NEHLRW Transportation Taskforce Meeting June 8, 2016 Orlando, FL

Slides:



Advertisements
Similar presentations
Adam H. Levin AHL Consulting May 14, BWR – Boiling Water Reactor DOE – Department of Energy DSC – Dry Storage Canister ISF – Interim Storage Facility.
Advertisements

Federal Budget Process Steve Kidd and Allison Boehm Budget and Program Analysis Staff April 2009.
Interim Storage of Used Nuclear Fuel February 2008.
The Yucca Mountain Repository for Nuclear Waste April 23, 2007 Edward F. Sproat III Director Office of Civilian Radioactive Waste Management U.S. Department.
1 GAO Study on Radioactive Waste Management Scenarios Ric Cheston US Government Accountability Office (GAO)
Safety  performance  cleanup  closure M E Environmental Management National Spent Nuclear Fuel Program Role in DOE’s Transformation Barb Beller, Project.
Near Term Planning for Storage and Transportation of Used Nuclear Fuel Jeff Williams Project Director Nuclear Fuels Storage and Transportation Planning.
NRC Decommissioning Activities for the San Onofre Nuclear Generating Station Bruce A. Watson, CHP Chief, Reactor Decommissioning Branch Division of Decommissioning,
Setting the Stage: Review of 2013 IEPR Nuclear Recommendations Danielle Osborn Mills Former Senior Nuclear Policy Advisor to the California Energy Commission.
Nuclear Power Discussion March 25, 2009 Joint meeting of the Legislative Energy Commission; the House Energy Finance & Policy Division; and the Senate.
John Wagner Oak Ridge National Laboratory Nuclear Fuels Storage and Transportation Planning Project U.S. Department of Energy 10 th Meeting of the U.S.-Argentina.
Federal Emphasis on Accountability in Higher Education and Regional Accreditation Processes Carla D. Sanderson Commissioner, Southern Association of Colleges.
California Energy Commission James Madigan April 27, 2015.
NEI Presentation on Nuclear Decommissioning Trust (NDT) Use Concerns.
VERMONT YANKEE Transitioning into SAFSTOR ​SEPTEMBER 2, 2015 Paul Paradis Director Decommissioning.
August 4,  Vermont Yankee Nuclear Power Station (VYNPS) ceased power operations on December 29, 2014 after 633 days of continuous power operation.
Hanford Spent Nuclear Fuel and Cesium/Strontium Capsule Status Presented by Sen Moy - RL National SNF Meeting November 8, 2005.
Eric M. Davied American Nuclear Society Texas A&M University
1 LICENSING A U.S. GEOLOGICAL REPOSITORY WILLIAM BORCHARDT Executive Director for Operations U.S. Nuclear Regulatory Commission.
Integrated Used Nuclear Fuel Management Regulatory Information Conference U.S. Nuclear Regulatory Commission March 11, 2009 Steven P. Kraft Senior Director.
U.S. Energy Policy Legislation Thelma L. Wiggins Manager, Media Relations Nuclear Energy Institute ENS PIME 2004 Barcelona, Spain Feb. 9, 2004.
Developing a Data Base Supporting Very long- term Storage of Spent Nuclear Fuel R E Einziger, Ph.D., E. Benner, and C. Regan Spent Fuel Storage & Transportation.
Winter Committee Meetings NARUC Subcommittee on Nuclear Issues.
Presented to: National Spent Nuclear Fuel Program Presented by: Ned Larson, Director Infrastructure Development Division Office of National Transportation.
The 3 Yankee Companies Interim Storage Sites for SNF & GTCC Waste NEHLRW Transportation Taskforce Meeting Portsmouth, NH, December 16, 2015 Eric Howes,
November 4,  Vermont Yankee Nuclear Power Station (VYNPS) ceased power operations on December 29, 2014 after 633 days of continuous power operation.
Betsy Madru VP Government Affairs
Congressional and Capitol Hill Issues and Update Dr. Jack Dugan SPAFOA May 1, 2014.
 closure E M Environmental Management  cleanup  performance safety STRATEGY MEETING NATIONAL SPENT NUCLEAR FUEL PROGRAM Bringing Innovation to Spent.
TRANSPORTATION OF USED FUEL December 2015 Pierre OneidJack Edlow Holtec InternationalEdlow International Company.
The Yucca Mountain Repository for Nuclear Waste June Edward F. Sproat III Director Office of Civilian Radioactive Waste Management U.S. Department.
Regional Planning CCRPC Board Training March 21, 2012.
2013 SCOWT WASHINGTON MEETING/ WASHINGTON, DC 20 JUNE2013 AASHTO Waterborne Freight Bottom Line Report Chris Smith Intermodal Policy and Program Manager.
Vermont Yankee- The Last Yankee Standing Bev Good Entergy Nuclear- Sr. Project Manager Boston, MA July 29,
THE ROLE OF ENERGY COMMUNITIES IN A CONSENT-BASED SITING PROCESS Chuck Smith Councilmember, Aiken County, SC Chair, Energy Communities Alliance NEI Used.
Policy Committee Report Virginia Recycling Association Annual Members Meeting Charlottesville, Virginia November 8, VRA Policy Committee Report1.
Vermont Yankee Nuclear Power Corp. v. NRDC, 435 U.S. 519 (1978) Strategic Delay in Derailing Public Policy.
N O L UTI O NS OI ZS LLC An EnergySolutions Company Zion Status Update for Zion Community Advisory Panel. John Sauger – General Manager February 22, 2016.
FY 2012 Budget Press Briefing February 14, NRC FY 2012 Budget NRC Mission: License and regulate the Nation’s civilian use of byproduct, source,
Consent-based Siting in the United States Timothy A. Frazier June 9, 2016.
Nuclear Fuels Storage & Transportation Planning Project Office of Fuel Cycle Technologies Nuclear Energy Current Status of Shutdown Sites Activities Vermont.
Decommissioning San Onofre
Analysis of Low Activity Waste Streams and Volumes in Decommissioning NPPs  Lisa Edwards Sr. Program Manager, EPRI LLW Forum April 13-14, 2016.
“Status of the ReACTOR Decommissioning Program” October 7, 2016 LLW Forum Ted Smith, Project Manager Reactor Decommissioning Branch Division of Decommissioning,
Decommissioning Issues
North American Free Trade Agreement
3 Yankee Companies and National Spent Nuclear Fuel Issue Update
John Christian President, Logistics, Processing and Disposal
3 Yankee Companies Update and Perspective on SNF Issue
LLRW Forum April 2015.
At-Risk Nuclear Plants: Challenges and Opportunities
Vermont Yankee Decommissioning Update
Janet R. Schlueter Senior Director, Radiation and Materials Safety
Spent Nuclear Fuel and Waste Disposition Program Update
Joseph D. Anderson, Chief
3 Yankee Companies and National Spent Nuclear Fuel Issue Update
CR3 and Crystal River Energy Complex
Nuclear Waste Storage Current Status and Plans
DOE’s Centralized Storage Design Alternatives and Security Regulations Jeff Williams Project Director, Nuclear Fuels Storage and Transportation.
Possible Transition from Operating to Decommissioning
AASHTO Waterborne Freight
progress of the water reform in bulgaria
Decommissioning Rulemaking
Thomas Koshy, On Behalf of Brian Thomas, Director
National Radioactive Waste Management Agency Bill
Spent Fuel Storage and Transport for Shutdown and Decommissioning Nuclear Plants Rod McCullum November 28, 2018.
Katrina McMurrian Executive Director Nuclear Waste Strategy Coalition
Residential Retrofit: At the Nexus of National Energy Policy
LEGISLATIVE OUTLOOK Baker Elmore Senior Director, Governmental Affairs
Steven J. Maheras International Conference on the Management of Spent Fuel from Nuclear Power Reactors: Learning from the Past, Enabling the Future June.
Presentation transcript:

The 3 Yankee Companies Shutdown Sites Storing Stranded SNF and GTCC Waste NEHLRW Transportation Taskforce Meeting June 8, 2016 Orlando, FL Eric Howes, Director Public & Government Affairs, Maine Yankee

Presentation Overview The 3 Yankee Companies: shutdown commercial sites without an operating reactor storing stranded SNF and GTCC waste; all 3 are “ISFSI Only” sites Transportation and storage challenges associated with stranded SNF National status of the SNF removal/disposal issue Pilot Consolidated Interim Storage: a promising pathway to SNF removal starting with shutdown sites

13 Shutdown Site Locations (courtesy of DOE) Trojan Humboldt Bay Rancho Seco Zion La Crosse Big Rock Point Maine Yankee Yankee Rowe CT Yankee Crystal River Kewaunee San Onofre Vermont Yankee 13 Shutdown Site Locations (courtesy of DOE)

3 Yankees: Stranded Fuel Storage Sites Maine Yankee, Connecticut Yankee, & Yankee Rowe were single unit sites shutdown in the 90’s; all SNF & GTCC moved to stand-alone ISFSIs by 2005; NAC International canisters licensed for Storage & Transport; plant structures removed; sites environmentally restored; plant decommissionings complete by 2007. Yankee sites have been stand-alone ISFSIs for over 10 years.

3 Yankees: Stranded Fuel Storage Sites Three companies have been in litigation with the federal government since 1998 to recover costs resulting from the government's failure to fulfill its contractual obligations. The courts have awarded the three companies about $470m for damages through 2012. When DOE fulfills its contractual obligations to remove SNF & GTCC, the ISFSIs will be decommissioned, NRC licenses terminated, three companies will go out of business, properties will be available for other uses.

3 Yankees: Stranded Fuel Storage Sites Until then, as NRC licensees, the three companies are required to stay in business and are responsible for storing the 115 SNF canisters & 8 GTCC canisters in accordance with all regulatory requirements at an average cost per company of about $10 m/year. Court confirmed in most recent decision that had DOE performed as required by contract MY would have been out of business by end 2008, CY and YR by end 2010.

