LN2 Cooling Development D15

Slides:



Advertisements
Similar presentations
Copyright 2007 Hanlab All rights reserved Remote Monitoring System (RMS – M2) April 09, 2009 Hanlab Co., Ltd.
Advertisements

Mass Spectrometer Auto Sampler Kyle Sala Jake Ahrens Stephen Pearson Seth Yellin.
ALICE DCS Workshop Day 10th September The Cooling and Ventilation Control System D. Blanc, Process Control Team and Project Leader CERN ST/CV-Design.
Integrated Laparoscopic Operating Theatres
INTRANET UPDATE DOWNLOAD AND SET UP GUIDE.
Development of [NH 3 ] Ammonia target for Cyclone-30 at KFSH&RC F. Alrumayan, A. Alghaith, Q. Akkam, A. Marsood, A. Hendy and M. AlQahatani KFSHRC, RIYADH.
Clean Air Box Usage & Care CABs RAMs CO Monitors.
Drafting RLL. SLC 500 Processor Operating Cycle Event in Operating Cycle Input Scan Program Scan Output Scan Communications Processor Overhead.
Introduction To Programmable Logic Controllers
Program Name or Ancillary Texteere.energy.gov Process Heating Assessments Michael R. Muller USA Rutgers University, Center for Advanced Energy Systems.
1. Scope of the Project Diagnostic tools are already being used by GE for compressor performance, but they are… – Too expensive – Time Consuming – Hazardous.
From the NXT top menu Connect desired hardware as indicated Enter a command in the box indicated from the menu provided Repeat for all 5 boxes.
UK e-Science and the White Rose Grid Paul Townend Distributed Systems and Services Group Informatics Research Institute University of Leeds.
1 New baseline for the magnet cooling system Yury Ivanyushenkov Engineering and Instrumentation Department, Rutherford Appleton Laboratory.
Healthy Computing Workshop 19 th May  Sensors – many different types  Hub – sensors connect to (wireless/wired)  Software Application – displays.
Irradiation Scanning System suitable for silicon & passive materials (with cooling) H Marin-Reyes R French P Hodgson K Parker P Dervan J A Wilson D. Parker.
Irradiations/ Birmingham Status Paul Dervan The University of Liverpool, UK ATLAS12 Sensor Testing Meeting 16/01/141.
A* candidate for the power supply Wiener MPOD-LV crate w/ remote control only (except for local on/off switch) Type “EC LV” Front or rear connections (reverse.
The Birmingham Irradiation Facility Scanning System suitable for silicon & passive materials (with cooling) H Marin-Reyes R French P Hodgson P Dervan J.
WP8.3.3 Status of Cold Boxes & Irradiation of Si sensors Maurice Glaser Frederico Ravotti Michael Moll Graham Beck, Jag Mistry Gianluigi Casse, Paul Dervan.
VELO workshop, Amsterdam, april ‘00M.Ferro-Luzzi Difficulties with current mechanical design recent FEA results: to obtain sufficient stiffness of center.
1 THERMAL CONDUCTIVITY OF SILICATE BONDED SAMPLES Status of measurements with the thermal conductivity facility in Firenze June, 7 th 2007.
WP8.3.2 Common infrastructure for facilities Sensor cooling at the Birmingham Irradiation Facility Maurice Glaser Frederico Ravotti Michael Moll Gianluigi.
NETWORK ADMINISTRATOR. EXAMPLES OF SOME COMPUTING RELATED CAREERS Multimedia Artist / Graphics Artist Information System Manager Computer Scientist Network.
Colchester Laparoscopic Jane Hendricks Bsc (hons) Surgical Care Practitioner: Laparoscopic Surgery Integrated Laparoscopic Operating Theatres: The Way.
Status and possibilities for the irradiation facility in the PS East Hall Michael Moll, Maurice Glaser 10 March 2010 – IRRAD Working Group - some notes.
By: Elizabeth Campbell.  Fluorescence is a useful tool for chemists to determine what wavelength of light a compound emits.  A Fluorescence Spectrometer.
Projective Virtual Reality Freund and Rossmann Summarized by Geb Thomas.
1 Daniel Dobos University Dortmund Pixel Testbeam July 2003 Daniel Dobos University Dortmund – E4 ATLAS-/Si-Meeting Pixel Testbeam July.
Si-detector macroscopic damage parameters during irradiation from measurements of dark current evolution of with fluence Craig Buttar, University of Sheffield.
Data Logging (Part 1).
Dementia Training Support Group Rhiannon Thorn. Why have a support group? This year again the demand for dementia training has continued to increase but.
M. Gilchriese Thermal Shock. M. Gilchriese 2 Thermal Shock - Sector 9 Use liquid nitrogen vapor to cool sector rapidly. Setup is just dewar, valve and.
Scientia Training Guide How to log on and save Joanne Millard Updated January 2009.
M.Moll, M.Silari, H.Vincke – 3.April Feedback  In total 134 forms filled:
ESA Harwell Robotics & Autonomy Facility Study Workshop Autonomous Software Verification Presented By: Rick Blake.
40 Minutes Left.
1 PST Heaters – Proposed Segmentation Forward = 2289mm. 6 hoops. 10 heaters Barrel = 1606mm. 4 hoops. 7 heaters.
June , RD50 Workshop1 Jan B o hm, Jan Brož, Zdeněk Doležal, Peter Kodyš, Petr Kubík, Marcela Mikeštíková Neutron irradiation program in Prague Charles.
Commissioning / Reliability Runs / Dry runs 1 Jan Uythoven, LIBD meeting on LBDS Reliability Run 04/02/2014 Nov – Dec 2013 Commissioning individual MKDs.
Irradiations at Birmingham cyclotron Procedure 1.
RD50 RD50 Workhop: CERN Katharina Kaska Epitaxial silicon detectors irradiated with protons and neutrons Katharina Kaska, Michael Moll RD50 Workshop.
Odyssey Tutorial. First Step To use Odyssey the Server Enabled box must be checked. Odyssey should be left open (it can be minimized) to be available.
FROM MENTEE TO MENTOR University of Birmingham BAME Student Employability Project to first year UG mentor Presented by Jane Tope & Joel Graham-Blake.
Hybrid CMOS strip detectors J. Dopke for the ATLAS strip CMOS group UK community meeting on CMOS sensors for particle tracking , Cosenors House,
Online Employee Benefits Management System. Agenda  What is BenefitNet  How BenefitNet Works  Sample workflows  HR System  Key Benefits  Implementation.
Irradiations / Birmingham Status Paul Dervan, Tony Affolder and Sven Wonsak The University of Liverpool, UK Paul Dervan, Paul Hodgson, Kerry Parker, Matthew.
Upgrade of the irradiation facilities in the PS East Hall Maurice Glaser, Michael Moll 30 April 2010 – PH-DT steering board meeting activities are part.
Programme for the Physics Start-up Stable and radioactive beams Jose Alberto Rodriguez, BE-OP-PSB (167538)
Irradiation of ATLAS12A and 07 pairs at CYRIC Nobu U., Tony A., /8/22 ITk strip sensors meeting, Y. Unno1.
3/15/2011Nigel Watson / NA62 Meeting. History Radial Ridge Cyclotron – since 2004 Scanditronix MC40 variable energy cyclotron maximum energies 40 MeV.
The New Primary National Curriculum
Remote Medicine A New Paradigm in Medicine.
KIT TA Status Felix Bögelspacher, Bärbel Bräunling, Wim de Boer, Alexander Dierlamm Prof. Dr. Max Mustermann | Name of Faculty.
→ need to guide UV light into gap; also beware temp effects
ITK Strip Module Meeting; 12st October 2015
Group meeting, 2nd Sept, 2013; JAW
Sample Changer Robot (at PX beamlines)
Web :
P13045 Mobile Pediatric Stander
Real-Time Telepathology in VISN 8
Displaying sensor values while a robot is running
Use power series to solve the differential equation. {image}
نرحب بجميع الحضور الرجاء اغلاق أو اخفات الهواتف المتحركة
Services Panagiotis Bouklis European Dynamics SA.
Use power series to solve the differential equation. y ' = 7xy
Schematic diagram of the cryogenic system
Algebra II Chapter 1 Review.
SMART-CALLER BEDEXIT-PIR INSTRUCTIONAL PRESENTATION
CELTIC-NEXT Innovate UK Summer Briefing
Presentation transcript:

