Detector Hall Design and Cost Information CONVENTIONAL FACILITIES

Slides:



Advertisements
Similar presentations
SiD Surface assembly Marco Oriunno (SLAC) MDI-CFS Meeting Sep. 4-6, 2014, Ichinoseki (Japan)
Advertisements

Assembly Hall in Hybrid-A’ and ILD 2014/9/6 Yasuhiro Sugimoto 1.
Global Design Effort Goals and Introduction Andrei Seryi, SLAC, September 17, 2007.
1 IR Hall for GLD Oct Y. Sugimoto KEK. 2 Underground hall HybridPure CMS IR hall area (WxL)25x55 Beam height8.6 Crane max hook height20.5 Largest.
SiD assembly Marco Oriunno (SLAC), May. 14, 2014 ALCW 2014, Fermilab Infrastructures & Timeline for Hybrid Access.
Global Design Effort Detector concept # Plenary introductory talk IRENG07 Name September 17, 2007.
DH in Hybrid-A and ILD 2014/9/5 Yasuhiro Sugimoto 1.
Experimental hall in Japanese mountain site Y. Sugimoto ILD MDI/Integration 1.
Global Design Effort Detector concept Plenary introductory talk IRENG07 Kurt Krempetz September 17, 2007.
Conventional Facilities and Siting Global Design Effort Safety Requirements for IR Conventional Facilities and Siting Group Safety Requirements for IR.
Construction and Installation of the CLIC Experimental Area
Status of ILC Barry Barish Caltech / GDE 17-Aug-07.
NuMI NuMI Overview NBI 2002 S. Childress (FNAL) 14 March ‘02 NuMI / MINOS Overview.
Global Design Effort - CFS ILC CFS and Global Systems Meeting 1 ILC CFS AND GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP GENERAL.
CES Status J.Osborne 6 November 2009 Status Report from Civil Engineering and Services Working Group J.Osborne GS/SEM for CES Working Group.
1 Alternative assembly option of ILD Y.Sugimoto 2010/10/18 ILD Integration
Experimental hall in Japanese mountain site Y. Sugimoto 1.
1. Civil Engineering works for Linear Colliders* : -Brief introduction on the overall machine layout (just for CLIC at this stage) -Experimental Area.
Global Design Effort - CFS SiD Collaboration Meeting - SLAC 1 VERTICAL ACCESS ILC IR LAYOUT for SiD and ILD CONVENTIONAL FACILITIES AND SITING.
ILC experimental area - How to ‘develop’ CFS details for TDP (cavern size, number of shafts, HVAC, EL spec etc) ? - KEK site specific issues CFS V.Kuchler.
September 18, 2007H. J. Krebs1 SiD Collaboration One Piece End Door Design Concept plus Forward Equipment Interfaces H. James Krebs SLAC September 18,
10/2010 IWLC2010 Global Design Effort 1 Brief Overview of Interaction Region Conventional Facilities in RDR Times Presenter Tom Lackowski.
The ILC IR John Amann ILC Mechanical Engineering 09/12/06.
MDI DBD Editors Report Tom Markiewicz/SLAC SiD Collaboration Meeting, SLAC 22 August 2012.
May 2011 ILC - ILD ILD Workshop 2011 LAL, Paris 1.
Progress on Remote Handling Systems TAC 12 Magnus Göhran – WPM 15 th October 2015.
3/20/11 ALCPG11 Global Design Effort 1 CFS Detector Hall Considerations Tom Lackowski.
ILC D RAFT P ROJECT S CHEDULE K LYCLUSTER 500GeV K Foraz & M Gastal ILC Mechanical & Electrical Review and CFS Baseline Technical Review Many thanks to.
SiD Engineering and Solenoid Kurt Krempetz (Layer 5) (Layer 1) VXD.
GLD experimental hall and detector assembly Y.Sugimoto KEK 27 Sep
Construction Schedule for Baseline and Hybrid A’ Configuration 1 5 th September, 2014 J-POWER MDI-CFS Meeting - Ichinoseki City, JAPAN.
March 22, –  Design Concept & Hall Layout  Access Tunnel  Top heading Tunnel  Displacement of detector hall by push-pull operation.
Philip Burrows MDI Panel Meeting 15/08/06 Philip Burrows John Adams Institute Oxford University SiD and IR/MDI Issues.
September 20, 2007H. J. Krebs/B. Wands/B. Cooper1 SiD Collaboration Preliminary End Door Design Concept Support of Forward Systems H. James Krebs Bob Wands.
ILD and SiD in Japanese site (from discussions in SiD/ILD E/D Interface Working Meeting) Yasuhiro Sugimoto, Marco Oriunno 2011/12/15 SiD
Global Design Effort Working Groups A & C Parallel Session Summary IRENG07 A. Herve, T. Markiewicz, T. Sanuki, Y. Sugimoto V. Kuchler, A. Enomoto, J. Osborne.
Global Design Effort - CFS ILC CFS and Global Systems Meeting 1 ILC CFS AND GLOBAL SYSTEMS MEETING CONVENTIONAL FACILITIES AND SITING GROUP CFS.
Experimental hall in Japanese mountain site 2011/11/30 Yasuhiro CFS Webex meeting 1.
PHG - Detector Estimates - Daresbury - July 12-13, 2010 ILC - Global Design Effort 1 What is included in the Cost Estimates for the ILC Detectors? Peter.
Long-Baseline Neutrino Facility LBNF Far Site Conventional Facilities (FSCF) Scope and Interface Overview Tracy Lundin as borrowed from Headley & Willhite.
SuperB Integration SuperB Experimental hall. Related topics of Slac D&D activities.
M.Oriunno, SLAC 1 SiD installation with horizontal access shafts Marco Oriunno, SLAC SiD/ILD Engineering Meeting SLAC, December 2011.
1 Update of detector hall in mountain regions Y.Sugimoto in Granada.
ILC CONVENTIONAL FACILITIES A. Enomoto, V. Kuchler, J. Osborne
ILC CONVENTIONAL FACILITIES A. Enomoto, V. Kuchler, J. Osborne
Experimental Hall in Mountain Regions
SiD Collaboration Meeting SLAC, December 2011
Temporary Works – P8 Project Practice.
LBNF CAD models, Drawings and Component list
Updated Design of Detector Hall
Yasuhiro Sugimoto 2012/2/1 ILD integration meeting
FCC Civil Engineering John Osborne, Jo Stanyard, Matt Stuart(SMB - Site Engineering - FAS Section) Cost & schedule Phase 3 - specification 10th May 2017.
LCWS11 AWG9 PARALLEL SESSION SUMMARY
Marco Oriunno (SLAC), March 12, 2014 MDI WG
Experimental hall design in Japanese site
$150K Chicago/ANL seed funding for Braidwood site investigation
Interaction Region Alternative Layouts
5th FCC Infrastructure & Operation meeting
Update of experimental hall in Japanese mountain site
Detector hall in mountain regions
Detector Hall Tom Lackowski ILD Workshop 2011 LAL, Paris
ILC DRAFT CONSTRUCTION SCHEDULE Flat topography & Mountainous sites
Sub-Detector Assembly Area Summary of discussion at ALCW2015
Cost & Schedule between Shaft and Adit for Access of Detector Hall
Tom Lackowski Revised 10/12/2011
Detector hall in mountain regions
RDR Baseline Layouts for Interaction Region
SiD IR Layout M. Breidenbach, P. Burrows, T. Markiewicz
8-10 April 2014 CFS-ADI Joint Meeting
Magnet, Support and Infrastructure
Presentation transcript:

Detector Hall Design and Cost Information CONVENTIONAL FACILITIES AND SITING T. Lackowski 12/13/2011 SiD/ILD Engineering & Detector Interface Working Meeting

12/13/2011 SiD/ILD Engineering & Detector Interface Working Meeting

Cross Section Thru IR Hall 12/13/2011 SiD/ILD Engineering & Detector Interface Working Meeting

Cross Section Thru ILD Garage 12/13/2011 SiD/ILD Engineering & Detector Interface Working Meeting

12/13/2011 SiD/ILD Engineering & Detector Interface Working Meeting

12/13/2011 SiD/ILD Engineering & Detector Interface Working Meeting

Draft CFS TDR Preparation Schedule XXX 12/13/2011 SiD/ILD Engineering & Detector Interface Working Meeting

12/13/2011 SiD/ILD Engineering & Detector Interface Working Meeting

12/13/2011 SiD/ILD Engineering & Detector Interface Working Meeting

Building Plan 12/13/2011 SiD/ILD Engineering & Detector Interface Working Meeting

From Marco Oriunno Granada Spain Rating Scale 1÷5 : 1=Low, 5=High # Layout 1 Layout 5 Rating Scale 1÷5 : 1=Low, 5=High # Requirement Layout 1 Layout 2 Layout 3 Layout 4 Layout 5 1 Surface assembly of Magnet 4 3 2 Underground installation of Tracker, Calorimeters and Forwards Number and Size of Cranes Costs: Shafts and Halls size 5 Infrastructures NA 6 Easy Maintenance, Smooth Operation 7 Beam Comissioning 8 Safety   Final Score 14 22 16 17 27 From Marco Oriunno Granada Spain Layout 4 Layout 3 Layout 2

Cost of Shaft Excavation Includes excavation, lining, pre-grouting Costs are for projected depth FY 12 dollars Cost of impact on crown not included Crown support cost may increase due to stress concentration Shaft Diameter in Meters 12/13/2011 SiD/ILD Engineering & Detector Interface Working Meeting

Detector Hall Excavation RDR volume = 116,167 CM Hall as shown = 121, 940 CM Cranes and Platforms ILD and SID Platforms in Hall Additional Crane in Hall Two 40 Tons, one in each Garage areas Plus one XX Tons in IR Region Additional Cranes in Building 4000 Ton Main Hoist Two 400 Ton. One in each Assembly Building Plus XX Ton over Cryostat Shaft 12/13/2011 SiD/ILD Engineering & Detector Interface Working Meeting

Finishes (unless needed for structural support) Catwalks and Access All platforms and stairs/ladders for the Detector is provided by each detector group CFS will provide catwalk in IR Hall and access to cranes Finishes (unless needed for structural support) Floors Cast in Place Concrete, Steel Troweled Finish Walls Formed Cast in Place Concrete in IR Hall Shotcrete in Garage Spaces Roofs Shotcrete, Rolling Drip Ceilings at shafts 12/13/2011 SiD/ILD Engineering & Detector Interface Working Meeting

12/13/2011 SiD/ILD Engineering & Detector Interface Working Meeting