PROJECT INFORMATION SESSION Small Business Enterprise 2/5/2009 PROJECT INFORMATION SESSION Small Business Enterprise SR 44 from Lake/Sumter County Line to SR 44/CR 468 Project 427230-1 December 13, 2010 Derek Dixon Consultant Project Management
PROJECT LOCATION End Project Begin Project
PROJECT LIMITS LIMITS: SR 44 - Begin MP 0.000 (Lake/Sumter County Line). CR 468 - End MP 2.468 MITS (Pavement Change East of CR 468/SR44).
SPECIFIC PROJECT DETAILS The Pavement Design Will be Done by The Department Restripe the Urban Section to Accommodate a 4.0’ Bicycle Lane
PROJECT INFORMATION Old Construction Projects Numbers – 238040-1 and 238241-1 Level of Community Awareness plan : 1 Stormwater Management District : SJRWMD Number if Existing Utilities : Eight – AT&T - Distribution & Transmission Bright House Networks, LLC City of Leesburg – Electric, Gas and Water Comcast Cable Progress Energy Century Link Posted and Design Speed : SR 44 – Posted 55 MPH (MP 0.000 to MP 2.220) Posted 45 MPH (MP 2.220 to MP 2.365) Design Speed (From plans for 238241-1) SR 44 – Design 65 MPH (MP 0.000 to MP 1.600) Design 45 MPH (MP 1.600 to MP 2.365)
IMPORTANT DATES Advertisement – January 11th, 2011 Letters of Interest – Response Deadline January 21st, 2011 Short-list – February 7th, 2011 Final Selection – March 31st, 2011 PE Begin – May 2011 Note: These dates are preliminary and subject to change.
CD CONTENTS Technical Scope Straight Line Diagram Right-of-Way Maps Construction Plans Project Information Session Presentation
PROJECT SCOPE Mill and Repave Existing Asphalt and Paved Shoulders Eastbound and Westbound Lanes 2 Roadway Typical Sections Reconstruct 17 ramps and a pedestrian island at SR 44/CR 468 intersection Install Approximately 3 Detectable Warning Devices on Existing Curb Ramps Minor Sidewalk Additions