Richard J. Tesarek Fermilab For the CDF Collaboration

Slides:



Advertisements
Similar presentations
Freiburg Seminar, Sept Sascha Caron Finding the Higgs or something else ideas to improve the discovery ideas to improve the discovery potential at.
Advertisements

B. List, ETH Zürich Page 1 Report from H1: PRC Open Session, H1: Status and Prospects Benno List Institute for Particle Physics, ETH Zürich.
FPCP 2002, 05/16-18/2002 p. 1 Richard E. Hughes, The Ohio State UniversityCDF Run II Status Status of CDF and Prospects Flavor Physics and CP Violation.
Recent Electroweak Results from the Tevatron Weak Interactions and Neutrinos Workshop Delphi, Greece, 6-11 June, 2005 Dhiman Chakraborty Northern Illinois.
Electroweak Physics at the Tevatron Adam Lyon / Fermilab for the DØ and CDF collaborations 15 th Topical Conference on Hadron Collider Physics June 2004.
Michele Gallinaro, "QCD Results at CDF" - XXXVIII Rencontres de Moriond, March 22-29, QCD Results at CDF Inclusive Jet Cross Section Dijet Mass.
Silicon Tracking for Forward Electron Identification at CDF David Stuart, UC Santa Barbara Oct 30, 2002 David Stuart, UC Santa Barbara Oct 30, 2002.
1 CDF Results on B Physics Masashi Tanaka (Argonne) The Tevatron Connection June 24th, 2005.
Workshop on Quarkonium, November 8-10, 2002 at CERN Heriberto Castilla DØ at Run IIa as the new B-Physics/charmonium player Heriberto Castilla Cinvestav-IPN.
EPS 2003, July 19, 2003David Buchholz, Northwestern University Performance of the D0 Experiment in Run II Detector Commissioning and Performance Accelerator,
Alexander Khanov 25 April 2003 DIS’03, St.Petersburg 1 Recent B Physics results from DØ The B Physics program in D Ø Run II Current analyses – First results.
Nick Hadley Run II Physics (I) Nick Hadley The University of Maryland New Perspectives 2000 Fermilab - June 28, 2000.
Scientific Highlights : CDF Experiment 1.Introduction 2.CDF Run-II detector 3.Phyiscs highlights B Physics, Top, Higgs, … to be continued by Rob October.
W properties AT CDF J. E. Garcia INFN Pisa. Outline Corfu Summer Institute Corfu Summer Institute September 10 th 2 1.CDF detector 2.W cross section measurements.
University of Athens, Physics Department Section of Nuclear and Particle Physics & IASA HEP Workshop, Athens, April 17 th 2003 Nikos Giokaris CDF & TEVATRON.
June 28, 2002BEACH2002 B Physics at the Tevatron B Physics at the Tevatron Jack Cranshaw Texas Tech University For the CDF and D0 Collaborations.
Collider Detector at Fermilab Sung-hyun chang High Energy Physics lab. KNU.
Gavril Giurgiu, Carnegie Mellon, FCP Nashville B s Mixing at CDF Frontiers in Contemporary Physics Nashville, May Gavril Giurgiu – for CDF.
The CDF Online Silicon Vertex Tracker I. Fiori INFN & University of Padova 7th International Conference on Advanced Technologies and Particle Physics Villa.
ICHEP 2002 First Heavy Flavor Results Using the Silicon Vertex Trigger A. Cerri.
FNAL Users’ Meeting, 06/02/03, p. 1 Top and Electroweak Results from CDF Igor Volobouev LBNL for the CDF Collaboration.
All Experimenters MeetingDmitri Denisov Week of July 16 to July 22 D0 Summary  Delivered luminosity and operating efficiency u Delivered: 1.6pb -1 u Recorded:
Study of Standard Model Backgrounds for SUSY search with ATLAS detector Takayuki Sasaki, University of Tokyo.
D0 Status: 01/14-01/28 u Integrated luminosity s delivered luminosity –week of 01/ pb-1 –week of 01/ pb-1 –luminosity to tape: 40% s major.
All Experimenters MeetingDmitri Denisov Week of July 7 to July 15 Summary  Delivered luminosity and operating efficiency u Delivered: 1.4pb -1 u Recorded:
Electroweak and Related Physics at CDF Tim Nelson Fermilab on behalf of the CDF Collaboration DIS 2003 St. Petersburg April 2003.
DPF2000, 8/9-12/00 p. 1Richard E. Hughes, The Ohio State UniversityHiggs Searches in Run II at CDF Prospects for Higgs Searches at CDF in Run II DPF2000.
Fermilab Users Meeting June R.J. Tesarek Fermilab CDF 2002 Toward Physics Richard J. Tesarek Fermilab For the CDF Collaboration.
Jet Physics at CDF Sally Seidel University of New Mexico APS’99 24 March 1999.
CDF Status and Prospects Stephen Miller University of Michigan 5 th International Conference on Hyperons, Charm and Beauty Hadrons June 28, 2002.
