Glen White, SLAC Jan th ATF2 Project Meeting, KEK

Slides:



Advertisements
Similar presentations
P.N. Burrows ATF2 Project Meeting, KEK, 14/12/091 Feedback On Nanosecond Timescales Philip Burrows Glenn Christian Hamid Dabiri Khah Javier Resta Lopez.
Advertisements

Test of LLRF at SPARC Marco Bellaveglia INFN – LNF Reporting for:
6 June 2002UK/HCAL common issues1 Paul Dauncey Imperial College Outline: UK commitments Trigger issues DAQ issues Readout electronics issues Many more.
4 Dec 2001First ideas for readout/DAQ1 Paul Dauncey Imperial College Contributions from all of UK: result of brainstorming meeting in Birmingham on 13.
Feed forward orbit corrections for the CLIC RTML R. Apsimon, A. Latina.
-brief report of October runs and some inputs for the Nov/Dec planning – Nobuhiro Terunuma, KEK, ATF ATF session on LCWS13, Tokyo Univ., Nov. 13, 2013.
Progress towards nanometre-level beam stabilisation at ATF2 N. Blaskovic, D. R. Bett, P. N. Burrows, G. B. Christian, C. Perry John Adams Institute, University.
ATF2 Status and Plan K. Kubo ATF2, Final Focus Test for LC Achievement of 37 nm beam size (Goal 1) – Demonstration of a compact final focus.
ATF2 Q-BPM System 19 Dec Fifth ATF2 Project Meeting J. May, D. McCormick, T. Smith (SLAC) S. Boogert (RH) B. Meller (Cornell) Y. Honda (KEK)
1 Feedback On Nanosecond Timescales (FONT): Philip Burrows Neven Blaskovic, Douglas Bett*, Talitha Bromwich, Glenn Christian, Michael Davis, Colin Perry.
FONT IP intra-train feedback prototype status
Optical Anchor / Interferometer Status: June, 2004 Josef Frisch.
Accelerator R&D on LC - Activities of ATF & STF - 1. Introduction 2. ATF 3. STF 4. Summary Seiya Yamaguchi, KEK The US/Japan Collaboration in High Energy.
DLS Digital Controller Tony Dobbing Head of Power Supplies Group.
Status of QBPM Electronics and Magnet Movers as of June 3 rd 2008 D. McCormick, J Nelson, G White SLAC S Boogert Royal Holloway Y. Honda, Y.Inoue KEK.
Feedback on Nanosecond Timescales (FONT) - Review of Feedback Prototype Tests at ATF(KEK) Glenn Christian John Adams Institute, Oxford for FONT collaboration.
Font 4 Review Digital Feedback System BPM Analogue Processor Digital Processor Feather Kicker Power Amplifier Pick up StriplinesKicker StriplinesBeam.
1 FONT Results 2010 Philip Burrows Robert Apsimon, Doug Bett, Glenn Christian Michael Davis, Colin Perry, Javier Resta Lopez John Adams Institute Oxford.
NLC Intra-Pulse Fast Feedback Simon Jolly Oxford University NLC Beam Delivery Meeting July 2001.
Feed forward orbit corrections for the CLIC RTML R. Apsimon, A. Latina.
Feedback On Nanosecond Timescales (FONT): Robert Apsimon, Philip Burrows, Neven Blaskovic, Douglas Bett, Glenn Christian, Michael Davis, Davide Gamba,
Development of a Low-latency, High-precision, Intra-train Beam Feedback System Based on Cavity Beam Position Monitors N. Blaskovic Kraljevic, D. R. Bett,
1 ATF2 Q BPM electronics Specification (Y. Honda, ) Design System –Hardware layout –Software –Calibration Testing Production schedule ATF2 electronics.
1 FONT R&D status Philip Burrows Douglas Bett, Neven Blaskovic, Glenn Christian, Michael Davis, Young Im Kim, Colin Perry John Adams Institute Oxford University.
Philip Burrows ALCPG11, Eugene 21/03/111 Performance of FONT at ATF2 Philip Burrows John Adams Institute Oxford University.
ATF2 Software tasks: - EXT Bunch-Bunch FB/FF - IP Bunch-Bunch FB - FB Integration Status Javier Resta-Lopez JAI, Oxford University FONT meeting 1th August.
ATF2 Commissioning Toshiyuki Okugi 2008 / 7 /9 ATF2 beam commissioning meeting, KEK.
Philip Burrows ATF2 project meeting 14/1/111 Plans for ATF2 IP Feedback Philip Burrows, Colin Perry John Adams Institute Oxford University.
