HE FEE Boards and testing

Slides:



Advertisements
Similar presentations
José C. Da Silva OFF DETECTOR WORSHOP, April 7, 2005, Lisboa SLB and DCC commissioning for 904.
Advertisements

1/8/04Lance Simms Thermal Testing of TOB/TEC Hybrids at UCSB.
HCAL-Fermilab7 Feb 2003Hazen / Machado HF Electronics PMT Readout Update E. Hazen, J. Rohlf, E. Machado Boston University.
TDR2 FM board tests D. Haas Test Setup Test Procedure Functional tests Results Test Schedule.
Slide 1UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE UCSB 4-Hybrid Thermal Test System Status 13 October 2003 Sam Burke Lance Simms.
ECAL electronics Guido Haefeli, Lausanne PEBS meeting 10.Jan
1. 2 Outline Contract Status  Q.A. plan  construction plan Preparations for construction  populating the construction space Microscope electronics.
1 HBD Construction status Itzhak Tserruya DC meeting, BNL, February, 2006 Plans for Run-6 Box construction GEM assembly and testing Status of urgent items.
Saverio Minutoli INFN Genova 1 1 T1 Electronic status Electronics Cards involved: Anode Front End Card Cathode Front End Card Read-Out Control card VFAT.
Uni Bergen:G. Eigen, J. Zalieckas, E. van der Kraaij FZU Prague: J. Cvach, J. Kvasnicka, I. Polák CALICE meeting, Argonne, 19/03/2014.
EC front unit status. Outline Conclusions from mechanical prototype and actions taken Status of electrical prototype KIT’s work for TA Dev plan (tests)
V. Bobillier1 Long distance cable installation status Calorimeter commissioning meeting.
By Naveed Ahmad! How to setup a. First of all, what are the parts of a Raspberry Pi? Source:
Figure 1: ICD Single Channel Block Diagram Schematic PMT High Voltage Supply (see Figure 4 & 4a) LED Pulser PMT Calibration (see Figure 6) ICD Scintillator.
CMS ECAL End Cap Meeting CERN 19 June to 23 June 2000 A.B.Lodge - RAL 1 ECAL End Cap High Voltage Cards and 2000 Electrical/Thermal Model. Progress on.
1 HO Upgrade: QC and Production Preparation in India Shashi Dugad India-CMS Meeting, BARC 30 July 2010.
Status report on the development of a readout system based on the SALTRO-16 chip Leif Jönsson Lund University LCTPC Collaboration Meeting
CHANTI update F. Ambrosino, T. Capussela, D. Di Filippo, P. Massarotti, M. Mirra, M. Napolitano, L. Roscilli, G. Saracino.
TALK, LKr readout and the rest… R. Fantechi, G. Lamanna 15/12/2010.
E.Guschin (INR,Moscow) 17 July 2007 CALO commissioning group meeting CERN Status of PS/SPD LED system.
CALIBRATION OF TEVATRON IONIZATION PROFILE MONITOR (IPM) FRONT END (FE) MODULES Moronkeji Bandele Physics and Engineering Department Benedict College,
TELL1 high rate Birmingham Karim Massri University of Birmingham CEDAR WG Meeting – CERN – 26/03/2012.
HB LED Pulser Boards By Michael Miller The University of Iowa.
ROBOX with Multi Anode PMT’s Status and plans A.Mestvirishvili, I. Schmidt, S. Sen, F. Ozok University of Iowa.
HF Front-end status Tullio Grassi 11 Dec Overview The HF FEE will change entirely, including the backplane. Only the cable plant (fiber, copper)
Single Module Tests (electrical) Inspect connectors and cables for visible damage C-measurement: make sure all pads are correctly connected HV test (1.5.
1 Calorimeters LED control LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Status of the calorimeters LV power supply and ECS control Status of.
Main HCAL, JUL1,2008Ivo Polak, IP_ASCR, Prague1 Calibration system with optical fibers HCAL main meeting, DESY.
Mathias Reinecke AHCAL Main Meeting Electronics Integration - Status Mathias Reinecke for the AHCAL developers.
HF FE Radiation tests at the CHARM facility Tullio Grassi 4 June 2015 Documentation on:
9/12/2003Ivan Hruska1 First box prototype –Box design in July ‘03 –Box produced during August ’03 Tested last week in few fingers Small changes necessary.
Plans and Progress on the FPGA+ADC Card Pack Chris Tully Princeton University Upgrade Workshop, Fermilab October 28, 2009.
SPD VFE installation and commissioning (status and plans) I.Summary of VFE installation II.Stand alone VFE test: noise & offset III.Stand alone test: LED.
Tile HCAL status Felix Sefkow CALICE Technical Board Review April 19, 2007.
Preparations to Install the HBD for Run 6 Craig Woody BNL PHENIX Weekly Meeting January 26, 2006.
HCAL1 Status 2004 Oleg Gavrishchuk, JINR, Dubna 1. HCAL1 performance in 2004 General design High Voltage system LED monitoring 2. Stability in 2003 Led.
Optical Calibration Updates Presentation for SK-UK Meeting 2016 Neil McCauley, Lauren Anthony, Adrian Pritchard, Joachim Rose 1.
HE NgCCM integration issues Ianos Schmidt, August 26, 2015.
AHCAL Electronics. Status of Integration Mathias Reinecke for the DESY AHCAL developers AHCAL main and analysis meeting Hamburg, July 16th and 17th, 2009.
TRIPLEGEM and VFATs at The Test Beam Area TRIPLEGEM and VFATs at The Test Beam Area N. Turini……reporter Eraldo Oliveri! Eraldo Oliveri main worker! N.
Trigger system for setup 2016 V. Rogov, V. Yurevich,D.Bogoslovski, S.Sergeev, O.Batenkov* LHEP JINR *V. G. Khlopin Radium Institute, St. Petersburg.
HE FEE Boards production status 26 th May 2016 Mandakini Patil 1.
HF ROBOX PRR3 Apr 2003E. Hazen HF Front-End Electronics ● System Description – Overview – PMT Board, ROBOX, Patch Panel – Signal Cable, Front-end boards.
HCAL upgrade FPGA FW: tasks and issues 12 May2016 Tullio Grassi, Univ. of Maryland.
Profiler Mechanics Update
Berkeley status Aug 10th, 2012.
Cosmic Microwave Technology, Inc.
SiPM linearization status update
LKr status R. Fantechi.
Upgrade activities at Clermont-Ferrand
LAV front-end and readout status
Baby MIND Collaboration Meeting #2
HF/HE Electronics Radiation Testing
HF Test station at P5 A.Mestvirishvili.
Radius disco Radius agujero Motor Controller Sensor Motor soporte.
T1 Electronic status Conclusions Electronics Cards:
PXD Summary Tests PXD9 Pilot Production ASICs Components Plans:
HB RM prototypes Ianos Schmidt Aug 17, 2017.
HB RM prototype component status
Presentation created by Jared D.
288 channel HE RBX? A conceptual exercise, NOT a proposal
An introduction to the Raspberry Pi
Front-end electronic system for large area photomultipliers readout
Pierluigi Paolucci - I.N.F.N. Naples
Felix Sefkow CALICE/EUDET electronics meeting CERN, July 12, 2007
STAR-CBM Joint Workshop Heidelberg, Physikalisches Institut
US Module Testing Progress Report
US Module Testing Progress Report
RPC Electronics Overall system diagram Current status At detector
BUCKEYE has internal shift register which controls calibration
Presentation transcript:

HE FEE Boards and testing 30th July 2016 Mandakini Patil

Aim and Work Plan Aim to assemble 5 Calibration Units by integrating all parts as much possible and test the same while at cern upto 15th July Given 9 tested SiPM Control Boards (barcodes for these ?) to Danila 30 More SiPM control boards coming next week 30 BV converter Boards tested and here at CERN and within specs To setup a standalone Test stand for testing the SiPM Control Boards of next batch at CERN in B28 using Raspberry pi board 30th July 2016 Mandakini Patil

Status of the CU Assembly 3 Pulser boards for CU are fitted inside the Al box,2 more will be done Scintillator black box with pigtails to be fitted next week Thermal pads put for 4 CU plates,one more to be done Missing screws and spacers to fix the dc dc modules to the pulser board ordered and being sent by Keti LC/LC couplers for 50 CU and the 50 Patch chord fibers ordered (thanks to Tullio and Tina) SMA connectors and the 400micron Quartz fibers (to be sent by Vasken) One CU standalone test setup being sent to CERN by Keti from KSU QIE board angle connector removed but solder pads 30th July 2016 Mandakini Patil

Testing of SiPM control Boards Plans at CERN Needed a HDMI Monitor (thanks to Sasha’s Order for the same) Also got the 9V PS,the keyboard and mouse for the setup The HDMI Monitor that is hooked up to the Raspberry pi board Have taken a production backplane board with LV module Have a CCMEmulator, ngCCM Emulator with me (given by Joe ) Have the test board with loaded resistorsfor 48 channels Registered the raspberry pi board to get a IP no. for ethernet connection for the same The Pi Board gives the I2c commands needed to control the SiPM Control Boards Registers and also to control the LED pulse 30th July 2016 Mandakini Patil

GUI for the test setup 30th July 2016 Mandakini Patil

Conclusion Gearing towards CU assembly and testing of 2nd batch of 30 SiPM control boards at CERN Testing of at least 1 – 2 HE CU with the one QIE card and integration with backend hopefully to be done soon. Next batch of 5 CU will be tested at TIFR in july last week and sent to CERN by 1st week of August Need a uHTR card to setup a test stand at TIFR for production boards testing ? 30th July 2016 Mandakini Patil

SiPM Control Boards linearity plot 30th July 2016 Mandakini Patil

DAC values vs Measured BV SIPM Board#10 DAC set Voltages Actual measured Voltage 10 V 10.0603 to 10.0662 (ch 1-48) 60V 60.233 to 60.230 (ch 1-48) 70V 70.216 to 70.218 (Ch1 -48) SiPM Board#4 10V 10.055 to 10.056 (ch1-48) 60V 60.144 to 60.147 (ch1-48) 70 V 70.120 to 70.119 (ch1-48) 30th July 2016 Mandakini Patil

Conclusions and Plans Gearing towards the CU Assembly at CERN in B186 Setup a test stand to test the SiPM+BV Boards (2nd Batch arriving in first week of july) Test the completed CU in B28 30th July 2016 Mandakini Patil

Extra Slides 30th July 2016 Mandakini Patil

TIFR Pulse Stand using backplane 30th July 2016 Mandakini Patil

TIFR Pulse Stand using backplane 30th July 2016 Mandakini Patil

TIFR Pulse Stand using backplane 30th July 2016 Mandakini Patil