ASSOCIATED PROFESSOR KIRIL STOICHEV, PhD

Slides:



Advertisements
Similar presentations
Module N° 4 – ICAO SSP framework
Advertisements

Critical Infrastructure Protection Policy Priorities Sara Pinheiro European Commission DG Home Affairs.
EMS Checklist (ISO model)
[Organisation’s Title] Environmental Management System
Business Continuity Training & Awareness by Sulia Toutai (ANZ)
IAEA International Atomic Energy Agency. IAEA Outline Learning objectives Introduction Functions of Regulatory Body (RB) on EPR Appraisal guidance: Part.
Technical University of Sofia Safety and Environmental Engineering Laboratory (SEEL) November 2003.
TEL382 Greene Chapter /27/09 2 Outline What is a Disaster? Disaster Strikes Without Warning Understanding Roles and Responsibilities Preparing For.
Main Requirements on Different Stages of the Licensing Process for New Nuclear Facilities Module 4.7 Commissioning Geoff Vaughan University of Central.
EASTERN MICHIGAN UNIVERSITY Continuity of Operations Planning (COOP)
Session No. 3 ICAO Safety Management Standards ICAO SMS Framework
Technical Meeting on Evaluation Methodology for Nuclear Power Infrastructure Development December, 2008 Nuclear Safety in Infrastructure Building.
Part of a Broader Strategy
Ship Recycling Facility Management System IMO Guideline A.962
Module 3 Develop the Plan Planning for Emergencies – For Small Business –
Basics of OHSAS Occupational Health & Safety Management System
Information ITIL Technology Infrastructure Library ITIL.
IRSN STRATEGY TO ASSESS A NEW MAINTENANCE POLICY / Nesebar, Bulgaria Presented by Naoëlle MATAHRI, IRSN.
Presented by: Meg Boyd The Blue Mountains Drinking Water System: DWQMS Overview.
Important points and activities.  The objective is to secure life, property, information in the event of a disaster and to facilitate business continuity.
Health and Safety Policy
Private & Confidential1 (SIA) 13 Enterprise Risk Management The Standard should be read in the conjunction with the "Preface to the Standards on Internal.
Copyright 2008  Project management process groups progress from initiating activities to planning activities, executing activities, monitoring and controlling.
SMS Planning.  Safety management addresses all of the operational activities of the entire organization.  The four (4) components of an SMS are: 1)
INFORMATION SECURITY MANAGEMENT L ECTURE 3: P LANNING FOR C ONTINGENCIES You got to be careful if you don’t know where you’re going, because you might.
Workshop on Implementing Audit Quality Practices Working Group on Audit Manuals and Methods March 2006 Vilnius (Lithuania) Hungarian Experiences.
4rd Meeting of the Steering Committee on Competence of Human Resources for Regulatory Bodies Vienna, 4-7 December 2012 Current Status of the Human Resources.
Erman Taşkın. Information security aspects of business continuity management Objective: To counteract interruptions to business activities and to protect.
Business Continuity Disaster Planning
Ministry of Finance Compliance assessment of the management and control systems of the managing authorities under the Operational programmes. Conclusions.
Business Continuity Planning 101
AUDIT STAFF TRAINING WORKSHOP 13 TH – 14 TH NOVEMBER 2014, HILTON HOTEL NAIROBI AUDIT PLANNING 1.
MANAGEMENT of INFORMATION SECURITY, Fifth Edition.
CRITICAL INFRASTRUCTURE RISK ASSESSMENT SUPPORT CIRAS PROJECT OVERVIEW 2nd Stakeholders’ Workshop Aschaffenburg, November, 26th, 2015 Jaime Martín, Project.
SUNY Maritime Internal Control Program. New York State Internal Control Act of 1987 Establish and maintain guidelines for a system of internal controls.
BUSINESS IMPACT ANALYSIS OF THE NPP’ SYSTEM FOR REMOVING THE HEAT WORKSHOP: “Business Continuity Management (BCM) of the Nuclear Power Plant (NPP) System.
Information ITIL Technology Infrastructure Library ITIL.
Information Security Policy
Implementing SMS in Civil Aviation: the Canadian Perspective
Office 365 Security Assessment Workshop
MANAGEMENT of INFORMATION SECURITY, Fifth Edition
Template Contents of the Low Carbon Development Strategy (LCDS)
Crisis management related research at
Health and Safety Policy
Integrated Management System and Certification
Occupational Radiation Protection during High Exposure Operations
CIRAS FINAL CONFERENCE
The International Plant Protection Convention
PROJECT MANAGEMENT (ARCH 484) DEPARTMENT OF ARCHITECTURE & BUILDING SCIENCE.
Business Continuity Planning and IT Risk Management
Critical Infrastructure Protection Policy Priorities
NERC Critical Infrastructure Protection Advisory Group (CIP AG)
Cybersecurity Special Public Meeting/Commission Workshop for Natural Gas Utilities September 27, 2018.
Oman Experience on Telecommunications Emergency Plan
RCF Plenary Session 21 September 2018
Regulatory Oversight of HOF in Finland
IS-700.A: National Incident Management System, An Introduction
Project Management Process Groups
Nuclear Emergency Planning and Preparedness
Operationalizing Export Certification and Regionalization Programmes
High level seminar on the implementation of the
Continuity of Operations Planning
Business Continuity Program Overview
Cyber Security in a Risk Management Framework
European Programme for Critical Infrastructure Protection (EPCIP)
Roles and Responsibilities
Closing event 16th July 2019 Technical Assistance for Establishing the Institutional Framework for the Implementation of AIS/AES Project funded by the.
Role of Evaluation coordination group and Capacity Building Projects in Lithuania Vilija Šemetienė Head of Economic Analysis and Evaluation Division.
Management of Change GROUP HSE RULE (CR-GR-HSE-302)
Emergency & Crisis Management​ GROUP HSE RULE (CR-GR-HSE-701)
Presentation transcript:

ASSOCIATED PROFESSOR KIRIL STOICHEV, PhD With the financial support of the Prevention, Preparedness and Consequence Management of Terrorism and other Security-related Risks Programme. European Commission-Directorate-General Home Affairs BUSINESS CONTINUITY MODEL OF THE NPP’ SYSTEM FOR REMOVING THE HEAT PROJECT: “DEVELOPMENT OF TOOLS NEEDED TO COORDINATE INTER-SEKTORAL POWER AND TRANSPORT CIP ACTIVITIES AT A SITUATION OF MULTILATERAL TERRORIST THREAT. INCREASE OF THE CAPACITY OF KEY CIP OBJECTS IN BULGARIA - HOME/2010/CIPS/AG/019” WORKSHOP: “Business Continuity Management (BCM) of the Nuclear Power Plant (NPP) System. Modeling and Procedures Development of Advanced System for Security and Water Channel Protection (ASSWCP) of the NPP” KOZLODUY NPP, 05 of JUNE, 2012 ASSOCIATED PROFESSOR KIRIL STOICHEV, PhD

BUSINESS CONTINUITY MODEL OF THE NPP SYSTEM FOR REMOVING THE HEAT MODULE 1 BUSINESS IMPACT ANALYZE OF THE “KOZLODUY” NPP SYSTEM FOR REMOVING THE HEAT, ITS TRANSFORMING INTO KINETIC POWER OF THE STREAM TURBINE ROTATION AND INCREASING OF THE SYSTEM PROTECTION AGAINST TERRORIST THREATS TASK 2 BUSINESS CONTINUITY MODEL OF THE NPP SYSTEM FOR REMOVING THE HEAT

