TT Upgrade Power Review

Slides:



Advertisements
Similar presentations
H1 SILICON DETECTORS PRESENT STATUS By Wolfgang Lange, DESY Zeuthen.
Advertisements

ATLAS SCT Endcap Detector Modules Lutz Feld University of Freiburg for the ATLAS SCT Collaboration Vertex m.
Electrical QA Markus Friedl (HEPHY Vienna) IPMU, 19 March 2012.
Bulk Micromegas Our Micromegas detectors are fabricated using the Bulk technology The fabrication consists in the lamination of a steel woven mesh and.
Stations There are six stations of RPCs. They are 1-3 north, and 1-3 south. RPC3SRPC2S RPC1SRPC1N RPC2NRPC3N This document is available at
FNAL TB09 Plots Alessandra Borgia Syracuse Unviersity Marina Artuso, Jianchun Wang, Ray Mountain January 20, 2010.
VELO Beamtest Trigger VELO meeting 08/12/2005 Jianchun (JC) Wang Syracuse University.
The LHCb Inner Tracker LHCb: is a single-arm forward spectrometer dedicated to B-physics acceptance: (250)mrad: The Outer Tracker: covers the large.
Upstream Tracker Data Format JC Wang Upgrade Electronics & AMC40 Firmware Meeting 12/12/2013.
Performance of the DZero Layer 0 Detector Marvin Johnson For the DZero Silicon Group.
Experimental Area Meeting V. Bobillier1 Good connection to earth (in many points) of every metallic parts to be installed in the cavern is very.
VELO upgrade electronics – HYBRIDS Tony Smith University of Liverpool.
Infrastructure for LHCb Upgrade workshop – MUON detector Infrastructure for LHCB Upgrade workshop: MUON power, electronics, cable Muon upgrade in a nutshell.
DC/DC Converter Update Markus Friedl (HEPHY Vienna) B2GM, 22 July 2012.
The BTeV Tracking Systems David Christian Fermilab f January 11, 2001.
Development of Readout ASIC for FPCCD Vertex Detector 01 October 2009 Kennosuke.Itagaki Tohoku University.
F. Arteche, C. Esteban Instituto Tecnológico de Aragón D. Moya, I. Vila, A. L. Virto, A. Ruiz Instituto de Física de Cantabria Powering requirements and.
17/06/2010UK Valencia RAL Petals and Staves Meeting 1 DC-DC for Stave Bus Tapes Roy Wastie Oxford University.
VELO upgrade Front-end ECS LHCb upgrade electronics meeting 12 April 2012 Martin van Beuzekom on behalf of the VELO upgrade group Some thoughts, nothing.
1 Module and stave interconnect Rev. sept. 29/08.
1 5 December 2012 Laurent Roy Infrastructure / Electronics Upgrade -Cabling (long distance) -Rack and Crate (space, electrical distribution, cooling) -Detector.
M.Oriunno, SLAC Stave cable and module options. M.Oriunno, SLAC Background - module The IBL electrical unit for data output is a single chip The use of.
Construction and Installation Readiness of TOTEM Roman Pots Detectors Federico Ravotti (PH/TOT) Gennaro Ruggiero (PH/TOT) LHCC minireview – 06 May 2009.
Tariq J. Solaija, NCP Forward RPC EDR, Tariq Solaija Forward RPC EDR The Standard RPC for low  regions Tariq J. Solaija National Centre for.
Installation and operation of the LHCb Silicon Tracker detector Daniel Esperante (Universidade de Santiago de Compostela) on behalf of the Silicon Tracker.
Status of SVD Readout Electronics Markus Friedl (HEPHY Vienna) on behalf of the Belle II SVD Collaboration BPAC October 2012.
Work Package 3 On-detector Power Management Schemes ESR Michal Bochenek ACEOLE Twelve Month Meeting 1st October 2009 WPL Jan Kaplon.
Testbeam Studies of the LHCb Vertex Locator Modules Lisa Dwyer.
And now for something completely different First results from the DC-DC Stavelet Peter & Ashley with Giulio & John.
Ronald Lipton PMG June Layer 0 Status 48 modules, 96 SVX4 readout chips 6-fold symmetry 8 module types different in sensor and analog cable length.
S. Belogurov, ITEP, Moscow CBM Collaboration meeting, Split, CBM beam pipe and integration inside the Magnet Status report Sergey Belogurov,
GEM Trackers for Super BigBite Spectrometer (SBS) in Hall JLab The Super Big Bite Spectrometer (SBS) is one of the major new equipment in hall A in.
A. Ranieri / RPC-CMS Pre-loaded profile Synchronization & Control Board (SCB) The RPC electronics will consist of the FE board plus the Synchronization.
Optimization of the Silicon Tracking System (STS) layout and beam pipe configuration for the CBM experiment. Andrey Chernogorov, Sergey Belogurov, ITEP,
At the HERA collider in Hamburg an experiment (ZEUS) has been built to study electron-proton collisions. For the near future an upgrade of this experiment.
R+D for future accelerators at Santiago Pablo Vázquez IGFAE-USC Instituto Galego de Gísica de Altas Enerxías Universidade de Santiago de Compostela.
26 June 2006Imaging2006, Stockholm, Niels Tuning 1/18 Tracking with the LHCb Spectrometer Detector Performance and Track Reconstruction Niels Tuning (Outer.
P. Aspell CERN April 2011 CMS MPGD Upgrade …. Electronics 2 1.
- Performance Studies & Production of the LHCb Silicon Tracker Stefan Koestner (University Zurich) on behalf of the Silicon Tracker Collaboration IT -
12/3/2015R. Mountain, Syracuse University LHCb CO2 Cooling EDR2.
TC Straw man for ATLAS ID for SLHC This layout is a result of the discussions in the GENOA ID upgrade workshop. Aim is to evolve this to include list of.
Infrastructure for LHCb Upgrade workshop – MUON detector Infrastructure for LHCB Upgrade workshop: MUON power, electronics Muon upgrade in a nutshell LV.
1. Efficient trigger for many B decay topologies Muon System CALORIMETERS PRS + ECAL+ HCAL RICH1 VERTEX LOCATOR Efficient PID Good decay time resolution.
FIRST RESULTS OF THE SILICON STRIP DETECTOR at STAR Jörg Reinnarth, Jonathan Bouchet, Lilian Martin, Jerome Baudot and the SSD teams in Nantes and Strasbourg.
Rene BellwiedSTAR Tracking Upgrade Meeting, Boston, 07/10/06 1 ALICE Silicon Pixel Detector (SPD) Rene Bellwied, Wayne State University Layout, Mechanics.
RD program on hybrids & Interconnects Background & motivation At sLHC the luminosity will increase by a factor 10 The physics requirement on the tracker.
V.Aulchenko 1,2, L.Shekhtman 1,2, B.Tolochko 3,2, V.Zhulanov 1,2 Budker Institute of Nuclear Physics, , Novosibirsk, Russia Novosibirsk State University,
Martin van Beuzekom, Jan Buytaert, Lars Eklund Opto & Power Board (OPB) Summary of the functionality of the opto & power board.
Atlas SemiConductor Tracker final integration and commissioning Andrée Robichaud-Véronneau Université de Genève on behalf of the Atlas SCT collaboration.
CMS Phase 2 Tracker R&D R. Lipton 2/27/2014
DT-LHCb coordination meeting 18 April 2016
Developing Radiation Hard Silicon for the Vertex Locator
 Silicon Vertex Detector Upgrade for the Belle II Experiment
FCAL R&D towards a prototype of very compact calorimeter
- STT LAYOUT - SECTOR F SECTOR A SECTOR B SECTOR E SECTOR D SECTOR C
UT Optical Connections
Strawman module design
Cosmic Ray Tracker and Detector Control System at the GIF++
WG4 – Progress report R. Santoro and A. Tauro.
SIT AND FTD DESIGN FOR ILD
Work packages status in Torino and perspectives
The digital read-out for the CSC system of the TOTEM experiment at LHC
UNIZH and EPFL at LHCb.
Pradeep Ghosh for the CBM Collaboration Goethe-Universität, Frankfurt
Niels Tuning (Outer Tracker Group LHCb)
The digital read-out for the CSC system of the TOTEM experiment at LHC
The LHCb Level 1 trigger LHC Symposium, October 27, 2001
Setup for testing LHCb Inner Tracker Modules
Updates on the Silicon Tracker 2S Module
Presentation transcript:

TT Upgrade Power Review Marina Artuso, Christos Hadjivasiliou, Ray Mountain, Jianchun Wang LHCb Electronics Upgrade Meeting 10/11/2012

A Four-Layer UT Detector For TT upgrade, a 4-layer UT detector and its variation have been simulated. This configuration is based on the current TT with: better inner coverage (down to R=28mm), no gaps between sensors, and better Y segmentation, etc. UT has two stations, four layers: UTaX, UTaU, UTbV, & UTbX, similar to TT. One layer consists of 16 (18 for UTb) long modules and 2 short narrow modules at the top & bottom of beam pipe. A module has 13 (7) sensors with vertical strips. Most sensors have 512 strips (channels) each. The narrow ones have 320 strips per sensor. Those labeled “2” or “4” in the central region have double or quadruple number of strips. In total there are ~0.55 x106 channels, 4288 ASICs. UTaX layer D A 2 4 C B A B C This is not final configuration. 10/12/2012

Number of Electronic Channels The current TT detector has less segmentation in Y. The whole system has ~0.14 x106 channels read out through 1120 ASICs. The UT detector studied has ~0.55 x106 channels, ~4x more channels. There are more configurations to be studied, including options of more layers. Since the RICH1 will be removed, a six-layer UT may be favored. For power supply estimation purpose, one expects that the upgrade TT (UT) will have a factor of 4-6 more channels. 10/12/2012

Wiener Maraton power supply UT Power Supply Model Kapton tape DC-DC converter (2.5 CV) for whole module ASICs at sensor proximity Wiener Maraton power supply Module support The Wiener power supply currently used by TT is a good option. LV DC power is distributed to each module. Power is regulated by constant voltage DC-DC converter at the end of module. Regulated power is distributed to ASICs via Kapton tap. Sensor hybrid on both sides of module 10/12/2012

More on Power Regulation We would like to try out a model with power supply DC-DC converter (2.5 CV)  frontend electronics to check noise performance. More information is needed from the chip designers to validate this model. And we are in touch with Federico Faccio to get prototypes of DC/DC converters. 10/12/2012