AIDC Top priority in APAC

Slides:



Advertisements
Similar presentations
Background Hong Kong, China has put AIDC into operational use between HK and Sanya since Feb Standalone system use real-time data from ATM System.
Advertisements

Briefing on APANPIRG Priorities and Targets
FAA/Eurocontrol TIM 9 on Performance Metrics – INTEGRA Rod Gingell 16 May 2002.
Risk Management Introduction Risk Management Fundamentals
49 h Conference of Directors General of Civil Aviation, Asia and Pacific Regions, New Delhi, 8 – 12 October 2012 APANPIRG ACTIVITIES – OUTCOME OF APANPIRG/23.
Workshop on preparations for ANConf/12 − ASBU methodology
Pan regional ICD for AIDC structure and status (SP/09)
Information Management The ICAO Perspective
ICAO EUR/NAT Office Celso Figueiredo – Regional Officer ANS - ATM
Module 3 UNIT I " Copyright 2002, Information Spectrum, Inc. All Rights Reserved." INTRODUCTION TO RCM RCM TERMINOLOGY AND CONCEPTS.
APAC PBN Seminar F.LECAT (ICAO)
International Civil Aviation Organization Collaborative Decision Making (CDM) Saulo Da Silva Workshop on preparations for ANConf/12 − ASBU methodology.
International Civil Aviation Organization Unmanned Aircraft Systems International Standards Progress Leslie Cary Secretary UAS Study Group Technical Officer,
AIDC Top priority in APAC Special Implementation Project AIDC Bangkok, Oct Prepared by F.Lecat 1.
International Civil Aviation Organization Remotely-Piloted Aircraft Systems Saulo Da Silva Workshop on preparations for ANConf/12 − ASBU methodology (Bangkok,
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-25/PIA-2 Increased Interoperability, Efficiency and Capacity through.
ATM Implementation Support by ICAO APAC RSO
Presentation to: Name: Date: ICAO Asia-Pacific AMHS Activities & Status ICAO Asia-Pacific AMHS Activities & Status ATS Message Handling System (AMHS )
International Civil Aviation Organization SAM Regional Seminar/Workshop Tom Brady ICAO Air Navigation Bureau May Flight Plan Implementation and.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-105/PIA2 Meteorological information supporting enhanced operational.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-10/PIA 3 Improved Operations through Enhanced En-Route Trajectories.
Introducing Project Management Update December 2011.
28-31 October RASMAG STUDY ON THE EFFECT OF AIDC AND APANPIRG CONCLUSIONS Secretariat - APAC OFFICE 28 October 2014 SIP AIDC Seminar in Bangkok SP/01.
International Civil Aviation Organization European and North Atlantic Office ICAO FPL2012 WORKSHOP 29 June – 1 July 2010 Kiev, Ukraine Risk assessment.
APAC PBN Seminar F.LECAT (ICAO)
ICAO EUR/NAT Office Celso Figueiredo – Regional Officer ANS - ATM
ICAO EUR/NAT Office Celso Figueiredo – Regional Officer ANS - ATM
Workshop on preparations for ANConf/12 − ASBU methodology
Collaborative Decision Making (CDM) Saulo Da Silva
ATM Implementation Support by ICAO APAC RSO
Risk Assessment OSHA 21/09/ WHAT IS RISK ASSESMENT? Risk Assessment is the process of determining the possibility of short and long term unfavorable.
FF-ICE A CONCEPT TO SUPPORT THE ATM SYSTEM OF THE FUTURE
Remotely-Piloted Aircraft Systems
System of Systems (DRAFT) To be approved by the ICAO Council
Workshop on preparations for ANConf/12 − ASBU methodology
16th Session of RA II (Asia)
Monitoring and Evaluation Systems for NARS organizations in Papua New Guinea Day 4. Session 12. Risk Management.
SIP/2012/ASBU/Nairobi-WP/19
RASMAG STUDY ON THE EFFECT OF AIDC AND APANPIRG CONCLUSIONS
Presented by United Arab Emirates
A brief on APIRG Eng. John Tusubira Kagoro
NAM/CAR/SAM Quality Assurance Workshop Gustavo De León
A PERFORMANCE BASED GLOBAL AIR NAVIGATION SYSTEM: PART II
Workshop on preparations for ANConf/12 − ASBU methodology
APANPIRG ACTIVITIES – OUTCOME OF APANPIRG/23 DP/3/1
the International Civil Aviation Organization
Briefing on APANPIRG Priorities and Targets
Continuous Climb Operations (CCO) Saulo Da Silva
Workshop on preparations for ANConf/12 − ASBU methodology
SYSTEM SAFETY AND THE TECHNICAL AUTHOR
Date: st October 2016, Venue: CSIR ICC Pretoria, South Africa
AIDC Implementation in Hong Kong, China
Regional RAIM Prediction System – Progress Report
Blocks 2 & 3 Overview Samuli Vuokila Air Navigation Commissioner
DEFINITIONS.
COSCAP-SEA Work Programme Discussion Paper 3
ANConf/12 – Agenda H. Sudarshan
Air Carrier Continuing Analysis and Surveillance System (CASS)
Workshop on preparations for ANConf/12 − ASBU methodology
Continuous Climb Operations (CCO) Saulo Da Silva
Remotely-Piloted Aircraft Systems
Figure 3: Risk Analysis Model
Risk Management Process (Revised)
CHINA GO TEAM VISIT 2014 Opening Civil/Military Session
Unit I Module 3 - RCM Terminology and Concepts
COSCAP – SOUTH ASIA 19th MEETING OF THE STEERING COMMITTEE
Project Management Group
SAM Regional Seminar/Workshop
North Asia Regional Aviation
Presentation transcript:

AIDC Top priority in APAC Special Implementation Project AIDC Bangkok, 28-31 Oct. 2014 Prepared by F.Lecat

Outlines APAC priorities and targets related to AIDC Seamless item 220: AIDC Online seamless ATM reporting process AIDC TASK FORCE (APA/TF) terms of reference

APAC priorities and targets related to AIDC ­­­ Priority ASBU module or SeamlessElement Targets Target date (Seamless ATM Phase 1 Plan) Metric Flight and Flow Information for a Collaborative Environment (FF-ICE) B0-FICE 4. All States between ATC units where transfers of control are conducted have implemented the messages ABI, EST, ACP, TOC, AOC as far as practicable. 12 November 2015 % of FIRs within which all applicable ACCs have implemented at least one interface to use AIDC / OLDI with neighbouring ACCs Civil/Military Tactical Civil Military coordination (Regional) 7. Enhanced En-Route Trajectories: All States should ensure that formal civil military liaison for tactical response is established. % of States which have established a formal civil military liaison for tactical response Trajectory-Based Operations-Data Link En-Route B0-TBO 10. Within Category R airspace, ADS-C surveillance and CPDLC should be enabled to support PBN-based separations. % of FIRs using data link applications to support PBN-based separations in Category R airspace  

Seamless item 220: AIDC 7.35 ATM systems should enable AIDC (version 3 or later) between ATC units where transfers of control are conducted unless alternate means of automated communication of ATM system track and flight plan data are employed (ASBU Priority 1). As far as practicable, the following AIDC messages types should be implemented: Advanced Boundary Information (ABI); Coordinate Estimate (EST); Acceptance (ACP); TOC; and Assumption of Control (AOC). Note: the 18th Meeting of the Regional Airspace Safety Monitoring Advisory Group (RASMAG/18) determined that the following interface areas required AIDC priority implementation in order to reduce Large Height Deviations: a) Indonesia: between Jakarta and Chennai/Ujung Pandang/Brisbane/Melbourne FIRs; b) India: between Chennai and Kuala Lumpur FIRs; c) Philippines: between Manila and Fukuoka/Taibei/Hong Kong/Ho Chi Minh/Singapore/Kota Kinabalu/ Ujung Pandang FIRs; and d) China: between – i. Urumqi and Lahore FIRs; and ii. Beijing and Ulaan Baatar FIRs.