PARTICIPANTS Project Manager: Associated Professor Kiril Stoichev, PhD - Institute of Metal Science, Equipment and Technology with Hydroaerodynamics Centre "Academician A. Balevski” (IMSETCHA- BAS). IMSETCHA-BAS: Assoc. Prof. Tsanka Kamenova, PhD, Asssoc. Prof. Todor Stoichev, PhD, eng. Dimitar Dimitrov. NATIONAL DEFENCE ACADEMY “G.S. RAKOVSKI”: Colonel Associated Professor Miroslav Dimitrov, PhD; Lutenant Colonel Nikolay Kotsev; Associated Professor Nikolai Denchev, PhD; Associate Professor Lyubomir Vitanov, PhD; Head Assistant Professor Lyubosvet Stoev. NPP “Kozloduy” PLC: Anelia Cvetkova, Sashka Nikolova, Emil Kichev, PhD, eng. Dimitar Popov, Vladimir Marinov. TASK DESCRIPTION The implementation of this task requires elaboration of Business Continuity Plan of the “Kozloduy” NPP System for removing the heat, its transforming into kinetic power of the Steam Turbine Rotation – further below presented as “the System”. Duration: 08.06.2011 – September 2012 г.

INTRODUCTION The scope of the technological/business continuity processes comprises management activities and integrated plans that create conditions to maintain the continuity of critical for certain organization processes. This scope covers all aspects of an organization unit, which take part in the maintenance of the critical processes and they are: personnel; buildings; suppliers; technologies; data. Its determinative role particularly grows when the case in point is to guarantee the continuous operation of critical infrastructure objects and most of all those defined as such in power engineering.

Methodology and Model of Business Continuity Management of Critical Infrastructure Creating of unified Methodology and Model of Business Continuity Management of Critical Infrastructure will bring the following effects: • Providing conditions of carrying out reliable assessment of the critical activities and processes and improvement of their viability which guarantee acceptable operation of the objects under conditions of impact on their performance and characteristics; • Increase of the training efficiency of the officials in charge of the objects continuous operation; • Providing conditions to improve the continuous operation good practices; • Decrease of the expenditures for building Business Continuity Management Systems of critical infrastructures and objects; Multiplication of the above said results in the critical infrastructures of power engineering and transport of the EU member countries.

METHODOLOGY OF PLANNING THE INFRASTRUCTURE OBJECTS CONTINUOUS OPERATION The methodology will contain, but without being limited to, the following components: Terminology standardization; Identification of the major, minimum obligatory planning stages; Determination of the approaches to create Business Continuity policy and Strategy; Description of the obligatory preliminary analyses (such as for instance Business Impact Analysis), that should be performed in the stage of plan preparation with the purpose of determining the critical processes and the impact degree on them by the various kinds and types of threats; Determination of alternative decisions and priorities to secure continuous operation as well as approaches to their realization; Determination of the type of plans (Incident Response and Management Plan, Business Recovery and Resumption Plan, Communications&Media Plan, etc.); Determination and choice of different methods and manners to put the plans in operation with the purpose to obtain the best final results; Determination of adequate methods, forms and approaches of personnel training; Selection of approaches to create data bases and process automation; Development of mechanism for planning monitoring and realization of the activities for continuous operation maintenance.

MODEL OF CRITICAL INFRASTRUCTURE BUSINESS CONTINUITY MANAGEMENT SYSTEM The Business Continuity Management is not only the preparation of plans. It is necessary, after the planning phase, to develop activities in support of the progress of the efforts in direction of permanent improvement of the planning and transformation of the accompanying processes in a part of the overall culture of the respective organization. For that purpose a Business Continuity Management System of the NPP “Kozloduy” System for removing the heat, its transforming into kinetic energy of the steam generator of reactor WWER- PWR type will be developed. The base of the development is BS 25999 - 2:2007 and good practices at this area.

Business Continuity Management Policy; The system scope will be defined which will include obligatory but will not limit to: Business Continuity Management Policy; Business Continuity Management Strategy; Business Impact Analysis; Risk Assessment; Business Continuity Management Plan; Corrective and preventive actions; Training.

BUSINESS CONTINUITY MANAGEMENT POLICY The purpose of this policy is to formalize a program for continuity of the system and to define guidelines for developing, maintaining and exercising Business Continuity Plan. The policy sets out the basic principles and framework necessary to take adequate action in emergencies, sustained recovery and resumption of operations and activities of the System during and after the terrorist attacks. The scope of this Business Continuity Management Policy is limited up to the System elements and their location in the System.