Connecticut Yankee Site Former Barge Slip

Yankee Rowe Site

Maine Yankee Site Barge Slip

Maine Yankee ISFSI Railroad Track

Transportation Challenges DOE team visited the 3 Yankee sites in 2012 to evaluate site infrastructure for SNF/GTCC removal. Report: Preliminary Evaluation of Removing Used Nuclear Fuel from Shutdown Sites https://curie.ornl.gov/ . Equipment will have to be mobilized to transfer SNF & GTCC canisters to transportation casks when DOE begins meeting its obligation. We are encouraged DOE has contracted for the rail car design, but the transport casks have yet to be manufactured, procured by DOE.

Large Radioactive Components Shipped During Decommissioning

Storage Challenges Some Examples of shutdown site storage challenges: Developing/Implementing Aging Management Program together with NRC, industry, EPRI - a very large effort. Renewing NAC canister storage licenses which expire in 2020; a multi-year effort at the 3 Yankee sites involving the companies, vendor and NRC. This summer removing GTCC lid to inspect beneath it and also inspecting canister with camera. Also, atmospheric monitoring ongoing, especially for chlorides. Results will benefit 3 Yankees and industry.

Status SNF Removal/Disposal Issue The SNF removal/disposal program has been stalled since 2010 when the Administration stopped the Yucca Mountain program with no plan B in place. Meaningful program reform is unlikely this year given the November election and continued differences between the House and Senate on SNF policy. The House Energy & Water Approps Committee bill contains $150 m for YM and $20 m for NRC to continue work on the YM license application.

Status SNF Removal/Disposal Issue The committee bill failed to pass the House on May 26 due to amendments unrelated to nuclear waste. The Senate E&W bill was approved by the Senate on May 12, 90-8. It provides for a pilot consolidated interim storage program for SNF at shutdown sites and authority for DOE to enter into contracts with private entities for the management of SNF DOE holds title to and $10 million for that purpose from DOE NE, not the NWF. The House bill does not mention CIS and the Senate bill does not mention Yucca Mountain.

Status SNF Removal/Disposal Issue Congressman Conaway (R, TX) and Congressman Mulvaney (R,SC) each have bills in the House that would implement a pilot CIS program and allow DOE to contract with private entities. No hearing scheduled on either bill. Rep Matsui (D,CA), Pingree (D, ME) and others sent a letter in March to the House Chair/Ranking Member Appropriations Committee urging bill language supporting a pilot CIS. House Energy and Commerce Subcommittee Chair Shimkus (R, IL) supports funding for YM and opposes CIS. He has indicated he is likely to submit a bill to address among other items land ownership and water rights issues at YM.

Status SNF Removal/Disposal Issue Energy and Commerce Committee Chairman Upton (R, MI) and Subcommittee Chairman Shimkus sent a letter in late February requesting the U.S. Government Accountability Office assess the DOE’s ability to complete the Yucca Mountain License Application. Chairman Upton and Subcommittee Chairman Shimkus also sent a letter in March to Secretary Moniz with questions seeking information relating to DOE’s nuclear waste management policy authorities in addition to Yucca Mountain and that DOE not take any actions that would impact the future viability of Yucca Mountain.

Pilot CIS Program: A Promising Pathway CIS should be a key near term component of an integrated waste management program since a permanent geologic repository is likely decades away - 2048 or later? Implementing a Pilot program with priority removal of SNF from shutdown sites to a CIS facility is consistent with the BRC recommendations and is a milestone in DOE’s 2013 strategy. The pilot program for CIS has bipartisan support and is embodied in House and Senate bills.

Pilot CIS Program: A Promising Pathway A pilot CIS program to remove SNF from shutdown reactor sites would: Demonstrate the federal government’s ability to safely manage/transport SNF/GTCC waste and end the government’s liability at these sites; Restore trust that the government can meet its obligations; Make more efficient & cost effective the storage/security of the SNF; Provide a nearer term solution than a geologic repository. As the Chairs of the 4 NE citizens advisory panels said in their Nov 2015 letter to the NE congressional delegation: Indefinite on-site storage of this material stranded in the communities we live and work in is unacceptable. We agree.

Pilot CIS Program: A Promising Pathway And as you know there are sites that want to host a CIS facility… Private initiatives in West TX and SE NM are moving forward. Waste Control Specialists in TX submitted a license application for a proposed CIS Facility to the NRC April 28. WCS has indicated their facility could be complete as early as 2021 if the NRC license is issued and legislative and contractual issues are resolved in that timeframe. The Eddy-Lea Alliance in SE NM is expected to submit their license application to the NRC for a proposed CIS facility in November this year and hopes to have their facility operational in a timeframe similar to WCS.

Pilot CIS Program: A Promising Pathway As stated by the four NE Community Advisory Panel Chairs in their Nov 2015 letter to the NE congressional delegation: “We believe that the federal government can meet its obligation in the nearer term by implementing a pilot consolidated interim storage project focused initially on the removal of SNF from sites without an operating reactor”… “Progress toward a repository must also occur but not at the expense of addressing the needs of our communities that could be achieved in the nearer term.”

Thank you. Questions?