ALA580 EXPRESS LANE CORRIDOR PROJECT

Slides:



Advertisements
Similar presentations
2004 NERC, NPCC & New England Compliance Programs John Norden Manager, Operations Training, Documentation & Compliance August 31, 2003 RC Meeting.
Advertisements

General Update March Background As the region grows, increased travel demand on our aging Metro Highway System will continue to create additional.
PRESENTATION TO THE JOINT RULES COMMITTEE 15 MARCH 2012 ON THE PROGRESS ON IMPLEMENTATION OF THE INDEPENDENT ASSESSMENT PANEL ADOPTED RECOMMENDATIONS ADOPTED.
Interim Guidance on the Application of Travel and Land Use Forecasting in NEPA Statewide Travel Demand Modeling Committee October 14, 2010.
I-15 Managed Lanes: Building on Success And Lessons Learned I-15 Managed Lanes: Building on Success And Lessons Learned.
October 11, 2013 Status Report on La. 1 Toll Operations.
Toll Collection. One of the early widespread adopters of ITS Some of the most obvious benefits from ITS adoption.
1 Status Report on the Bus Systems in the National Capital Region Report of the Regional Bus Subcommittee to the Access for All Advisory Committee April.
Toll Violations BATA Oversight Committee January 2008.
Calais, ME-St. Stephen,NB Border Crossing Project A Case Study.
Presentation to the Subcommittee on Highways and Transit and the House Committee on Transportation and Infrastructure Peggy Catlin, Deputy Executive Director.
Joint I-680 Sunol JPA & I-580 Policy Committee Workshop – September 9, 2013 A Presentation for the I-580 Express Lane Policy Advisory Committee April 9,
B O N N E V I L L E P O W E R A D M I N I S T R A T I O N 1 Network Operating Committee (NOC) June 12 th, 2014.
Update on MOITS Strategic Plan Development Andrew J. Meese, AICP COG/TPB Staff MOITS Technical Subcommittee September 9, 2008 Item # 5.
National Road Pricing Conference June 4, 2010 Jennifer Tsien, PBS&J Angela Jacobs, Federal Highway Administration.
FASTRAK REGIONAL CUSTOMER SERVICE CENTER IBTTA ANNUAL CONFERENCE CLEVELAND, OHIO SEPTEMBER 2005.
Water Supply Planning Initiative State Water Commission November 22, 2004.
WSDOT SW Region, Vancouver, WA December 7, 2009 WSDOT SW Region, Vancouver, WA December 7, 2009 Tolling Study Committee.
Texas Regional Entity Update Sam Jones Interim CEO and President Board of Directors July 18, 2006.
Consistency Determination: City of Seaside Local Coastal Program FORA Board Meeting March 15, 2013 Agenda No: 8a.
Managed Lanes CE 550: Advanced Highway Design Damion Pregitzer.
Planning and Community Development Department Housing Element City Council February 03, 2014.
US DOT Planning for Operations Initiative – An Update AASHTO SCOH Annual Meeting June 14-17, 2009 Manchester, NH Rick Backlund – FHWA Office of Operations.
SPS policy – Information Presentation Presentation to ROS June 16, 2004.
Interstate 95 Corridor Improvement Program June 20, 2012.
A Strawman for Discussion by Dottie Stockstill & Greg Ramon Special ERCOT Board Meeting June 24, 2003.
Working Smart for the Customer’s Benefit Pam Hutton AASHTO SHRP2 Implementation Manager June 11, 2013.
I-394 MnPASS Express Lanes Project Update Guidestar Board Meeting September 7th, 2005.
DR issues in California discussed last year in March Historical DR in California: some background issues –Twenty years of programs/tariffs I/C and AC cycling.
Outage Scheduler Transition Plan Kenneth Ragsdale NATF.
Virginia Office of Public-Private Partnerships (VAP3) Adopted Public-Private Transportation Act (PPTA) enabling legislation in 1995 Public-Private Education.
Work Related to Senate Bill 2202 (effective January 1, 2001)
Public Hearing on the Red Light Camera Ordinance Presented by Dana Crosby, Assistant County Attorney July 13, 2010 Board of County Commissioners.
1 Briefing on Draft Congestion Management Process Elements for the 2007 CLRP Andrew J. Meese, AICP Melanie Wellman COG/TPB Staff TPB Technical Committee.
Airdrie Land Use Bylaw Presentation to City Council May 2, 2016.
1 Sahtu Land Use Planning Board Public Hearing on the Draft 3 Sahtu Land Use Plan May 2011 INAC Presentation.
PCE Program Debrief Jim Eggemeyer, Director, Office of Sustainability Shawn Marshall, LEAN Energy US March 24, 2016.
I-84 Baker Valley Variable Speed Limit System
I-66 OUTSIDE THE BELTWAY Shrevecrest HOA JUNE 21, Susan Shaw, P. E
2009 IOOS Regional Coordination Workshop Thursday, August 27
Four Winds Condominium Association August 2, 2017
PROPOSED MODIFICATIONS TO ARTICLE 10 (VEHICLES AND TRAFFIC) OF THE PASADENA MUNICIPAL CODE City Council January 23, 2017.
System Planning To Programming
ERCOT CRR Update to CMWG
Community Development November 2011
New Comprehensive Zoning By-law December 12, 2016.
FASTRAK REGIONAL CUSTOMER SERVICE CENTER IBTTA ANNUAL CONFERENCE
Board of Supervisors May 9, 2017
The Oakton Condominium Association September 12, 2017
ESB Networks AIP Programme
Money Bills Amendment Procedure and Related Matters Bill [B 75–2008]
John Martin Reservoir Master Plan Revision
focus areas – what we want to achieve…
CDOT North I-25 Express Lanes Update April 28, 2016
City-wide LED Street Light Conversion Program
San Mateo Countywide Transportation Plan update
Florida Transportation Commission FY 2009
North Carolina State Board of Education Update
Recommended Draft Policy ARIN : Post-IPv4-Free-Pool-Depletion Transfer Policy Staff Introduction.
11/30/2018 Approved Evaluator Training Provider on the Colorado State Model Evaluation System Application Process November 2016.
CBP Biennial Strategy Review System
Strategic Plan FY 2019 – FY 2023 Update
NERC Reliability Standards Development Plan
M. Scharfenstein - ES&H Coordinator 14 May 2009
NERC Reliability Standards Development Plan
Dana Williamson, Director Texas Health and Human Services Commission
4/23/2019 Approved Evaluator Training Provider on the State Model Evaluation System Application Process November 2015.
DESIGN-BUILD PROGRAM OVERVIEW
Department of Higher Education and Training
I Street Bridge Replacement Project
Presentation transcript:

ALA580 EXPRESS LANE CORRIDOR PROJECT Concept of Operations ALA580 EXPRESS LANE CORRIDOR PROJECT A Presentation for the I-580 Express Lane Policy Advisory Committee April 9, 2012 A Presentation at the Joint I-680 Sunol JPA & I-580 Policy Committee Workshop September 9, 2013 ALA580 HOV/HOT LANE CORRIDOR PROJECTS

Items Covered in July Access Configuration (Near Continuous) Pricing Strategy (Zone Tolling) System Design Toll Ordinance and Legislation Needs Public Education Strategies Agency Coordination Kanda Raj will cover this slide In the July 2013 I-580 Workshop, the staff covered overarching design and policy issues Quickly describe the first two items, and state that the Project construction is expected to commence, one year from now Design is on accelerated schedule and moving forward with the near continuous access and toll zoning schemes, to address past concerns from the Commissioners and to be consistent with the other planned regional exp ln projects We are trying to incorporate best practices and emerging technologies into our project System design involve several of these new and emerging technologies that requires industry expertise and coordination, which our System Manager, Kris Wuestefeld will cover in his presentation, in addition .. The system design will also have to address policy and legislation issues that our DD, Tess Lengyel will discuss later in the presentation We also discussed our coordinated public education strategies and Our efforts with the toll operators/agencies to implement Near continuous access Zone tolling Automated violation enforcement ,etc. 2

Focused Discussion Topics Enforcement Policy and Legislation Public Education Strategies Kanda Raj Today we are focusing on three major topics: 1) How to effectively employ enforcement utilizing newer technologies, 2) Associated policy adoption and legislation needs and 3) Our continued effort on public education strategies & collaboration In addition, 4) We will address questions raised in July Workshop Introduce Kris Wuestefeld (28 years in IT experience, including managing exp ln development in the country and other parts of the country/world. Also worked with us on the I-680 SB exp Ln development and system implementation) Turn over to Kris 3