STRUCTURE 1. DESCRIPTION OF THE TASK 2. PURPOSE 3. SCOPE 4. STATEMENT OF THE POLICY: Policy intent; Policy objectives and principles. 5. POLICY COMPLIANCE 6. APPLICABLE INTERNATIONAL OR NATIONAL STANDARDS 7. KEY STAKEHOLDERS 8. APPROVAL DATES 9. POLICY SPONSOR 10. CONTACT PERSON

BUSINESS CONTINUITY MANAGEMENT STRATEGY STRATEGY GOALS AND ELEMENTS: determined by the management executive officer responsible for BCM; • provides strategic support from company management for BCM; • identify other key roles and responsibilities; • creates conditions that BCM program is aligned with strategic objectives of NPP KOZLODUY. Main Results: • providing strategic support at the highest level for the management of the entire BCM program; • determining the framework for compliance with best practice set out in British Standard- BS 25999.

RISK MINIGATION – Main strategies: 1.1 Provision of physical and perimeter security for NPP buildings; 1.2 Detection systems of fire outbreaks and their suppression; 1.3 Uninterruptible Power Supply (UPS systems); 1.4 Standing back up for electronic data; 1.5 Reliable storage of critical documents on hard copy; 1. 6 Records Management; 1.7 Regular maintenance of emergency equipment and materials; 1.8 Prior checking of staff before taking up employment; 1.9 Secondment, leave the staff on holiday and the appointment of replacements; 1.10 Providing multiple suppliers of critical products and services; 1.11 Training of personnel for actions in different situations; 1.12 Management succession.

3. CRITICAL FUNCTIONS RECOVERING . 2. IMPACT MITIGATION. 3. CRITICAL FUNCTIONS RECOVERING . 4. CONTINUITY STRATEGIES FOR CRITICAL FUNCTIONS 4.1 Alternative workplaces; 4.2 Communication tools; 4.3 Equipment & Materials; 4.4 Personnel.

Business Continuity Plan 1.1.1 Main Goals Development of BCP management structure against terrorist threats that affect the System, respectively NPP Kozloduy; Documenting the critical information needed to accomplish BCP; Provide guidance to the growing development to NPP Kozloduy against terrorist threats which which could result in enforcement of this BCP. 1.1.2 Scope The scope of the BCP is limited to those elements and their locations in the system.

Business Continuity Plan 1.2 BUSINESS CONTINUITY PLAN POLICY 1.2.1 Developing and Implementing a continuity plan; 1.2.2 Business Continuity Planning Framework; 1.2.3 Testing, Maintaining and Re-assessing the Business Continuity Plan; 1.3 BUSINESS CONTINUITY PLAN ASSUMPTIONS 1.4 BUSINESS IMPACT ANALYSIS (BIA) SUMMARY 1.5 BUSINESS CONTINUITY STRATEGY

Business Continuity Plan 1.6 PLAN DEVELOPMENT METHODOLOGY 1.6.1 The plan contains, not limited, the following information: Strategy for overcoming incident; Minimum Recovery requirements for Business Continuity; List of Team-members, rights and responsibilities and PoC; List of off-site materials; Activities grouping into phases.

Business Continuity Plan 1.6.2 Each activity describes : What has to be done; How it can be done; Who can do it; What is needed to do it; Where it can be performed from; When it can start; How long it should last; When it should end?

Business Continuity Plan 6.3 The activities will be grouped in the following phases [1]: Phase 1 – Initial Response & Assessment; Phase 2 – Interim Contingency Measures; Phase 3 – Resource Provisioning; Phase 4 – Operations Resumption; Phase 5 – Return to Normal. [1] Phase: A phase is a grouping of activities used to provide a logical structure for each team’s plan.

THANK YOU VERY MUCH FOR YOUR ATTENTION! INSTITUTE OF METAL SCIENCE, EQUIPMENT AND TECHNOLOGIES WITH HYDROAERODYNAMICS CENTRE BULGARIA, SOFIA, 1574, 67, SHIPCHENSKI PROHOD blvd., TEL.: + 359 2 46 26 200, FAX: + 359 2 46 26 300