Lukens - 1 Fermilab Seminar – July, 2011 Observation of the  b 0 Patrick T. Lukens Fermilab for the CDF Collaboration July 2011.
Aurelio Juste (Fermilab) Rencontres de Moriond, March OUTLINE Tevatron Run 2 The upgraded DØ Detector Status Performance First Physics Results Outlook.
Chunhui Chen, University of Pennsylvania 1 Heavy Flavor Production and Cross Sections at the Tevatron Heavy Flavor Production and Cross Sections at the.
SVT Nov 7, 2002Luciano Ristori - Vertex2002_7Nov02.ppt1 SVT The CDF Silicon Vertex Trigger Vertex 2002 Luciano Ristori Istituto Nazionale di Fisica Nucleare.
CP violation in B decays: prospects for LHCb Werner Ruckstuhl, NIKHEF, 3 July 1998.
Search for High-Mass Resonances in e + e - Jia Liu Madelyne Greene, Lana Muniz, Jane Nachtman Goal for the summer Searching for new particle Z’ --- a massive.
Status Of Tevatron Collider Experiments and its Physics 성균관 대학교 물리학과 유인태 유인태 Workshop on Physics at Hadron Colliders KIAS 2005 년 6 월 24 일.
Jet Studies at CDF Anwar Ahmad Bhatti The Rockefeller University CDF Collaboration DIS03 St. Petersburg Russia April 24,2003 Inclusive Jet Cross Section.
Susan Burke DØ/University of Arizona DPF 2006 Measurement of the top pair production cross section at DØ using dilepton and lepton + track events Susan.
First physics results with the Silicon Vertex Trigger at CDF-II 2 nd Workshop on the CKM Unitarity triangle. April 5 th -9 th IPPP Durham, England, UK.
DØ Beauty Physics in Run II Rick Jesik Imperial College BEACH 2002 V International Conference on Hyperons, Charm and Beauty Hadrons Vancouver, BC, June.
1 Experimental Particle Physics PHYS6011 Fergus Wilson, RAL 1.Introduction & Accelerators 2.Particle Interactions and Detectors (2) 3.Collider Experiments.
Kaori Maeshima Fermilab Jan. 12, University Evolution: Search in High Mass Dilepton Channel in CDF Pre Run I Run 1A, Run 1B, and Run II......
Run 2 Jets at the Tevatron Iain Bertram Lancaster University/DØ Experiment PIC2003  Inclusive Cross Section  Dijet Mass  Structure.
IVth LHC Symposium, May 1-3, FermilabJianming Qian, University of Michigan Snapshot of Tevatron collider CDF detector DØ detector & First Run II.
All Experimenters MeetingDmitri Denisov Week of July 22 to July 29 D0 Summary  Delivered luminosity and operating efficiency u Delivered: 3.1pb -1 u Live:
Search for a Standard Model Higgs Boson in the Diphoton Final State at the CDF Detector Karen Bland [ ] Department of Physics,
QCD Prospects for ATLAS Rainer Stamen Universität Mainz On behalf of the ATLAS collaboration QCD 06 Montpellier, July 3rd 2006.
Searches for Resonances in dilepton final states Searches for Resonances in dilepton final states PANIC th -14 th November 2008, Eilat, ISRAEL A.
The CDF Upgrade - Incandela -CERN - January 26, 2001 slide 1 96 wire planes –(8 superlayers) –50% are 3 o stereo –Uniform drift (0.88 cm cell) –30,240.
A.RuizBEACH2000 CP Violation and B-mixing in CDF-II IV International Conference on Hyperons, Charm and Beauty Hadrons June, 27-30, 2000 Valencia,Spain.
Search for Standard Model Higgs in ZH  l + l  bb channel at DØ Shaohua Fu Fermilab For the DØ Collaboration DPF 2006, Oct. 29 – Nov. 3 Honolulu, Hawaii.
The Tevatron’s Run 2 Physics Program Al Goshaw Duke University and Fermilab PHENO 2001 Madison May 8, 2001.
More technical description:
Electroweak Physics Towards the CDR
Particle detection and reconstruction at the LHC (IV)
Kevin Burkett Harvard University June 12, 2001
14 paesi, 62 universita’ e laboratori
First CDF Run II Results
The Silicon Track Trigger (STT) at DØ
Yuri Gershtein for the DØ collaboration
Preparation of the CLAS12 First Experiment Status and Time-Line
CMS Physics Analysis in China
Experimental Particle Physics PHYS6011 Putting it all together Lecture 4 6th May 2009 Fergus Wilson, RAL.
Top Quark a particle odyssey Todd Huffman University of Oxford
University of Tsukuba, Japan Particle Physics Phenomenology,
Experimental Particle Physics PHYS6011 Putting it all together Lecture 4 28th April 2008 Fergus Wilson. RAL.
Experimental Particle Physics PHYS6011 Joel Goldstein, RAL
B Physics at In relation to SUSY ? 4th Workshop on Mass Origins
Susan Burke, University of Arizona
Presentation transcript:

Richard J. Tesarek Fermilab For the CDF Collaboration CDF 2002 Toward Physics Richard J. Tesarek Fermilab For the CDF Collaboration Fermilab Users Meeting June 10 2002 R.J. Tesarek Fermilab

Outline CDF Run II Physics Program CDF II Detector Status Where were we last year Progress since then Detector Performance Muon Calorimetry Tracking Silicon Particle ID Trigger Detector Operations Good News/Bad News Offline Reconstruction Physics for this Summer Heavy Flavor QCD Electroweak Near Term Plans Summary Fermilab Users Meeting June 10 2002 R.J. Tesarek Fermilab

CDF Run II Physics Goals Precision top and electroweak physics Higgs Bounds Discovery/Exclusion of light Higgs Discovery/Exclusion of light SUSY Searches: Quark-lepton compositeness New particle substructure New dynamics New forces Extra dimensions New space/time structures Fermilab Users Meeting June 10 2002 R.J. Tesarek Fermilab

CDF Run II Physics Goals Detailed study of B hadrons CP violation CKM constraints sin(2b) from B0/B0  J/y Ks |Vtd/lVts| from B0-B0 and Bs-Bs flavor oscillations Lifetimes Production cross section Narrow window of opportunity Fermilab Users Meeting June 10 2002 R.J. Tesarek Fermilab

CDF II Detector All new electronics New trigger & DAQ New software Fermilab Users Meeting June 10 2002 R.J. Tesarek Fermilab

CDF II Detector Components from run 1 New for run 2 Central and extension muon system Central & wall calorimeters Solenoid & lots ‘ o steel New for run 2 Forward muon detectors Tracking systems Central tracker (COT) Silicon tracker (L00, SVX, ISL) End plug calorimeter Luminosity Monitor Time of flight Front end electronics (132ns) DAQ & trigger Software Fermilab Users Meeting June 10 2002 R.J. Tesarek Fermilab

Last Year Accelerator turning on Installing/connecting new detectors Silicon Forward muon detectors Time of flight Commissioning detectors Reproducing commissioning run results Fixing dead/hot channels Correcting noisy channels Commissioning trigger hardware L1 track trigger L2 trigger boards Writing tuning software L3 algorithms Offline reconstruction Fermilab Users Meeting June 10 2002 R.J. Tesarek Fermilab

