Maunakea Operations and Engineering Workshop

Slides:



Advertisements
Similar presentations
© ABB Oy 1 DOCPLCMODEL01 ABB Drives product lifecycle management model (PLM) June 2004.
Advertisements

TCS3 Conceptual Design Review 1 Aug 21, 2003 TCS3 Project Replacement of the Telescope Control System for the IRTF Conceptual Design Review Aug 2003.
REFURBISHMENT OF SMALL HYDRO PLANTS Innovative small hydro technologies Waterpower XIII July 29, 2003 Hugo Carle, Eng. General Manager.
CSC 450/550 Part 3: The Medium Access Control Sublayer More Contents on the Engineering Side of Ethernet.
Remote Activation of Appliances Using USB Interfaces Vanessa Cox Chris Hydak Kaori Wada.
ENGIN112 L38: Programmable Logic December 5, 2003 ENGIN 112 Intro to Electrical and Computer Engineering Lecture 38 Programmable Logic.
Hamid Shoaee LCLS FAC Controls June 17, LCLS Control System Personnel Linac & BC2 Controls progress LTU, Dump Controls.
Sector 13 Canted Undulator Upgrade Hutch Modification Requirements ( )
Target Controller Electronics Upgrade Status P. Smith J. Leaver.
Local Area Networks Part II. 2 Introduction Many times it is necessary to connect a local area network to another local area network or to a wide area.
CS 151 Digital Systems Design Lecture 38 Programmable Logic.
Programmable Logic Controller
Accelerator Complex Controls Renovation, LHC Excluded Purpose and Scope M.Vanden Eynden on behalf of the AB/CO Group.
Title goes here in Frutiger Bold, 25 points Subhead if any goes here in Frutiger Roman, 20 points Bullet copy in Frutiger Bold, 18 points Product Opportunities.
Remote manipulations / diagnostics in radioactive areas and handling of radioactive material Workshop, Geneva, Switzerland 6 th May 2013 THE REPLACEMENT.
A+ Guide to Managing and Maintaining Your PC Fifth Edition Chapter 5 The Motherboard.
Exterior Gateway Protocol Border Gateway Protocol (BGP) Interior Gateway Protocol Routing Information Protocol (RIP) Enhanced Interior Gateway Protocol.
© ABB Oy 1 DOCPLCMODEL03 ABB ULMA / Web Imaging Systems lifecycle management model (LCM) March 2004.
Untethered Walk around your classroom with your Laptop, with no cables connected!
Magnet Controls Group LCLS Magnet Controls August 16, Status of the LCLS Magnet PS Controls Needed for First Injection.
IPv6 Network Assessor 111 © 2005 Cisco Systems, Inc. All rights reserved. Susan Shareshian Solutions Manager, Cisco Systems, Inc.
ITER – Interlocks Luis Fernandez December 2014 Central Interlock System CIS v0.
VirtualBox What you need to know to build a Virtual Machine.
1/28/2010 Network Plus Unit 4 WAP Configuration WAP Configuration In this section we will discuss basic Wireless Access configuration using a Linksys.
KNX – the benefits. Schneider Electric 2 - IS&C – Aug Content ●Basic arguments ●Added value for: ●Investors ●Wholesalers ●Installers and System.
Virtual commissioning at vcc
New 5000 Documents 14 May 2001 New 5000 Documents 14 May 2001 Defense Systems Management College Acquisition Policy Department.
CCNA 2 Week 1 Routers and WANs. Copyright © 2005 University of Bolton Welcome Back! CCNA 2 deals with routed networks You will learn how to configure.
1. 2 Router is a device which makes communication between two or more networks present in different geographical locations. Routers are data forwarding.
Using JAS3 for LCD Analysis Tony Johnson 20 th May 2003.
Life cycle services for automation products
State Librarian’s Quarterly Webcast Susan Hildreth August 3, 2005 Noon – 1pm.
Comment on the LHCb upgrade cooling plan Paolo Petagna Meeting on CO 2 Cooling CERN 11 March 2015.
Managed by UT-Battelle for the Department of Energy SCL Vacuum Control System Upgrade Derrick Williams
Bill SahrEVLA Advisory Committee Meeting September 8-9, EVLA Monitor & Control.
Router is a device which provides communication possible between two or more different networks. To allow communication between two or more different.
MagIC Upgrade for High-Speed Photometry Jim Elliot, MIT Magellan SAC
Integrating Advantech PCI I/O cards into EPICS. Outline ANTARES computer control and data acquisition systems architecture STAR computer control and data.
 SOFTCON SYSTEMS PVT. LTD. (SSPL) offers unique, creative and practical automation solutions in the field of Process & Power on an LSTK / EPC basis with.
Lesson 1 PLC BASICS. PLC Definition  Programmable Logic Controllers are industrial computers that control machine and other applications.  PLC have.
EMBEDDED SYSTEM An embedded system is a special-purpose computer system and a combination of software and hardware designed to perform specific task. It.
Industrial communication networks
Maunakea Operations and Engineering Workshop
Uniper Energy Services
Cryogenic Plant Electrical and Controls
Chapter Objectives In this chapter, you will learn:
NAFC Marine Centre Shetland School of Nautical Studies
Facility for Rare Isotope Beam (FRIB) PLC Control Systems Introduction
Southeastern Louisiana University
Welcome! Thank you for joining us. We’ll get started in a few minutes.
Introduction to Computers
HAPS Controls Glen White ATF2 Software Review Workshop, LAL, June 2008
Blanco mirror lift upgrade ACTR #480
SC1R Cold Box PDR Controls
Basic Electrical Circuits
router component and memory? How its work Console access
DEBROS: A UNIX-like OS for 8-bit microcontrollers
Documenting Your PLC System
PLC Hardware Components.
Operations Perspective
ACOE347 – Data Acquisition and Automation Systems
February 2007 Note: Source:.
The bios.
DOE Review 11 May 2005 Stephen A. Lewis
FPGA Vinyl to Digital Converter (VDC)
Lessons Learned - SNS Linac PPS Phased Upgrade to Safety PLC
Basic Electrical Circuits
DOE Review 11 May 2005 Stephen A. Lewis
Presentation transcript:

Maunakea Operations and Engineering Workshop Domes & Shutters Keck 2 Dome Control PLC Upgrade Andrew Cooper W. M. keck Observatory Maunakea Operations and Engineering Workshop, 8 December 2016

No Manufacturer Support Programming software DOS based An Obsolete PLC As of 2014 the Keck 2 dome and shutters were controlled by an Allen Bradley PLC2 30 year old technology No Manufacturer Support Programming software DOS based Battery backed RAM (no Flash) Maunakea Operations and Engineering Workshop, 8 December 2016

An Obsolete PLC Maunakea Operations and Engineering Workshop, 8 December 2016

FY2016 Upgrade Project to a modern and supportable PLC Upgrade Path FY2016 Upgrade Project to a modern and supportable PLC Original Plan was an upgrade to a PLC5 Allen Bradley ControlLogix PLC? Plan must allow for continuous operation, no shut down for transition. Maunakea Operations and Engineering Workshop, 8 December 2016

Decision to transition to an AB ControlLogix Testing! Decision to transition to an AB ControlLogix Existing PLC chassis would be converted to a remote I/O arrangement maintaining all existing field wiring The PLC code was ported by hand with a few modifications Extensive testing with a full simulator Installed and tested in dome June 2015 Switched in as the operational system July 2015 Maunakea Operations and Engineering Workshop, 8 December 2016

Testing! Maunakea Operations and Engineering Workshop, 8 December 2016

Result Maunakea Operations and Engineering Workshop, 8 December 2016

Take-away It was possible to layer the modern controller atop the old hardware for a relatively painless upgrade path. There is now a clear path forward to phasing out the remainder of the older hardware on an as needed basis Maunakea Operations and Engineering Workshop, 8 December 2016