UYC Club House Project Members Update Meeting

Slides:



Advertisements
Similar presentations
Project Cycle Management
Advertisements

Fleurieu Regional Aquatic Centre Project summary October 2013 council meetings.
Proposal on improvement of the capacity building programme of The association of village municipalities of the Kyrgyz Republic.
Annual General Meeting 21 st January Agenda Chairman’s report for Financial report for 2014 and budget for Strategic Plan. Election.
The quantification test results indicate that St. Stephen produces an average of 31 ft 3 or 96lb. of target recoverable waste per week. Most of the waste.
Facilities Design Principles Chapter 28. Planning Pitfalls Failure to provide accommodations for handicapped Failure to provide adequate storage Failure.
Remsenburg – Speonk Union Free School District Elementary School Bond Planning Presentation October 12, 2010 BBS Architects and Engineers and Triton Construction.
ST JAMES THE GREAT, PETTS WOOD Forum Presentation 16 th September 2010 Grayston Alan Durtnell.
Building Project Update January Contents Recap Options Order of Cost Where do we go from here?
A Christian community with so much to offer…. We are aiming to improve our premises to enhance our mission.
The Catholic Community of St. Thomas More New Building Committee.
Property Tax Hearing August 12, Purpose Of Public Hearing Meet Requirements of State Law Explain the City’s reasoning for the proposed tax increase.
Waste Select Committee 6 June Introduction 1 Waste Select Committee Report - Recycling In Norwich: 25 th January Recommendations endorsed.
SUPPORTING NEW FOOD CO-OPS CORNERSTONES. ACCOMPLISHMENTS & PROGRESS SINCE 2005  CHALLENGES & BARRIERS LESSONS LEARNED.
Hunslet Nelson CC 1 st Xl 2012 – CYCL Premier Division Gipsy Lane Beeston Leeds LS11 5TT © Hunslet Nelson Cricket Club 2011.
Proposed SAHA Fiscal Year Consolidated Budget.
New Community Athletic Stadium Opening at Heslington West September 2014.
Annual Meeting February 04, HOA Board of Directors  Chairman – Cliff Howard  President – Ilze Robinson  Director – Tom Ball (outgoing member)
Ontario Region First Nation Water & Wastewater Action Plan Presentation on March 9, 2010 Niagara Falls, Ontario INAC Ontario Region.
FUNDS FOR CHANGE GRANT PROGRAM LESSONS LEARNED. To enhance the long-term growth and sustainability of NDBN member diaper banks. Provide financial assistance.
Visit to Queen Margaret University College Edinburgh August 2006.
Sally Lyon and Staff August 26, OPERATING REVENUES AND OTHER INCOME BUDGET FY 2016.
UYC Development Plan Sept Status review since 2012 Weathered the recession Remained profitable Bought Birkett field, replaced dinghy slip, drained.
UYC Organisation Structure Member Consultation 25 th May 2014.
UYC Organisation structure Member Consultation April 2014.
CAPITAL FACILITIES PROGRAM UPDATE BOARD OF EDUCATION FEBRUARY 8, 2016 FACILITIES SERVE EDUCATION.
WELCOME RESIDENTS! HHA ANNUAL PLAN CAPITAL IMPROVEMENTS, ACOP, HCV ADMIN PLAN, PERMANENT SUPPORTIVE HOUSING ADMIN PLAN REVISION TO 5-YEAR CAPITAL FUNDS.
1 Briefing for Schools and Education Department Lisa Bibby Director Schools and Education 16/ 19 November 2012.
Aldeburgh Golf Club Club House Proposals 1 September 2015.
Concept Design Community Center Proposed Spaces New Construction63,000 SF – Gym Spaces13,500 SF – Fitness Center 9,000 SF – Walking Track 4,000 SF – Multipurpose.
Item 3 South East Plan and recent policy statements…
Hayesbrook Community Pavilion. Aims St Stephen’s Church offers a variety of activities open to the whole community including Youth Clubs (Young & Old.
Multnomah County Central Courthouse Site Due Diligence Update April 9, 2015 JD Deschamps Mike Pullen Mike Day.
Budget 2005/2006 Focusing on Our Priorities BUDGET CONSULTATION Social Care and Health Scrutiny Committee 25 th January 2005.
Enhancing the Training Offering Purpose: Recruit More Members.
Members Meeting Club House Strategy
PRIORITISATION FOR SCHOOL SPORT SUPPORT
Members Meeting Club House Strategy
Mike Ellis Executive Director – Property + Projects
Local Control Accountability Plan LCAP
2016 Highlights and 2017 Goals and Initiatives
E-Learning Advisory Group Workshop
Member Consultation January 2017
Scottish Capital Investment Manual
Teacher Evaluation Timeline
Southborough Hub - Update Southborough Town Council 31 March 2016
Robinson Park Recreation Center Renovation
Project Cycle Management
Added Value Products – Friend or Foe
Members Meeting Club House Strategy
UYC Finance Report Oct 2013 Peter Lewis.
Draft Indoor Recreation Facilities Master Plan
education Department of Education REPUBLIC OF SOUTH AFRICA
Place Standard Irene Beautyman Planning for Place Programme Manager
St. Mary’s Church Expansion Project
Welcome Gary Kitching, Deputy Chair of Framlingham Town Council
Meeting Planners Association
Members Survey Results
Valley & Third Streets Redevelopment
PSAA – Update for Society of District Council Treasurers
How to Build a Great Team
End of Year Performance Review Meetings and objective setting for 2018/19 This briefing pack is designed to be used by line managers to brief their teams.
June 26, 2018 The Large Projects are an investment into the future of your community. This investment will result in economic growth, improved quality.
Proposed New Saint Michael Church
Use of National Strategies for the Development of Statistics
WEBINAR 1 - MEMBER CONSULTATION FORUM
Back Ground Information
Use of External Consultants
Expansion Project Saturday, February 9, 2019
RIBA Plan Tom Robinson sir david Swindells Vii
Presentation transcript:

UYC Club House Project Members Update Meeting Webinar will start at 7pm

Update July 2017 Brief Recap Current status and progress made Funding Site plan Accommodation Building Cost (over budget!) Funding Next steps Timetable

Concept Jan 2017- Recap Insurable club house Meet needs of current and future members Considered 7 options Preferred option Between car park mound and lake shore 15% larger to allow for increased size of changing rooms, office and sailing school store Project budget £1200k Funding feasible with increased loan and increase in membership fees Jetties and Moorings would progress as separate timeline ( decided in April)

Members Survey 2016 Members Priorities Funding Larger changing rooms Covered Veranda Soft Dry Seating Area More Showers Funding Members loans or gifts >£80k indicated

EGM 21st January 2017 Proposal Seek member agreement for move to next phase required for new build Prepare and make planning application Obtain Competitive quotations from potential contractors and for professional fees Update refinancing requirements and confirm available bank loan offer Secure members’ new loan commitments Confirm targets and strategy for other fund raising Expenditure £56000 Further consultation stage with final design; Compromise but focussed on key facilities and priorities. Further EGM to approve: Financial Plan including construction cost, fees & subscription rises and new loan commitment Construction timetable with implications for site use and programme

Who Chris Granger, Paul Crosby & Mary Bird at Crosby Granger Architects Stuart Mair at Tweddel and Slater Structural Engineers Brian Edgar at Donleys Quanitity Surveyors Alison Moffatt at Eden Environment Landscape Consultant Alistair Hearn at Treescape Consultancy Rigby Jerram Water Ecologist. Members: Building Group Peter Lewis Pam Brooks David Lyons Paul Lewis David Clarke Carl Hallam Sheila Robinson (+John) Members : Funding Group Rick Boyce Rob Watson David Hesselberth Ian Priestley Paul O Hara Dennis Goodies Neil Thompson Pauline Thompson Paula Breen (New)

New Build Stakeholders = Complex Project Members needs Regulatory Finance Insurability Environment agency Planning Policy Local Opinion

Planners 3 meetings Very supportive Quality of design over materials ‘Nothing seen so far frightens him’ Landscaping Important, Breaking up the mass of boat parking with trees Extending into Birkett field but remainder must be clearly agriculture.

Plan Size Comparison Key features Flexible social meeting space Large changing rooms Dinghy park entrance to changing Covered veranda Canteen serving flow. High lake visibility Members kitchen Sq.m. Existing Proposed Social 117 136 Male facilities 43 66 Female facilities 33 72 office 13 Disabled/ family shower 3.6 6 Sailing school store 32

Design Guide Pictures

Design Guide

Material Pallet

Build up from plan.

Social space open vaulted extending out to veranda Material pallet

Race Box

Includes sewage treatment, racebox. Cost update £ January 17 £ update July17 Build cost 809,000 1,220,000 Includes sewage treatment, racebox. Additional costs; upgrade sewage treatment, demolition of existing club, refurb racebox, 65,000 10,000 Fees 105,000 147,600 12% Non recoverable VAT 127,000 179,088 Contingency 94,000 124,535 TOTAL 1,200,000 1,681,223 40%

Cost Reduction Options Shape = Size Size. Veranda Race box - Delay External training area – Delay / self build Size of changing areas Dinghy park entrance to changing School kit store. Members kitchen.

Room Name existing proposed % Bar Lounge 28.9 20 4 Bar Serving inc 10 Bar Cellar 3.4 5 47 Kitchen 27.3 34 25 Bin Store external (External) Plant 3.9 3.6 -8 Kit Store 32 new WC 6 67 Members' Kitchen inside Lobby 8.1 295 Office/First Aid 13 Male Showers/Toilets 12 Male Changing 43.3 39 52 Male Toilets 15 Female Changing 33.4 36.7 115 Female Showers Female Toilets Function 87.7 75 21 flexi space Training/Meeting 30.6 31 Store 2.8 Covered entrance 2.5 safety boat store 15.1 Race Box 18 TOTAL 316.3 428 35 concept was 412. 283 410 45 exc race box and safety boat store

Funding update Cost of bank loan Appointed ‘Gifted Philanthropy’ Has been up and down Model Jan 4.06% Recent Jun 3.7% LESS Appointed ‘Gifted Philanthropy’ Professional fund raiser Propose Fund raising strategy. 25/30 Interviews to assess potential sources and scale, not asking for money (initially) Members Foundations Philanthropists Sponsorship Report back September.

Revised timeline.

Feedback Members Survey Plans will be on view Options for cost reduction Design Plans will be on view Club house Website

Next steps Adapt scheme to align with Members Survey feedback. Work with Professional team to engineer back into budget. Evaluate Insurance Companies Suggestions cost £30k. Local consultation with influencers Parish council Local businesses Local residents Friends of lake district why?