Online seamless ATM reporting process In my State/Administration, AIDC objective is applicable, our national plan was to implement the 5 message subset for 30/06/15 (planned date), and it is already achieved in 1 FIR. The full message set is planned for 15/07/18 and as of now my organization has implemented it in 0 FIR

Do not confuse with Transfer of control inside the sectors of the same ATSU

AIDC TASK FORCE (APA/TF) The Asia/Pacific ATS Inter-Facility Data-Link Coordination Task Force (APA/TF) shall be responsible for overseeing the expedition of AIDC implementation in accordance with the Asia/Pacific Seamless ATM Plan within the Asian Region, with a particular focus on the Bay of Bengal (BOB) and South China Sea (SCS) areas. The APA/TF shall support the implementation of AIDC within the Asia/Pacific Region by: identifying problems and barriers for implementation of AIDC, with a particular focus on the BOB and SCS areas and establish an action plan committing the stakeholders to agreed and realistic* milestones. The action plan should prioritize the actions according to the potential safety impacts of the considered issues and use the most efficient mechanisms including Small Working Groups (SWGs), aviation industry teams and/or Go-teams (subject to funding) where required, to directly assist Asia/Pacific administrations within the BOB and SCS areas; solving the problems according to the action plan; and taking any appropriate action to meet the AIDC regional targets (phase 1 for 2015 and prepare phase 2018) as far as practicable, including the development of Asia/Pacific AIDC implementation guidance material* to complement ICAO Standards and Recommended Practices and the deliverables of the ICAO Inter-Regional AIDC Task Force (IRAIDC TF).

AIDC TASK FORCE (APA/TF) Frequency The APA/TF shall meet approximately twice a year and will use webconferences. Schedule The TF should complete its work in accordance with the planning. An indication could be 1 to 2 years for tasks a and b and 2 to 3 years for task c/. Reporting The TF should report to APANPIRG through CNS SG. Composition of APA/TF   The APA/TF will consist of ATM and CNS representatives from Asia/Pacific States (ANS Providers), IATA, CANSO, IFALPA and IFATCA. Experts on AIDC from outside the Asia/Pacific may attend if their technical input would be beneficial to the APA/TF. Trans-regional States to the Asia/Pacific concerned by the action plan or having an interest in AIDC may also be invited.

Template for issues Issue reference Description Cause(s) suspected Date of first detection Operational impact(s) Safety impact Frequency Parties involved (States, Administrations, vendors, etc) Priority Action plan AIDC-ISSUE-1   AIDC-ISSUE-2 AIDC-ISSUE-3 AIDC-ISSUE-4 AIDC-ISSUE-5 AIDC-ISSUE-6 AIDC-ISSUE-7 There should be a continuity between AIDC seminar and APA/TF work

Template for issues Severity Meaning Value Catastrophic — Equipment destroyed — Multiple deaths A Hazardous — A large reduction in safety margins, physical distress or a workload such that the operators cannot be relied upon to perform their tasks accurately or completely — Serious injury — Major equipment damage B Major — A significant reduction in safety margins, a reduction in the ability of the operators to cope with adverse operating conditions as a result of an increase in workload or as a result of conditions impairing their efficiency — Serious incident — Injury to persons C Minor — Nuisance — Operating limitations — Use of emergency procedures — Minor incident D Negligible — Few consequences E Safety risk severity table (ICAO Doc 9859, Safety Management Manual) Likelihood Meaning Value Frequent Likely to occur many times (has occurred frequently) 5 Occasional Likely to occur sometimes (has occurred infrequently) 4 Remote Unlikely to occur, but possible (has occurred rarely) 3 Improbable Very unlikely to occur (not known to have occurred) 2 Extremely improbable Almost inconceivable that the event will occur 1 Safety risk probability table (ICAO Doc 9859, Safety Management Manual)