Now Accelerator tuning up Luminosity on the rise Fewer beam related problems Store Initial Luminosity Fermilab Users Meeting June 10 2002 R.J. Tesarek Fermilab

Now CDF Tuning up More of experiment running Improving data taking efficiency <Effic> = 67% Low=20% High=93% Details follow… Delivered Luminosity To Tape Fermilab Users Meeting June 10 2002 R.J. Tesarek Fermilab

Muon Systems Central & extension muon systems Run I Forward muon systems Run II Fermilab Users Meeting June 10 2002 R.J. Tesarek Fermilab

Muon Systems Central & Extension Muon Detectors System commissioned and aligned 95% live Triggering on muon track stubs Forward Muon Detectors (New) System commissioned 98% live Alignment underway Fermilab Users Meeting June 10 2002 R.J. Tesarek Fermilab

Calorimetry Central calorimeters Run I Plug & forward calorimeters Run II Fermilab Users Meeting June 10 2002 R.J. Tesarek Fermilab

Central Calorimeter Run I detector  New electronics Fully commissioned last summer Energy Measurements 100% PMTs/electronics working Energy scale calibrated to ~1% Reproducing response maps of Run I Position Measurements 99% chambers/electronics working Energy response calibration in progress Alignment to tracking ~5mm Reconstruction advancing Fermilab Users Meeting June 10 2002 R.J. Tesarek Fermilab

Plug Calorimeters New Detectors and new electronics Pb(Fe) scint. Sampling calorimeters Better E resolution Extended coverage More reliable Fully commissioned last summer Energy Measurement 100% PMTs/electronics working Energy scale calibrated to ~1% Forward calorimeter (Mini Plug) Extend coverage in h to 47% instrumented Fermilab Users Meeting June 10 2002 R.J. Tesarek Fermilab

Plug Shower Max Position Measurement in new detector New electronics Central tracking only covers ~1/2 plug calorimeter 99% PMTs/electronics working Inter channel calibration complete Fermilab Users Meeting June 10 2002 R.J. Tesarek Fermilab

Plug Performance Calorimeter 100% live Shower Max 99% live Calibrations complete (~1% scale uncertainty) Fermilab Users Meeting June 10 2002 R.J. Tesarek Fermilab

Time of Flight (TOF) Identify p, K, p up to 2 GeV Fermilab Users Meeting June 10 2002 R.J. Tesarek Fermilab

Time of Flight fK+K- Fermilab Users Meeting June 10 2002 R.J. Tesarek Fermilab

Central Tracking New Detector & Electronics Hit resolution ~175mm Smaller cell size Multi-hit TDCs dE/dx encoded in pulse width Hit resolution ~175mm Single track efficiency 100% dE/dx P (GeV) Fermilab Users Meeting June 10 2002 R.J. Tesarek Fermilab

Detector X-ray Map out Material in CDF E loss and multiple scattering Feed into MC Close track pattern recognition Fermilab Users Meeting June 10 2002 R.J. Tesarek Fermilab

Silicon New Large system L00: SVXII: ISL: Improve d0 Increased accept 3D vertex finding ISL: Increase tracking to eta=2 Fermilab Users Meeting June 10 2002 R.J. Tesarek Fermilab

Silicon Commissioning Commissioning in progress Problems are mostly fixed during access Accelerator related problems Cooling problems in ISL Initial alignment good (s<50mm) Trigger Fermilab Users Meeting June 10 2002 R.J. Tesarek Fermilab

Luminosity Monitor Cherenkov radiation detector Increased segmentation in smaller area Less pile up at high rate Decreased sensitivity to secondary particles Direct measure of luminous region Timing and pulse height recorded Fermilab Users Meeting June 10 2002 R.J. Tesarek Fermilab

Detector Summary Subsystem % Comments Luminosity Monitor 100% Running Silicon: L00 SVX ISL 97% 90% 60% commissioning cooling+commissioning Central Tracker (COT) Missing one cell from broken wire Time-of-Flight Shower Max 99% Central aligned ~5mm Calorimeters Muon: central forward Chamber currents Forward Detectors 47% Fermilab Users Meeting June 10 2002 R.J. Tesarek Fermilab