1 Feedback On Nanosecond Timescales (FONT): Philip Burrows Neven Blaskovic, Douglas Bett*, Talitha Bromwich, Glenn Christian, Michael Davis, Colin Perry.
Feedback On Nanosecond Timescales (FONT) Philip Burrows Neven Blaskovic, Douglas Bett*, Talitha Bromwich, Glenn Christian, Michael Davis**, Colin Perry.
IPBPM issues (Limitation of resolution) Siwon Jang (KNU)
1 Feedback On Nanosecond Timescales (FONT): Philip Burrows Neven Blaskovic, Douglas Bett, Glenn Christian, Michael Davis, Young Im Kim, Colin Perry John.
ATF2 Tuning Summary Nov & Dec 2010 Glen White, SLAC 11 th ATF2 Project Meeting, SLAC Jan
ATF2 beam operation status Toshiyuki OKUGI, KEK The 9 th TB&SGC meeting KEK, 3-gokan Seminar Hall 2009/ 12/ 16.
N. BlaskovicFONT Meeting1 ATF November 2013 shift plan N. Blaskovic.
Summary of Tuning, Corrections, and Commissioning ( Short summary of ATF2 meeting at SLAC in March 2007 ) and Hardware Issues for beam Tuning Toshiyuki.
Philip Burrows ATF2 project meeting 1/07/101 Plans for ATF2 IP Feedback Philip Burrows, Colin Perry John Adams Institute Oxford University.
NumberMikey Davis02 November 2012 Roundup of ATF Trip.
Cavity BPM: Multi-bunch analysis N Joshi, S Boogert, A Lyapin, F. Cullinan, et al. Royal Holloway University of London,
1 Feedback On Nanosecond Timescales (FONT): Philip Burrows Neven Blaskovic, Douglas Bett, Glenn Christian, Michael Davis, Young Im Kim, Colin Perry John.
Low-Q IP BPM Y. I. Kim *, A. Heo, E-S. Kim (KNU) S. T. Boogert (JAI) D. M. McCormick, J. May, J. Nelson, T. Smith, G. R. White (SLAC) Y. Honda, N. Terunuma,
1 IP FB tests at ATF2 Philip Burrows Douglas Bett, Neven Blaskovic, Glenn Christian, Michael Davis, Young Im Kim, Colin Perry John Adams Institute Oxford.
IoP HEPP/APP annual meeting 2010 Feedback on Nanosecond Timescales: maintaining luminosity at future linear colliders Ben Constance John Adams Institute,
1 ATF2 Q-BPM Magnet Movers & 1 st Pulse Calibration Progress from May 7-11 J. May, D. McCormick, T.Smith (SLAC) S. Boogert (RH)
ATF2 Software tasks: - EXT Bunch-Bunch FB - IP Bunch-Bunch FB - FB Integration Status and plans Javier Resta-Lopez JAI, Oxford University ATF2 commissioning.
FONT4 Status Report Glenn Christian John Adams Institute, Oxford for FONT collaboration.
Current Status of QBPM Electronics and Magnet Movers D. McCormick, J Nelson, G White SLAC S Boogert Royal Holloway Y. Honda, Y.Inoue KEK.
1 FONT IP FB Philip Burrows Robert Apsimon, Doug Bett, Neven Blaskovic, Glenn Christian, Michael Davis, Colin Perry John Adams Institute Oxford University.
Superfast BPM Processor Scheme Stephen Molloy, QMUL Nano-Project Mini-Workshop at ATF.
Roundup of Week at ATF Mikey Davis 19 April /26.
Electronic workshop for Si-W ECAL
Dither Luminosity feedback versus Fast IP feedback
Baby-Mind SiPM Front End Electronics
In collaboration with P. N. Burrows, A. Latina and D. Schulte
NanoBPM Progress January 12, 2005 Steve Smith.
Alternative FEE electronics for FIT.
P. Forck, P. Kowina, M. Schwickert, R. Singh
ATF2 Mover Software 15 December 2008
March Trip Plan Mikey Davis 01 March /7.
Electronics requirements for special diagnostics for the XFEL
ATF2 Instrumentation Stewart T. Boogert
Progress towards nanometre beam stabilisation at ATF2
Intra-Pulse Beam-Beam Scans at the NLC IP
LLRF Control System Outline Scope Requirements Design Considerations
SLAC - End Station A ILC testrun – April '06 ...
Towards a ground motion orbit feed-forward at ATF2
Feed forward orbit corrections for the CLIC RTML
Status of TTF HOM Project Aug 9, 2005
Report on ATF2 Third Project Meeting ATF2 Magnet Movers ATF2 Q-BPM Electronics Is SLAC ILC Instrumentation Group a good name?
Breakout Session SC3 – Undulator
Presentation transcript:

Glen White, SLAC Jan 11 2011 12th ATF2 Project Meeting, KEK Discussion of IPBPM Goals, Status and a Proposal of One Way to Proceed with R&D Glen White, SLAC Jan 11 2011 12th ATF2 Project Meeting, KEK

Overview Required performance for IPBPM system R&D requirements Longer-term, plans to replace IP region with new high-stability and high-precision mover-mounted BPM system What to do in the intermediate timescale? Many R&D items still required that can be addressed with existing system IF can find manpower Some ideas for R&D efforts with existing system Proposal of specific DSP implementation for IPBSM system IPBPM system very important for Goal 1 and Goal 2 of ATF2. Need more effort in this area.

Required Performance for IPBPM System For goal 1 need <10nm RMS vertical jitter at IP for IPBSM max resolution Needs better than 10nm resolution on BPMs Currently shown <5nm with Y.Kim/Honda results First need to measure jitter at IP waist and see how jitter reduces with beamsize- hopefully scales with sigma For goal 2 need <2nm resolution Where to measure? Easiest to move IP waist directly to best performing BPM This best option for goal 2 For goal 1 need IP measurement during IPBSM measurements, need to project IP position to IPBSM waist Increases demands on BPM resolution and stability (gain and offset)

R&D Items Important separate streams of R&D efforts required to meet goals Continued work improving resolution to <2nm Upstream test area For best chances, better pursue both new “low-Q” and continue on from Y.Kim/Honda study? Is there effort available for this? Prove and understand long term stability of high-resolution study and maintainability for non-expert system Need to prove a system that is always available and provides max resolution on multi-minute timescales during IPBSM scans i.e. move from “test” system to “implemented” non-expert system. Non-trivial. Develop “real-time” processing system for use in IP feedback Having stable, low-resolution with offline system (user cuts, data massaging etc by human) very different from automated, fast (~100ns) system which delivers analog signal which is itself high-resolution and stable Need to start putting together a system ASAP to begin R&D for cavity-based IP beam position processor

High-Availability / High-Resolution / Non-Expert Controllable IPBPM Homodyne/heterodyne Need to understand in detail relative performance of both approaches Heterodyne has considerable advantages if it gives good enough performance Fits well into current very well developed and tested cavity BPM processing/analysis/calibration suite of software developed by S. Boogert and team. Homodyne could also be developed into automated system but would need considerable low-level electronics and controls and high-level software work Easiest possible route maybe to develop digital-based heterodyne processing based around existing tools implemented in FPGA logic Leverage all existing high-level tools Tuning / calibration / analysis done using existing high-level tools, FPGA just implements the processing algorithm and provides for data transport to/from FPGA to high-level software (e.g. scale factors, IQ rotation angle, raw waveform data…). FPGA then supplies DAC output for feedback signal for IP FONT system

FPGA IPBPM Processing R&D goals Provision of DSP system ADC + FPGA + DAC + data transfer system Develop processing algorithm in FPGA logic and simulate performance with existing data FPGA implementation of existing heterodyne DDC algorithms plus tuning and calibration implementation Possibility for signal subtraction for overlapping waveforms Math for IP waist position extrapolation Feedback signal formation and output through DAC Implement data transfer hooks and protocols for integration into existing high-level software Implement at ATF2 IPBPM and test performance versus existing offline analysis Optimise latency Assume initial operations for 2-bunch feedback with maximum time between 2 bunches (~300ns) There are tradeoffs between accuracy of position reconstruction and latency in FPGA processing, need to understand these well

FPGA-based IPBPM DSP Solution cPCI “VHS ADC/DAC” with Virtex 4 FPGA from Lyrtech 14-bit 100MHz ADC + DAC (8 channels each) “Model-based toolbox” Simulink interface for FPGA programming and for programming of VHS board Very easy to use, no expert knowledge Currently shipping to SLAC- arrive this month Includes engineering effort from Lyrtech to deliver “low-latency” version of their board.

Architecture High-level Cavity BPM Software BPM ATF-LOCAL Subnet + EPICS High-level Cavity BPM Software VHS-ADC/DAC + FPGA BPM Control Host Running Matlab + Simulink Feedback Electronics

Matlab/Simulink Programming of VHS & FPGA

Matlab/Simulink Programming of VHS & FPGA

Latency Zeroth-order latency of system 100ns Processing blocks will add to this latency Need to investigate latency/accuracy trade-offs Max total latency given by max 2 bunch separation (~300ns) Cable delays + beam propagation delays + analog electronics delay + DSP delay + feedback electronics delay If required, it is possible to work with Lyrtech on latency to further reduce.

IPBPM @ IP Next Steps Current IPBPM processing using SLAC c-band cavity downmix electronics + standard high-level software Resolution ~100nm, min expected ~20nm OK for orbit establishment etc, but not good enough for goals Next step could be to move electronics developed and tested by Y.Kim & Honda-san with demonstrated <5nm resolution to IP region? Also need to move ref cavity’s back to IP region? Then implement online processing system and start with R&D towards high-resolution, high-availability system. Can quickly assemble zeroth-order test to understand performance/latency baseline Continuing, need well-developed R&D plan and dedicated manpower to move R&D forwards Very good PhD student project for example SLAC can provide current system as presented and provide assistance but no resources to fully develop system alone.