Improved Hot Water Code Calculation Interim Progress Report

Slides:



Advertisements
Similar presentations
Green Building Ordinance Transportation and Environment Committee
Advertisements

THE STANDARDS DEVELOPMENT PROCESS STEP 1 PUBLIC AND COMMITTEE PROPOSAL STAGE PUBLIC AND COMMITTEE PROPOSAL CLOSING DATE FIRST TECHNICAL COMMITTEE MEETING.
A Research Institute of the University of Central Florida FBC Mechanical Technical Advisory Committee Teleconference Meeting February 25, 2015 Investigation.
DISPUTES & INVESTIGATIONS ECONOMICS FINANCIAL ADVISORY MANAGEMENT CONSULTING Guidelines for Energy Efficiency Measure Cost and Non-Energy Benefits Subcommittee.
Points of interest Royal assent on 4 th Aug 2009 Seen as.... “historic” “groundbreaking” “setting an international example” Overall Aim To reduce Scotland’s.
Critical Book Review Due Dates March 3 rd -1 pg summary due (what you have read to this date, not the whole book)- 25pts March 10 th –Project proposal.
A Research Institute of the University of Central Florida FBC Mechanical Technical Advisory Committee Meeting June 25, 2014 A Review of Home Airtightness.
June 11, Presents key findings Methods handled by software Compliance results Test report is in two volumes 1 st volume has overall descriptions.
REPORT TO GRPE 71 ST SESSION EVE IWG 1 Electric Vehicles and the Environment (EVE IWG) Informal document GRPE st GRPE, 8-12 June 2015, agenda.
Heat Pump Water Heaters Provisional UES Proposal Regional Technical Forum October 4 th, 2011.
Housing Programs May 2011 Canadian Renovators’ Council Conrad Baumgartner Office of Energy Efficiency - Housing Division Natural Resources Canada.
Item 3: Electrified Vehicle Battery Performance & Durability EVE-14-08e Presented by: USA, Canada EVE-14 meeting April 20,
WP 5: standards Objektives: 1.Make the standard (EN 12975) accepted everywhere without additional national requirements 2.Make “Key-marking” of Solar tanks.
Heat Pump Water Heaters: Tier 2 – Ducted Interior Installations Provisional UES Proposal Regional Technical Forum February 14 th, 2012.
GTRInewFormat.ppt-1 Electronic Systems Laboratory TMC Operator Requirements and Position Descriptions, Phase 2, Kickoff Meeting Presented by Dennis J.
ELP Helper MSE Project Presentation I Aghsan Ahmad Major Professor: Dr. Bill Hankley.
Stronge Teacher Effectiveness Performance Evaluation System
Main Headquarters: 120 Water Street, Suite 350, North Andover, MA With offices in: NY, ME, TX, CA, OR Standard Protocol for Non-Residential.
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee April 8, 2010.
Florida Department of Community Affairs - Codes and Standards Overview: Code Modification Process.
Evaluation Plan New Jobs “How to Get New Jobs? Innovative Guidance and Counselling 2 nd Meeting Liverpool | 3 – 4 February L Research Institute Roula.
Policy Context – The Governments Plan for Action Tyrone Homes Sustainable Energy Policy Division, Defra.
Copyrighted © 2000 PG&E All Rights Reserved TDV Project Residential TDV HVAC Progress Bruce Wilcox Berkeley Solar Group for Pacific Gas & Electric Co.
2009 Impact Evaluation Concerns ESAP Workshop #1 October 17, 2011.
RTF Management Update Jennifer Anziano Regional Technical Forum February 18, 2015.
SEEM Calibration for Manufactured Housing Regional Technical Forum December 13, 2011 Analysis Performed ByAdam Hadley Cursory Reviews ByTom Eckman, Ben.
Residential New SF Energy Star Homes UES Measure Update December 17th, 2013.
AIE Technical Task Force meeting on 1 April 2014, Frankfurt.
Northwest Power Planning Council Residential Space Conditioning and Domestic Hot Water Conservation Resource Assessment Overview of Analytical Process.
“Mapping the current and future risk of overheating in UK homes” First Year Progress Report London-Loughborough CDT By Argyris Oraiopoulos 1.
Week 7 Utility Data Analysis. Essential Elements Identify sources for obtaining utility data: paper form, electronically or from the internet Review utility.
REPORT TO GRPE 69 TH SESSION EVE IWG 1 Electric Vehicles and the Environment (EVE IWG) Informal document GRPE th GRPE, 5-6 June 2014 Agenda item.
Additional Clauses For Consideration To TC100 Guidelines and Procedures Based on Stage 0 Project on Audio, Video, and Multimedia Systems and Equipment.
PRELIMINARY DRAFT EXCERPT RECOMMENDATIONS ON MEASUREMENT AND VERIFICATION METHODS IN THE FRAMEWORK OF DIRECTIVE 2006/32/EC ON ENERGY END-USE EFFICIENCY.
Overview: Code Modification Process Summary. PROPONENT Step 1 - Proponent has a code change in mind MODIFICATION (Mod) Step 2 - Proponent enters the mod.
City of San Mateo 2016 Reach Code
CIS Training November 2016.
DJJ Accountability Rating System
Improved Hot Water Code Calculation
Travel Patterns & Fares
East Hampshire District Council Energy Alton
NATA Foundation Student Grants Process
Standard 189.1: A Pathway to Achieving Emissions Reductions Goals
Date of download: 10/15/2017 Copyright © ASME. All rights reserved.
UNC Modification Proposal 0202 National Grid Distribution
Prof. Maria Loizidou Nicosia, Hilton Park Hotel, 15th June, 2006
Electric Vehicles and the Environment (EVE IWG)
SG Security – Key Accomplishments
Commercial Operations Sub-Committee Update to TAC
The GEO-6 Matrix Drafting Approach
Compliance Software Tool Approval Technical Assistance Manual
Urban Charter Schools Demographics in FLORIDA March 2015
Urban Charter Schools IMPACT in Florida March 2015
Chesapeake Bay Program Principals’ Staff Committee December 20, 2017
FBC Code Development 6th Edition (2017).
IEEE 802 Wireless Coexistence TAG Proposal
Report to WG on TG1 Progress at the March Plenary, 2007
DRG Implementation Overview
Economic Development Department Annual Financial Statements 2011/12
Development of guidance Meeting of the IED Article 13 Forum subgroup
IEEE TGaf Orlando Closing Report
Session Law Water Quality Permitting for Composters
DOER recommendations for BBRS
Patterns of Water Demand
TGs Process, March Date: Author: March 2009 March 2009
CEOS Work Plan Steven Hosford, ESA/CNES, CEO CEOS SIT-34
District and School Accountability System: Proposed Modifications
Our school is using the Arc software to track, measure and manage our environmental footprint and understand how green our school is operating. We are.
City of Santa Paula Water and Sewer Rate Study Results Public Workshop
Ad Hoc Team (AHT) Lifecycle
Presentation transcript:

Improved Hot Water Code Calculation Interim Progress Report FBC Energy Technical Advisory Committee Teleconference Meeting March 3, 2017

Research Purpose and Goal Characterize hot water waste sources Characterize implications of climatic differences on hot water use Characterize energy impacts of hot water recirculation systems and controls with respect to energy consumption in Florida homes Recommend Florida-specific methods to employ in the Florida Energy Code for residential hot water use and energy consumption calculations

Hot Water Systems Research Principal factors not adequately considered by standard building energy code hot water calculations: Variation in service water temperatures by climate location Hot water system design significantly impacts both the quantity of hot water used and energy consumption Hot water circulation pumps can reduce hot water use but also dramatically increase energy use

Expected Outcome and Impact on the Code Project report will include recommendations suitable for consideration by the FBC in determining the most appropriate Florida-specific methods, procedure and calculation for determining the energy use effectiveness of domestic hot water systems for the residential FEC.

Research Approach Four project tasks: Task 1: A “hot water” and “energy” search terms literature review Task 2: Development of hot water energy use calculation procedures by month, climate, circulation design and hot water system type

Research Approach Four project tasks (cont.): Task 3: Compare hot water energy use for 2, 3, and 4-bedroom homes in Miami, Orlando and Jacksonville calculated with new procedures vs. use determined by current code calculation Task 4: Using EnergyGauge simulations, determine and document the difference in overall energy code performance scores for two sample homes (hot water e-Ratios and total e-Ratios)

Progress to Date Task 1 literature review listing provided with interim report Task 2 calculation procedures developed (draft interactive Excel sheet and draft code modification language provided with interim report)

Progress to Date Literature Review: Searched on "hot water distribution" and "energy" terms in NREL, LBNL, ASHRAE and DOE BA databases + general search + other 40+ pertinent documents identified Review to date shows: Anticipated levels of waste Anticipated use factors– including plumbing design, insulation, climate (time of year and location) and occupant demographics

Progress to Date Calculation Procedure Development: Starting point was ANSI/RESNET 301-2014 Addendum A-2015 Florida-specific adaptations include: Calculation by month Florida climate adjustment (Tmains and Fmix) FL climate examples: Tallahassee, Jacksonville, Daytona Beach, Orlando, Tampa and Miami

Progress to Date Calculation Procedure Development: Starting point was ANSI/RESNET 301-2014 Addendum A-2015 Florida-specific adaptations include: Calculation by month Florida climate adjustment (Tmains and Fmix) FL climate examples: Tallahassee, Jacksonville, Daytona Beach, Orlando, Tampa and Miami Solar and HRUs addressed “upstream”

Interactive Hot Water System Calculator (Draft) Progress to Date Interactive Hot Water System Calculator (Draft)

Proposed Code Change Language (Draft) Progress to Date Proposed Code Change Language (Draft)

Next Steps Task 3: Compare hot water energy use for 2, 3, and 4-bedroom homes in Miami, Orlando and Jacksonville calculated with new procedures vs. use determined by current code calculation Task 4: Using EnergyGauge simulations, determine and document the difference in overall energy code performance scores for two sample homes

Project Completion Literature review summary Document Task 3 and 4 results Final report delivered by June 1st