Trigger L1: tracks, jets, leptons,ET, Missing ET L2: impact parameter, calorimeter clusters L3: full reconstruction 50 Hz ~20MB/s 300-500 Hz 45 kHz Fermilab Users Meeting June 10 2002 R.J. Tesarek Fermilab

Fast Track Trigger (XFT) MISSING SLIDE Fast Track Trigger (XFT) Fermilab Users Meeting June 10 2002 R.J. Tesarek Fermilab

Silicon Vertex Trigger (SVT) Impact/displaced vertex trigger Lxy Beam spot secondary vertex R PT Initial alignment < 50mm Real time position to MCR Resolution 48 mm Cut d0 > 120mm ct ~ 360um (B decays) Fermilab Users Meeting June 10 2002 R.J. Tesarek Fermilab

Hadronic B Trigger Trigger on fully hadronic b decays L1: >2 XFT tracks; PT > 1.5 GeV L2: >2 SVT tracks; PT > 2.0 GeV; d0 >120 mm Fermilab Users Meeting June 10 2002 R.J. Tesarek Fermilab

DAQ and Offline DAQ: Operating at design (20Mb/sec) Offline: Processing keeping up with DAQ DAQ: data to tape Offline: data processed Fermilab Users Meeting June 10 2002 R.J. Tesarek Fermilab

Operations “Smooth running until something breaks” Muon chamber currents Run I: CMP currents ~1mA Run II: CMP currents ~10mA Power supply failures Silicon problems October incident April incident ISL cooling Blocked lines Beam related backgrounds Fermilab Users Meeting June 10 2002 R.J. Tesarek Fermilab

Power Supply FailuresI 43 VME power supplies failed in the collision hall since last year Failures due to radiation soft power MOSFET undergoing single event burnout Solutions identified involving: Power supply modification Adjust power supply operating conditions Install radiation hard components Installation of additional shielding Fermilab Users Meeting June 10 2002 R.J. Tesarek Fermilab

ISL Cooling (Angioplasty) High power laser To clear lines Status: 12 blocked lines blocked at installation 5 lines cleared so far (6/9/02) Work continuing during shutdown Fermilab Users Meeting June 10 2002 R.J. Tesarek Fermilab

B Physics Program Start with charm Plans for summer conferences Total direct inclusive charm cross section pp  cc + X Ds+ – D+ mass difference Momentum scale calibrated Energy loss and multiple scattering understood Fermilab Users Meeting June 10 2002 R.J. Tesarek Fermilab

Charm Summer conferences D0K+p- D0p+p- D0K+K- Ratio of branching ratios D0K-p+ : D0p+p- D0K+K- D0K+p- D0p+p- D0K+K- Fermilab Users Meeting June 10 2002 R.J. Tesarek Fermilab

QCD + Jets Parton distribution functions at high Transverse energy (ET) Pseudorapidity (h) Quark-lepton compositness Fermilab Users Meeting June 10 2002 R.J. Tesarek Fermilab

CDF Highest Et Dijet Event Jet ET1=403.3 GeV, h1=0.037 Jet ET2=322.0 GeV, h2=-0.364 Vertex z = 39.0 cm Missing ET significance = 1.93 Fermilab Users Meeting June 10 2002 R.J. Tesarek Fermilab

W Reconstruction Data quality good! Fermilab Users Meeting June 10 2002 R.J. Tesarek Fermilab

Searches The hunt is on! Z’ -> m m Fermilab Users Meeting June 10 2002 R.J. Tesarek Fermilab

Near Term Plans Present Access June-Oct 2002 Oct 2002 Shutdown Clear ISL cooling lines Install temporary shielding Complete L2 trigger work June-Oct 2002 Finish commissioning silicon Take data Summer conferences Oct 2002 Shutdown Install additional shielding (proton side) Additional ISL cooling work Fermilab Users Meeting June 10 2002 R.J. Tesarek Fermilab

Summary CDF II detector is off and running Most detectors working near 100% Detector performance nearing/exceeding design spec Beginning to collect data with higher efficiency Silicon still being commissioned Beam related backgrounds First physics results this summer Look for more as the data arrives Fermilab Users Meeting June 10 2002 R.J. Tesarek Fermilab