Practitioner Exchange Tim Toohey, Sept 17, 2015 Corvias Solutions.

Slides:



Advertisements
Similar presentations
Golf Course Construction Planning TRF 250 Golf/Sports Field Construction.
Advertisements

MASBO February Information to purchase Services Information to purchase Construction.
OUTSOURCING INDUSTRIAL WASTEWATER TREATMENT Jerzy Kołłajtis – Magda Trybuch –
Legal Perspective on NDOT Alternative Procurements Geoffrey S. Petrov, Nossaman LLP.
Alderman Road Residences Phase II Design Build. Extensive master planning preceded this phase 2003 – Dagit Saylor Master Plan Hanbury Evans Update.
CH/1 © Dr. Christian Hicks and Dr Tom McGovern An analysis of the impact of the restructuring of the UK civil nuclear industry on tier 1 and tier 2 suppliers.
Activities CTC-415. Activity Consumes Time Usually consumes resources (cure time for concrete) Definable start and finish Assignable – V. important –
ESTIMATING By Laith Jacob.
The Organization of the Firm
Lecture(3) Instructor : Dr. Abed Al-Majed Nassar
Managing Risk to Reduce Construction Claims (And Improve Project Success) Presented by Laurie Dennis, PE, CVS-Life, FSAVE.
Chistyakova Nataly O.. Project stakeholders The client is the principal party interested in the carrying out of a project and in its successful outcome.
Syed M. Ahmed, Ph.D. Department of Construction Management Risk Management in Construction Syed M. Ahmed, Ph.D. Department of Construction Management Florida.
Determining Innovative Contracting Methods to Reduce User Costs Stuart Thompson Utah Technology Transfer Center.
Honoraria for Design Build Projects Methodology Assessment Matrix.
Water Treatment Plant No. 2 Concentrate Zero Liquid Discharge August 30, 2011.
Design–Build Contracts G. Hardy Acree Director of Airports Sacramento County Airport System Advantages of of During Turbulent Times.
Introduction Time Quality Cost Project Constraints Success Introduction.
Construction Contracts and Project Delivery Methods
KNX – the benefits. Schneider Electric 2 - IS&C – Aug Content ●Basic arguments ●Added value for: ●Investors ●Wholesalers ●Installers and System.
Stormwater Retrofitting: The Art of Opportunity Prepared by the Center for Watershed Protection.
January 31, …a delivery method in which the construction team is known as the design-builder…and is responsible for taking a concept developed by.
Public-Public Partnerships February 27, ADC WINTER FORUM | PAGE 2 Public – Public Partnerships Boot camp for Defense Communities Craig Zgabay.
CE 366 PROJECT MANAGEMENT AND ECONOMICS Robert G. Batson, Ph.D., P.E. Professor of Construction Engineering The University of Alabama
Regulatory Developments Affecting Southwest Washington Land Use in Southwestern Washington Law Seminars International Vancouver, WA February 11, 2008 Bill.
MGT 575 Summer 2008 Purchasing. MGT 575 Summer 2008 Steps in the Purchasing Process Accurate description of desired commodity or service Selection of.
Project Delivery Methods Part I. What is A Project Delivery Method? The owner’s selection of the organizational structure of the project. Three popular.
Construction of a Transfer Station
P3 Value for Money Analysis (VfM) Definition P3 VfM – A process used to compare financial impacts of a P3 project against those for the traditional public.
RISK MANAGEMENT YULVI. Introduction Time Quality Cost Project Constraints Success Introduction.
LACCD Building the Future THOMAS HALL Director Facilities Planning and Development.
Coeur d’Alene Basin TLG Repository PFT meeting December 9, 2003.
picture Renee Purdy, Environmental Program Manager Los Angeles Regional Water Quality Control Board Renee Purdy, Environmental Program Manager Los Angeles.
Project Delivery Performance Improvement Report to the Oregon Transportation Commission Hal Gard, Technical Services, Geo-Environmental Dee Jones, Technical.
Coquina Coast Seawater Desalination Project TERMS Base Contract TasksBase Contract Tasks – Must be completed – Negotiated and included in the Base Allowance.
Consumer and Organizational Buyer Behavior
Chapter 3 Facility Design and Construction. Chapter Objectives 1.Describe the process of facility design and construction 2.Demonstrate proficiency in.
CHANGING PROJECT DELIVERY SYSTEMS
Innovative Data Management and Planning Strategies for TMDL Compliance
by Awad S. Hanna, Ph. D., P. E. The University of Wisconsin, Madison
Subtitle Statement of Capabilities.
PRESENTER Jose A. Galan ▸ Division Director, Internal Services Department, Real Estate Development Division ▸ Current Chair of the Florida Council For.
IE 8590 Capstone Design Project: Course Overview
Reconstruction site Investigation, Planning, Scheduling, Estimating and Design Eng. Fahmi Tarazi.
CIFA 2016 Workshop Performance Based Infrastructure
Indigenous and Northern Affairs Canada Leveraging Infrastructure Funds
Procurement’s Impact on Logistics.
CHANGING PROJECT DELIVERY SYSTEMS
Quality Management Systems – Requirements
GIS Data Management for SHA’s Bay Restoration Program
LIFT Green Infrastructure Focus Group Kick-off Call
Markets and Regulation: Alternative or Complements?
Anne Arundel County Maryland
Engineering Services PWS/SOO IP Escrow / Licensing Agreement
Strategies Achieving our Goals
PUBLIC PRIVATE PARTNERSHIPS KERJASAMA PEMERINTAH SWASTA
Tom McGovern and Chris Hicks Newcastle University Business School
Chad Doiron / Michael Saunders April, 2007
The Floodplain Management Challenge
Maryland’s Phase III WIP Planning for 2025 and beyond
Introduction DEFINATION :-
About LCRA LCRA is a conservation and reclamation district created by the Texas Legislature in It has no taxing authority and operates solely on.
INDOT Storm Water Management
Controlling Project Cost and Schedule
Construction Contracts
Hamilton Township, Mercer County, NJ Hydrologic Evaluation and Water Resources Recommendations For Planning and Implementation Rutgers Cooperative Extension.
VETS 2 Advantages for Federal Agencies
Boon Snapshot The Boon Group® is a full-service employee benefits company specializing in the design, implementation and administration of cost-effective.
Sustainability and the future of green development
Honoraria for Design Build Projects Methodology Assessment Matrix
Presentation transcript:

Practitioner Exchange Tim Toohey, Sept 17, 2015 Corvias Solutions

Design Team makeup and philosophy Large scale production focused on Design Engineers and the General Contractors The Design Team is made up of: County Representative Local Design Engineers General Contractors Local BMP Expert Maintenance Contractor Third-Party Completion certifier Design Team’s role: Help select projects Peer review Negotiate with suppliers Asset life-cycle considerations integrated into Program. Put West Coast Info into this Make general

Project selection processes Community based approach to the watershed: Advocacy Groups Municipalities Local engineer BMP approach Select BMP and look for opportunity (ponds, stream restoration, etc.) Complex overlay approach Put West Coast Info into this Make general

Overlay approach to Project Selection Through GIS desktop analysis, the design engineer takes broad brush steps to locate potential areas to focus planning efforts The GIS desktop analysis considers: Land ownership Geographic bundling Geographic focus BMP application sites Permit time Exclude sites with bad soil, flood plain, etc.

Potential project areas identified for field verification The GIS desktop analysis creates maps with each potential project area identified Based on field verification, specific project locations are identified, conditions confirmed.

Projects are prioritized on cost basis The Design Engineer, with the help of the General Contractor, provides high and low conceptual cost estimates for each of the devices that were determined to be the best fit BMPs for each Task Order The devices are then prioritized based on cost and long term maintenance considerations

Innovation: Project Delivery System The Clean Water Partnership brings innovation through more flexible delivery system: Connecting General Contractor and Maintenance Contractor to the Design process Flexible contract structure with engineers and contractors and incentivizing each differently Dispensation from onerous permit process Goal: Design/Build vs. Design-bid-build Paradigm shift

GC and Maintenance Contractor involvement Bring Value Engineering, feasibility and constructability to the design process early. Negotiations: Proprietary systems must address GC and maintenance contractor concerns. Project bundling Project sizing Supply stream for planting, media, etc. Cost per acre approach

Flexible contract structure with Primes and subcontractors Design Engineers no longer selling labor or work on a cost per hour basis. DE contracts based on % of construction costs DE connected to GC through contract scope GC services paid with base fee and incentive fee GC competes work on unit price basis CWP can buy in bulk, prior to project and based on planning requirements

Innovation breeds innovation Dispensation from onerous permitting process saving time and engineering costs Alternative Compliance Program: the CWP is able to manage this program more effectively Working with Advocacy Groups Working with municipalities within the County MS4 long-term permit planning Extension of DoE department as flexible resource

Summary Project selection integrates the community and the lifecycle of the facility. The paradigm shift has occurred with the County and now the shift needs to occur with the design engineer and contractors. Project delivery structure is attracting the innovation