Operations and Enforcement Vehicle Violation Enforcement and Monitoring Toll Violation Enforcement Occupancy Violation Enforcement System Operations Monitoring Kris <Cover detailed discussions in subsequent slides> Two types of enforcement, automated and manual Our main focus today is redg automated toll violation enforcement Will also discuss how we monitor the system -K. Raj 4

Operations and Enforcement Toll Violation Enforcement: Automated Violation Enforcement Use of switchable transponders License plate reading Lane level violation transactions Optical character recognition (OCR) Temporarily holding data at the Toll Data Center (TDC) Kris State that “we are designing” to accommodate “Switchable Transponders” Policy and legislation issues need to be ironed out, and Tess will cover them later in the presentation Quickly explain how the switchable transponders would work And cover License plate read Lane level violation transactions OCR Temporarily holding data at TDC OLD NOTES: Let us not mention about HOV registration (I deleted the bullet). It was discussed in July meeting, and I stated that neither the DMV nor MTC require the vehicles to register as HOV/SOV, therefore we have been left with the option to use switchable transponders. -K. Raj 5

Operations and Enforcement Toll Violation Enforcement: Typical Toll Gantry Kris Explain things mounted on the gantry related to violation enforcement & monitoring Gantries will be located in the median Orient the Commissioner where the dual lane EB exp lns are and where the single-lane WB EL is *Note: Enforcement lights shown on the pole itself is redundant. Likely will be removed, once the toll ordinance and legislation needs are met* 6 6

Operations and Enforcement Toll Violation Enforcement: Automated Violation Enforcement Kris to explain the picture <please note that our toll gantry will look different than this truss type, just in case the Commissioners inquired> 7

Operations and Enforcement Toll Violation Enforcement: Processing Automated Violation Enforcement Future violation processing Policy adoption by Alameda CTC Commission I-580 system interface with the Customer Service Center (CSC) Violation processing by CSC Invoice development and distribution Customer service support Dispute resolution and hearing processes Kris Toll ordinance adoption by Ala CTC Commission (per CVC 40250, Tess will cover) We are using BATA RCSC on the I-680 SB EL, In discussions with BATA for the following services on I-580, similar to what BATA has been providing on the toll bridges: Invoicing toll violation penalty and delinquent notices CSC support for the violation processing (OCR and other) Providing dispute resolution and hearing processes (again, Tess will cover later in detail) -K Raj 8

Operations and Enforcement Occupancy Violation Enforcement & System Monitoring Visual Occupancy Enforcement by CHP Occupancy detection technology not ready for commercial use On-board access to web-based data Verification through call center/CSC Closed Circuit Television Cameras CCTV coverage along entire corridor Dashboard/operation monitoring Kris, Manual occupancy violation will be implemented based on current CVC regulations for HOV violation. Toll ordinance that will be discussed later, only applies to automated toll violation enforcement Talk about Dashboard and its function in daily system/operations monitoring -K Raj 9

Policy and Legislation HOV Degradation MAP-21 Interoperability Toll ordinance Legislative needs Deputy Directive No. 43 Kris to present HOV Degradation 9see staff report write-up), and MAP-21 Interoperability Tess to present Toll ordinance to enact penalties, under purview of CVC 40250 Legislative clean-up to CVC Section 149.5(b), in order to mandate the HOV-ers carry transponders Caltrans DD-43 - K. Raj 10

Policy and Legislation HOV Degradation Maintain minimum speed 45 mph for 90% of the time, during commute hour, measured for consecutive 180 days Corrective action within 180 days from deemed degraded Dynamic pricing model ensure minimum speed Kris to explain What does HOV degradation mean Corrective action, as outlined in staff report (please read the staff report) 580 ETS design will ensure 45 mph OR turn lane into HOV Only mode -K. Raj 11