LN2 Cooling Development D15 LN2 Cooling Development D15.8 Cold Irradiations at Birmingham Cyclotron Facility The LN2 cooling system is working exceptionally well. It can achieve a stable 120 temperature of -50 C in 30 minutes. The xy scanning robot then moves the sample mounted in the cold box through the proton beam to complete a cold irradiation. Issues with any annealing of sensors have now been solved (see B’ham presentations). [Bottom left image] Resource efficiency has improved allowing parallel development with UoB irradiation programme activities. The second scanning system robot with liquid nitrogen cooling is completed. [Top right image] Located within the new “Robotics Foundry” housed within the first series of new buildings at USFD. This new seven storey, 5355 m2 building is specifically for collaborative, inter-disciplinary research groups in this case, Sheffield Robotics Duplicate system completed Fully networked with UoB system to allow real-time software updates and trouble shooting / alterations Remote connection to UoB system 99% completed Tele-operation of the UoB system from Sheffield or the Sheffield system from UoB is now possible via remote connection UoB staff being trained on the use and development of the scanning system. The current cold box is to be replaced with a new design, reducing area and payload on the scanning robot system ~ mid 2017 Production of new cold box est end 2017 UoB staff training during 2017 Teleoperation of systems needs careful safety analysis. Networked support needs use and evaluation. The new cold box design is completed. Waiting for a workshop slot to be available to being production. Due to the low level of funding from AIDA2020 and removal of a UK-ALTAS staff post at USFD, it is prohibited to request a production advancement at this time.