DA Establish GEOSS Best Practice Registry

Slides:



Advertisements
Similar presentations
Page 1 WGISS Response to GEO/CEOS-SIT Ken McDonald WGISS/Vice-Chair.
Advertisements

GEOSS Data Sharing Principles. GEOSS 10-Year Implementation Plan 5.4 Data Sharing The societal benefits of Earth observations cannot be achieved without.
Work Plan Development Guidelines and Schedule.
Work Plan Development Guidelines and Schedule.
GEO-5 in Ottawa 1 29 November 2004 Draft GEOSS 10-Year Implementation Plan and Status Report on Reference Document Ivan B. DeLoatch, Toshio Koike, Robert.
SIF Status to ADC Co-Chairs
Slide # 1 Report to ADC AR Status Doug Nebert, POC U.S. Geological Survey.
Integrated Ocean Observing System (IOOS) Data Management and Communication (DMAC) Standards Process Julie Bosch NOAA National Coastal Data Development.
Best Practices Wiki Ruth Duerr NSIDC, IEEE Jay Pearlman, IEEE Siri Jodha Singh Khalsa, IEEE Report to GEO Committees February 2008.
Slide 1 WGISS CEOS WGISS 22, Annapolis September 2006 Report on GEO Architecture & Data Committee (ADC) Report on GEO Architecture & Data Committee.
25th CEOS Plenary | Lucca, Italy| 8-9 November 2011 CEOS Executive Officers Report Agenda Item 17 Timothy Stryker CEOS Executive Officer Kerry Ann Sawyer.
OSIAM4HE Proposed org structure Authored by the strategy and organization team.
Report of the IOC Task Force on the GEOSS Common Infrastructure (GCI) Ivan DeLoatch, U.S. Geological Survey Alan Edwards, European Commission Co-chairs.
Best Practices Wiki Ruth Duerr NSIDC, IEEE Jay Pearlman, IEEE Siri Jodha Singh Khalsa, IEEE Report to ADC Committee May 21, 2008.
Best Practices Wiki Ruth Duerr NSIDC, IEEE Report to GEO Committees September, 2008.
© GEO Secretariat 5.2 Monitoring and Evaluation John Adamec Co-Chair, M&E Working Group GEO-XI Plenary November 2014 Geneva, Switzerland.
Getting Involved in the Research Data Alliance Stefanie Kethers
GEO Implementation Plan 2025 Barbara Ryan & Espen Volden GEO Secretariat SIT Workshop Agenda Item 15 CEOS SIT Technical Workshop CNES, Montpellier, France.
GEOSS Survey Design Draft John Adamec. Survey Design Schematic Substance Question Sections Sorting Questions Are you familiar with GEO/GEOSS? YN Which,
7 th GEO Capacity Building Committee Meeting Tashkent, Uzbekistan 3-4 June 2008 CB-07-01a Task report Marta ANGOLOTI AEMET Spain.
Status Report GEO Task AR Interoperability among Digital Elevation Model (DEM) Ryosuke Shibasaki.
ST Kick-off Promoting Awareness and Benefits of GEO in the Science and Technology Community Douglas Cripe – GEO Secretariat Frascati/Brussels
3rd WG meeting, Brussels Proposed Plan for Governance of the Washington Group Prepared by: Jennifer Madans, Barbara Altman, Beth Rasch (USA); Renée Langlois.
1 Group on Earth Observations WORLD METEOROLOGICAL ORGANIZATION Weather – Climate - Water Dr Donald Hinsman, WMO Secretariat Focal Point for GEO.
Slide # 1 GEO Task AR Architecture Implementation Pilot George Percivall GEO ADC Meeting, 14 & 15 May 2007.
Science and Technology Committee GGOS, December 2006.
© GEO Secretariat Work Plan Guidance document 2 nd Capacity Building Committee Meeting, Brussels September 2006.
Call for Proposals: Earth Observations in Decision Support Joint Effort of GEO Capacity Building Committee and User Interface Committee.
ADC Meeting # 2, Seattle, July 2006 Slide # 1 Overview of ADC activities (Committee) Ivan Petiteville, CEOS Meeting # 2, Seattle, July 20-21, 2006.
Slide # 1 Report to the GEO ADC on the Standards and Interoperability Forum 12 Sept 2007 National Academy of Sciences Washington, D.C. IEEE Committee on.
Task AR-07-03: Global Geodetic Reference Frames Report to ADC-4 prepared by Hans-Peter Plag (IAG/GGOS) Nevada Bureau of Mines and Geology and Seismological.
Task ID_01 “Advancing GEOSS Data Sharing Principles” The Group on Earth Observations Data Sharing Activities for 2013 Reported by Lerato Senoko 29 th EXCOM:
Introducing the Science and Technology Roadmap 1 st GEO/EGIDA Workshop Bonn, Germany, May 09 th - 11 th, 2011.
WGISS - GEO Way Forward Issue 1.0 Ivan Petiteville WGISS-24, DLR Oberpfaffenhofen Thursday Sep. 18, 2007.
HL7 Coordination of Care Services Project April 14 th, 2014.
GEO Standards and Interoperability Forum SIF First Organizational Meeting 27 July 2007 Barcelona, Spain.
1 DA POC/Lead: Doug Nebert (USGS) Leads: George Percivall (OGC) Rita Almeida Ribeiro (HOLOS, Portugal) Ken Masarie (NOAA) Martha Maiden (NASA) Jimmy.
Architecture Task AR Status Presented to the July Meeting of the GEO and Architecture and Data Committee Dr. Thomas C. Adang AR Point.
Page 1 WGISS Response to GEO/CEOS-SIT WGISS-22 Updates Ken McDonald WGISS/Vice-Chair.
GEOSS Common Infrastructure Initial Operating Capability Directions and Discussion Presented to GEO ADC Geneva May
CB b: Identifying Best Practices, Gaps & Needs.
Report from GEO Post-2015 WG and GEO Ministerial WG D. Brent Smith, NOAA CEOS Representative CEOS SIT-28 Meeting Hampton, Virginia, USA 12 March 2013.
Work Plan Work Plan Management (Document 21)
Capacity Building in: GEO Strategic Plan 2016 – 2025 and Work Programme 2016 Andiswa Mlisa GEO Secretariat Workshop on Capacity Building and Developing.
Committee on Earth Observation Satellites CEO Team Plenary Agenda Item #4 29 th CEOS Plenary Kyoto International Conference Center Kyoto, Japan 5 – 6 November.
© GEO Secretariat Work Plan Management Update GEO Work Plan Symposium 30 April – 2 May 2012.
GEO Programme Board Status and key messages Tim Haigh Programme Board co-chair.
GEO Task DI Update for ADC and Workplan Presentation to ADC May 2007 Chu Ishida for Guy Séguin (CSA)
CEOS Response to GEOSS Water Strategy
ESA-FAO GEOPortal STATUS & PLANS
PROJECTS & APPLICATIONS SUBGROUP
Steve Peedell Joint Research Centre
AR Doug Nebert, POC-elect GEO ADC Co-Chairs Meeting,
Overview of GEOSS Data Sharing Principles and Implementation GEO-XIII Plenary Side Event Towards Open Earth Observation Data Policies Wenbo Chu GEO.
The Standards and Interoperability Forum
Overview of Documents for Third Earth Observation Summit
Capacity Building Enhance the coordination of efforts to strengthen individual, institutional and infrastructure capacities, particularly in developing.
GEOSS Data Sharing Principles
George Percivall September 2008
Joint IPR/DAI Workshop
Work Plan Management GEO Work Plan Symposium 30 April – 2 May 2012
Selection of a Winning Team: The Review Process and Timing of Responses to the Holyoke Innovation District Request for Proposals Bob Kispert MTC’s John.
WMO IT Security Incident Process
Research Participant Satisfaction
Enabling Climate Services – The Group on Earth Observations (GEO) Barbara J. Ryan Director, GEO Secretariat GFCS Dialogue Geneva, Switzerland 01 July.
CEOS Response to IPWG on Draft GEO Strategy
JCOMM Submitted by: TT-MOWIS (Doc 03b)
Stephen Briggs European Space Agency SIT Workshop Agenda Item #13
Wrap up Both groups: Identified good opportunities for cross-validation of work Noted the need to establish relationships with user groups Should assess.
CONSTITUENT BODY REFORM (CBR)
Presentation transcript:

DA-06-09 Establish GEOSS Best Practice Registry Work to be performed: Request hosting proposals and recommend host to maintain GEOSS Best Practices Registry, associated to GEOSS societal benefit areas. Establish GEOSS Best Practices Registry according to an agreed process for editorial review. 3. Launch agreed process and solicit GEOSS Best Practices input from GEOSS Members and Participating Organizations.

Schedule Start: 2nd Quarter 2006 Draft of Approach: June 2006 End: End of Year 2006; may not make it if limited response Accomplishments: Emailed out to potential responders; no response yet. Met with Ruth Duerr of CU/NSIDC and agreed on a work breakdown for the two of us. Agreed that we must email contact more people to contribute to this effort. How do we do that within the GEO context – support from Secretariat?

Email contacted: GTOS GTOS Secretariat John Latham GTOS@fao.org INCOSE James Martin james.martin@incose.org IOC IODE Lesley Rickards ljr@bodc.ac.uk Robert Keeley keeley@meds-sdmm.dfo-mpo.gc.ca JCOMM   POGO

Status • June 15, 2006 Contacts with Task Team have been initiated. • CEOS has requested to join the team (no response yet). • GTOS expressed interest in proactive participation (no response yet). • Team meeting will be planned for the first half of July (delayed to the fall). • Prof. William Emery has accepted the role of Lead POC.

How GEOSS Relates to Interoperability (thanks to Ruth Duerr)

Future Actions • Contact all GEO members to solicit their interest and find a home for the Best Practices Registry. • Task team needs to query the wider community for a larger list of Best Practices for the Registry. • Meet with interested parties by email and telecons in August/September. • Coordinate with new NRC panel on geophysical data (Emery is a member).