Policy and Legislation FHWA MAP-21 Interoperability Challenges to reaching this goal Vendor-driven ETC regional interoperability agreements Cost of installing multi-protocol antennas and readers Cost of replacing legacy transponders Toll system design will include upwards compatibility requirements Kris Please make sure to say that ACTC is working closely with CTOC and BATA to address the issue. Not a major issue, since we are designing the I-580 ETS with multi protocol read capabilities. If the commission inquired about our plans for I-680 SB EL Interoperability, please let them know that ... We do have a plan for the I-680 SB Exp Ln operations Already discussed the plan with our system integrator (SI) (which we did with Mike Cremer of ETCC) We will have to swap the toll readers with new readers, capable of reading multi-protocol May have to change the antennas depending on the type of national transponder chosen Will have to install new software at the reader and lane control levels, and make some modifications to the lane controllers to read the multi-protocol transponders and form the trips The rest of the operations will be the same (from lane controller to TDC and from TDC to RCSC-toll collection) The changes are relatively straight forward Funding for the changes will be included in the fiscal year operations, when we have to make the changes Timing could be when we implement the NB 680 Exp Ln.  If that project construction is delayed due to funding, we will implement the change through a CCO ahead of the deadline for national interoperability. -K. Raj 12

Current ETC Protocols in Use in US and Canada 9 5 4 1 Zone 1 (IAG) Zone 2 (6-C) Zone 3 (EGO+) Zone 4 (TDMA/Fusion) Zone 5 (Ego+) Zone 6 (Ego+) Zone 7 (6-C) Zone 8 (T-21) Zone 9 (6-c) 7 8 2 6 3

Policy and Legislation Toll Ordinance Required to enforce toll violation, per CVC 40250 Options under consideration: Alameda CTC ordinance adoption Region-wide implementation through delegation Tess to present, and may revise the bullets. Exploring few options, regional- & Alameda CTC - adopted toll ordinances. The Commission may have to adopt a toll ordinance, since BAIFA’s authority is for BAIFA lanes Ordinance will set policy issues in addition to include administrative steps for enacting such (local) toll ordinance Through a co-op, transfer the administrative steps, including toll dispute resolution and hearing processes to a processing agency Based on their Toll Bridge experience, BATA could be an ideal choice. -K. Raj 14

Policy and Legislation Legislation Needs Clean up CVC Section 149.5 (b) for Clarifying “unrestricted” HOV access to the HOV/Express Lane Requiring HOV users to carry toll transponders (switchable) Collaborating with other toll operators for joint action plan Tess to present. Also discuss coordination with LA Metro and timeline for the legislation. 15

Policy and Legislation Caltrans Deputy Directive Number 43 Caltrans policy document for managed lanes A draft was circulated in June 2013 Conveyed ACTC comments, requested clarification on Oversight costs Impact of contemplated new authority on existing express lanes, including AB 2032 authorized express lane How the toll revenue shall be shared Tess, can you present? This is a Caltrans policy document for managed lanes Draft was circulated in June and we expect a final version in October Will share it when it is finalized. Three major comments that we made on the draft, as listed above. 16

Public Education and Outreach Goals: Advance education on benefits Clear communication on lane access/use On-going education to support for use and understanding of new commuter choices Tess Educate 1) Project benefits, 2) changes ahead (continuous access, zone tolling, automated violation enforcement and switchable transponders) Update on next slide 17

Public Education and Outreach Update: Public education & marketing plan (strategies) development by December 2013 Request for proposal in early 2014 for plan implementation Plan implementation from summer 2014 through spring 2016 Tess/Heather to revise 18

Agency Coordination/Collaboration Coordinating with Regional/Local agencies, and Collaborating with National & State agencies K. Raj Trail blazing to implement new EL concepts in the Bay, new technological solution for addressing old traffic congestion We are collaborating with, national, state and other toll operators; incl Mn DOT, LA Metro, OCTA for implementing “continuous access” “zone-based tolling” “automated violation enforcement” and “switchable tag” 19

Responses to Commissioners’ Inquiries 388 vph 8,867 vph 629 vph 1,700 vph 7,796 vph 253 vph 7,931 vph 20

Discussion Topics – Oct. 2013 Meeting Operations Revenue Study Results HOV Eligibility (2+, 3+, etc.) Hours of Operation Policy: Tolling Polices and Business Rules Environmental Justice Public Education Strategies K Raj We covered Enforcement and associated ordinance and legislation issues today, and Next month we will cover ….. 21

Overall I-580 Corridor Schedule 2012 2013 2014 2015 2016 I-580 EB Auxiliary Lane I-580 WB HOV Projects Potential I-580 Express Change Order Work Public Education and Marketing I-580 Express Lane Projects I-580 System Integration Express Lanes Open K Raj 22

Questions / Answers All 23