PROJECT INFORMATION SESSION Small Business Enterprise

Slides:



Advertisements
Similar presentations
Project Description and Needs Lincoln Way Widening Addition of a center-turn lane and safety improvements to the grade and horizontal alignment. Needs.
Advertisements

Maryland Avenue and Arkwright Street Jerry Auge, PE Project Manager Ramsey County April 2, 2013.
CR 236 Resurfacing from US 441 to I-75 30% Plans Alachua County Board of County Commissioners September 28, 2010.
Alachua County Board of County Commissioners NW 16 th AVENUE / NW 23 rd AVENUE FROM NW 57 th Terrace to NW 13 th Street.
City of Toledo Bancroft Street Neighborhood Public Meeting November 20, 2013.
District 2 System Preservation Projects for FY 15 and FY 16 Gregory B. Holsey - District Engineer Thomas S. Revelle - Assistant District Engineer – Project.
Insert project map NOTICE OF PUBLIC INFORMATION MEETING Florida Department of Transportation Project History The Florida Department of Transportation (FDOT),
County of Fairfax, Virginia Sully District Council Meeting November 19, 2014.
FDOT District 5 MAINTENANCE RESURFACING SR 100 Moody Boulevard from East of I-95 to SR A1A Ocean Shore Boulevard GENE VARANO PROJECT MANAGER 719 S. Woodland.
US Highway 17 (Center Street) Sidewalk Feasibility Study Town of Pierson, Florida.
S.R. 256 Road Reconstruction Project From City of Austin to S.R. 203 Thursday, February 6, 2014 Austin Elementary School 6:00 p.m.
Economic Stimulus Information Meeting Project Information Overview March 18, 2009 W. H. Stuart Center.
From Island Estates Parkway to St. Johns County Line.
Polk Transportation Planning Organization 2035 Mobility Vision Plan June 2010 Steering Committee - January 28, 2010 Polk Transportation Planning Organization.
In this Presentation…. Project Overview Key Issues Elements of Design Funding and Schedule.
Borough of Madison Green Avenue Reconstruction Engineering CY2012 Existing Conditions Underground Infrastructure Municipal Aid Application Reconstruction.
Phase 2: 30% Design Plans September 4 th, 2012.
Community Development Department Construction Phase BULLDOG DRIVE.
MD 97 (Georgia Avenue) at Randolph Road Purpose Improve vehicular, bicyclists and pedestrian safety Improve Levels of Service Increase capacity Improve.
STA Safety Project PID #76439 December 12, 2006.
PROJECT SCOPE OVERVIEW SR 60/E Kennedy Blvd From N Nebraska Ave To N Ashley St FPN PRESENTER: LIYANAGE INDIKE RATNAYAKE SEPTEMBER 04, 2015.
SR 256 Road Rehabilitation Town of Austin January 18, :00pm Austin Elementary School.
COUNTY ROAD 517 Improvements from State Highway 172 to Howe Drive DECEMBER 16, 2015 At Tribal Multipurpose Facility.
Program Manager Administrator
1 MD 5 (Point Lookout Road) Leonardtown (Phase 1) Intersection Reconstruction At Abell and Moakley Streets Informational Meeting January 19, 2016.
The Safety Impact of the Automated Photo Red Light Program Prepared by Lieutenant Jim Lemmon San Leandro Police Department Traffic Division.
EAST CHEROKEE DRIVE PROJECT UPDATE CHEROKEE COUNTY ENGINEERING DEPARTMENT MARCH 31, 2016.
City of Belmont Pavement Reconstruction Project October 15, 2014.
Girvin Road Improvements (Atlantic Blvd. to Wonderwood Dr.) Public Information Meeting March 3, 2016.
Evergreen Highway Corridor Update Planning Commission Workshop March 22, 2016 Jennifer Campos, Senior Planner.
Excellence - Integrity - Service - Creativity - Communication Courts of Canterbury HOA Meeting Rufe Snow Reconstruction Project Construction Update Keith.
STRONG NEIGHBORHOOD INITIATIVE Public Works Department January 30, 2007 Agenda item 8.01.
Public Information Meeting St. George Road - Oak Hill Road Intersection Reconstruction Project.
County Road 19(Manning Road) & County Road 22 Improvements Environmental Study/ Preliminary Design Report November 2008.
Improvements to Stockton Street
2nd Street Drainage and Paving Improvements
Agenda Updates to Driveway and Sidewalk specifications and permits
The Gainesville Area Chamber Infrastructure Investment Initiative
Four Winds Condominium Association August 2, 2017
Pedestrian Safety & Mobility Study
S.R. 30A / U.S. 98 / Panama City Beach Parkway
June 5, 2017.
General Road Construction Information
2017 Reconstruction of Northfield Street
District 3 Complete Streets Projects
WELCOME State Road 50 (Cheney Highway) Overview and Methodology
DICKINSON AVENUE RECONSTRUCTION
PROJECT LOCATION Project begins at Garden Lane (East of I-4)
BICYCLE AND PEDESTRIAN MASTER PLAN FINAL PRESENTATION
The Oakton Condominium Association September 12, 2017
Public Information Meeting NW 100th Street Reconstruction Project
IA 122 RECONSTRUCTION PRE-BID MEETING
General Tab Project, Cost Schedule, and Work Limits Roadway Character
Transportation Projects
SW Gage Blvd - Street Repair Project
Maricopa County Transportation Improvement Program
SE 12th Street Roadway Improvements February 8, 2005.
Traffic Study Presented by Keith Wenners, pe, ptoe
State Aid Standards Development
General Tab Project, Cost Schedule, and Work Limits Roadway Character
PUBLIC HEARING S.R. 30 (U.S. 98 Business/West Garden Street)
Meadow Lane – Brandon Road Improvements Welcome!
Walker Street Reconstruction Project 25% Design Public Hearing
Harbour Island Force Main Replacement
PROJECT 3004(18) NORTH CARPENTER ROAD MAJOR RECONSTRUCTION
St. Andrews Agenda Item 11.A & 11.B
Monterey County Project Report for Measure X Expenditures
Project Location. Cambridge/Arlington Intersection Reconstruction Public Information Meeting June 16, 2015.
STATE ROAD 61/369 CRAWFORDVILLE HIGHWAY
Project Location: 35th Ave HSIP8
Presentation transcript:

PROJECT INFORMATION SESSION Small Business Enterprise 2/5/2009 PROJECT INFORMATION SESSION Small Business Enterprise SR 44 from Lake/Sumter County Line to SR 44/CR 468 Project 427230-1 December 13, 2010 Derek Dixon Consultant Project Management

PROJECT LOCATION End Project Begin Project

PROJECT LIMITS LIMITS: SR 44 - Begin MP 0.000 (Lake/Sumter County Line). CR 468 - End MP 2.468 MITS (Pavement Change East of CR 468/SR44).

SPECIFIC PROJECT DETAILS The Pavement Design Will be Done by The Department Restripe the Urban Section to Accommodate a 4.0’ Bicycle Lane

PROJECT INFORMATION Old Construction Projects Numbers – 238040-1 and 238241-1 Level of Community Awareness plan : 1 Stormwater Management District : SJRWMD Number if Existing Utilities : Eight – AT&T - Distribution & Transmission Bright House Networks, LLC City of Leesburg – Electric, Gas and Water Comcast Cable Progress Energy Century Link Posted and Design Speed : SR 44 – Posted 55 MPH (MP 0.000 to MP 2.220) Posted 45 MPH (MP 2.220 to MP 2.365) Design Speed (From plans for 238241-1) SR 44 – Design 65 MPH (MP 0.000 to MP 1.600) Design 45 MPH (MP 1.600 to MP 2.365)

IMPORTANT DATES Advertisement – January 11th, 2011 Letters of Interest – Response Deadline January 21st, 2011 Short-list – February 7th, 2011 Final Selection – March 31st, 2011 PE Begin – May 2011 Note: These dates are preliminary and subject to change.

CD CONTENTS Technical Scope Straight Line Diagram Right-of-Way Maps Construction Plans Project Information Session Presentation

PROJECT SCOPE Mill and Repave Existing Asphalt and Paved Shoulders Eastbound and Westbound Lanes 2 Roadway Typical Sections Reconstruct 17 ramps and a pedestrian island at SR 44/CR 468 intersection Install Approximately 3 Detectable Warning Devices on Existing Curb Ramps Minor Sidewalk Additions

QUESTIONS?