 25, 2017 Susan Shaw, P.E., Megaprojects Director Virginia Department of Transportation.
Project Status & Right-of-Way Acquisition
Signalized Intersection Lighting
DISTRICT 7 DESIGN-BUILD PUSH BUTTON (FEDERAL SAFETY AND STATE FUNDS)
WELCOME State Road 50 (Cheney Highway) Overview and Methodology
BELLE TERRE BLVD/PKWY CORRIDOR COMMUNITY DEVELOPMENT DEPARTMENT
PROJECT LOCATION Project begins at Garden Lane (East of I-4)
Public Information Meeting NW 100th Street Reconstruction Project
Traffic Control Plan Development Course
Association of Metropolitan Planning Organizations
Meeting of the Hillsborough MPO Board December 5, 2017
Highway Safety Team Staff Meeting SMART Portal HSIP Application Demonstration Systemic Safety Improvement (SSI) November 21,2017.
Midblock Crossings Lesson 12 Publication No. FHWA-HRT
Moving Maryland Toward Zero Deaths
I-85 Widening Project MM Cherokee County Public Hearing March 14, 2017.
Reducing Engineering standards: GOOD OR Bad?
AX7665D82 Areawide Total Maximum Daily Load (TMDL) Design-Build
SR 400 Express Lanes: Market Sounding
I-85 Widening Project MM Cherokee County Public Hearing March 14, 2017.
Environmental Requirements and planning grants
ODOT’s Responsibilities under the Americans with Disabilities Act
The National Environmental Policy Act (NEPA)
Safe Routes to School John Schaefer State Coordinator.
Alex Henry FDOT District Seven Safety Office
Right of Way Certification
STATE ROAD 61/369 CRAWFORDVILLE HIGHWAY
Proposed I-710 Early Action Project City of Huntington Park Slauson Avenue Capacity Enhancement Improvements I-710 TAC Meeting August 2018.
Ron Hancock, PE NCDOT State Construction Engineer
Presentation transcript:

DISTRICT 7 DESIGN-BUILD PUSH BUTTON (FEDERAL SAFETY AND STATE FUNDS) FLORIDA EXPERIENCE 2010

DISTRICT 7 DESIGN-BUILD PUSH BUTTON Purpose and Objective of Design Build Push Button How to select a candidate project ? What about National Environmental Policy Act (NEPA) ? Why Design Build Push Button ? Time Factor Example Innovative Approaches D7 DBPB: Current Task Details D7 DBPB: Future Tasks

Purpose and objective: DISTRICT 7 DESIGN-BUILD PUSH BUTTON Purpose and objective: Streamlined Process Quick Solutions to operational & safety problems Covering wide range of projects Faster results Innovative Approach Biggest bang for the buck Time Factor Similar to the old TOPICS program

How to select a Candidate Project? Scope (FDOT) Design (Consultant) Construction (Contractor) FINAL PRODUCT DISTRICT 7 DESIGN-BUILD PUSH BUTTON How to select a Candidate Project? Operational/Safety Related? NO Qualified For Fed. Safety? END YES R/W Work Program Qualified for State Funded? Safety Project Apply State Funds Apply Fed. Safety Funds State Project State Guidelines Design Build Push Button Federal/State Guidelines

What about National Environmental Policy Act (NEPA) ? DISTRICT 7 DESIGN-BUILD PUSH BUTTON What about National Environmental Policy Act (NEPA) ? FDOT prepares and submits the Categorical Exclusions justification audit report & the Work Program checklist to FHWA Florida division for approval before any safety funded task is issued. Address Federal Highway Process for Safety Related Projects National Environmental Policy Act (NEPA) & Categorical Exclusions 23 CFR 771 - ENVIRONMENTAL IMPACT AND RELATED PROCEDURES 771.117   Categorical exclusions: Categorical exclusions (CEs) are actions which meet the definition contained in 40 CFR 1508.4, and, based on past experience with similar actions, do not involve significant environmental impacts The following actions meet the criteria for CEs in the CEQ regulation (section 1508.4) and §771.117(a) of this regulation and normally do not require any further NEPA approvals by the Administration: Activities which do not involve or lead directly to construction, such as planning and technical studies ….. Approval of utility installations along or across a transportation facility. Construction of bicycle and pedestrian lanes, paths, and facilities. Activities included in the State's highway safety plan under 23 U.S.C. 402 (ie, HIGHWAY SAFETY IMPROVEMENT PROGRAM)

Why Design-Build Push Button ? (Time Factor) DISTRICT 7 DESIGN-BUILD PUSH BUTTON Why Design-Build Push Button ? (Time Factor) Month 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36   LAP LAP Certification* LAP Agreement Evaluation/Selection of Firm/Design Letting/Select a Low Construction Bidder/ Prepare for Construction Construction Design/Bid/ Build Evaluation / Select a Design Firm Design/Review Process Class 1/District Let Prepare 60% Plans 60% Review/Comments/Prepare Final Plans/Review Comments/Prepare Spec. Package Push Button Task Work Order Design/Review Hand off to Construction Design/Build-PB Evaluation / Select a Design/Build (DB) Firm Review/comments/Prepare Final Plans/DB Firm Procurement of Equipment  Construction Project Type Lap certification (Months) LAP Agreement Selection of Design Firm Prepare 60% Plans Task Work Order Design/ Review Process Letting Hand Off to Construction Construction Total Timeline LAP Project 3 4 17 N.A. Already included 9 36 Design / Bid / Build 6 12 30 Class 1 / District Let Push Button 2 1 18 Design Build / Push Button 7 3 (Overlap) 15 * Note : Several ‘Tasks’ can be issued under DBPB versus one task under LAP/Design-Bid-Build Projects

Why Design-Build Push Button ? (Example) DISTRICT 7 DESIGN-BUILD PUSH BUTTON Why Design-Build Push Button ? (Example) Expedite Construction & Cost Saving  Saving lives Example: One 6-mile US 301 segment (2-lane rural highway) in northern Tampa. Lane departure safety is identified as one of the top safety priorities by FHWA & FDOT This corridor has an average 11 lane departure crashes per year. Raised pavement marking is considered as the best engineering approach to address this safety issue. However, the traditional 3-year construction process and high estimated construction cost as a stand alone safety project prohibited D7 to pursue the safety improvement.

Innovative Approach: Share Point Site: http://pushbutton.g-and-o.com/ DISTRICT 7 DESIGN-BUILD PUSH BUTTON Innovative Approach: Share Point Site: http://pushbutton.g-and-o.com/

Innovative Approach: Share Point Site Liaison: Plans Review Process: DISTRICT 7 DESIGN-BUILD PUSH BUTTON Innovative Approach: Share Point Site Liaison: Per this contract, the Design Build team had to assign a part time representative in the Department’s headquarters building (liaison). This person will enable FDOT to reduce the number of plan review submittals as our QA/QC will be continuous. Plans Review Process: With the nature of this contract, quick turn-around from plan reviewers is necessary. The contract time started with NTP for the DB team. D7 Design team took 10 working days or less to review plans and submit comments in the ERC system. The reviewers were also available for meetings with the Design Build team, whenever necessary. Weekly Progress Meeting: FDOT D7 Construction and District Traffic Operations offices proposed this approach to maintain continuous communication with the Design Build team and the various counties involved through weekly progress meetings which will track the design and construction along with discussing issues, if any.

D7 DBPB Task 1 Details: DISTRICT 7 DESIGN-BUILD PUSH BUTTON Let / Start Date : January 19th 2010 Contract Days for Task 1 : 189 Days Completion Date for Task 1: July 31, 2010 Total Cost (Lump Sum): $1,627,82.15 Total Number of Projects: 11 Local Agencies Involved: Counties: Citrus, Hernando, Pasco, Hillsborough and Pinellas; Cities: Tampa, Pinellas Park, St. Petersburg Project Types: Inverted Profile Markings, Signal Improvements, Intersection Improvements, Overhead Warning Signs, ITS Improvements, and Pedestrian Safety Improvements

Future Tasks under current D7 DBPB: DISTRICT 7 DESIGN-BUILD PUSH BUTTON Future Tasks under current D7 DBPB: District 7 Design Build Push Button contract can issue numerous tasks, covering various project types through the life of the contract (2 years in this case) Task 2 - PEDESTRIAN SAFETY IMPROVEMENT (NTP issued): 270 days The task requires the Design Build Push Button team to prepare a set of plans and specifications and construct Pedestrian Crossing High Emphasis Crosswalk Marking Enhancements for up to 249 signalized intersections and 37 mid-block crossing within District Seven. This work is to include but is not limited to installation of ladder style high emphasis crosswalks, pedestrian signals, pedestrian push buttons, curb ramps, sidewalks etc. Task 3 - TRAFFIC OPERATIONS / SAFETY (NTP issued): 150 days The task requires the Design Build Push Button team to prepare a set of plans and specifications and construct concrete medians in the place of existing Qwick Kurb medians in Hillsborough and Pasco Counties at six locations. Task 4 - SIGNAL IMPROVEMENT / OPERATIONS (NTP issued): 270 days The task requires the Design Build Push Button team to prepare a set of plans and specifications and construct traffic signal hanger upgrades in accordance with those plans for up to 144 signalized intersections within District Seven. The work is to include but not limited to installations of traffic signal hanger upgrade, new traffic signal disconnect, new signal cable etc.

Future Tasks under current D7 DBPB: DISTRICT 7 DESIGN-BUILD PUSH BUTTON Future Tasks under current D7 DBPB: Task 5: Inverted Profile Pavement markings for various segments in various Counties Task 6: Median Improvements to provide left turn offsets on Roosevelt Blvd at 58th St. Task 7: ITS Enhancements in Pinellas County from 54th Ave S to North of Skyway Bridge toll plaza Task 8: Realignment of SR 60 travel lanes to fit the need of City of Clearwater near Highland Ave. Task 9: Traffic Signal rebuilds – Pinellas County 3 Locations Task 10: Traffic Signal rebuilds – Pasco County 2 locations Task 11: Traffic Signal rebuilds – Hernando County 3 locations Task 12: Traffic Signal rebuilds – Citrus County 2 locations Task 13: Provide preformed pavement messages / shields / pavement markings at the I-275 & I-4 interchange.