Solder Frame Handling Soltec 03

Slides:



Advertisements
Similar presentations
A PRACTICE GUIDE How to use the bike racks on the Metro bus! A PRACTICE GUIDE Courtesy of North Seattle Community College.
Advertisements

IPTE Product Range EXPERTS IN FACTORY AUTOMATION.
Check-screening during dilute phase pneumatic conveying – improving quality without sacrificing productivity New Russell Blow Thru Sieve.
STOVES. 2 SIZES OF STOVE STOVE COMPONENTS WINDSHIELD BASE HANDLE SAUCEPANS FRYING PAN PACKING STRAP.
Dryer Components By: M Gummert J Rickman Agricultural Engineering Unit IRRI, Los Baños, Philippines.
AVANTE HYBRID Battery Dismantling Manual. Precautions for handling the hybrid battery Battery dismantling procedure Turning off the engine Disconnecting.
Handling Marking Depaneling Screen Printing Final Assembly Solder Frame Handling / Line Examples.
How do each part of a W.C’s work? Don’t worry I will explain everything to you.
© Easy Guides Australia A Pallet Truck is: a truck designed to lift and transport goods on a standard pallet or platform. They can be manually or power.
Molly, Gwyn, Sam, and Eric.  We got the Reflow oven to work- time to test it  Eric wrote MUX code- it compiles  Sam started on little PCB (PIC, connector,
CNC Tooling. CNC Tooling CNC Tooling Manual Tool Change Automatic Tool Change N10 M06 T5 N15 G01 X10 Y20 N20 G02 X30 Y20 R10 N25 M06 T7 N30 G01 X50.
Manual Handling Objectives ALL OF YOU: Will understand the importance of lifting and carrying objects safely MOST OF YOU: Will be able to give examples.
Precision and reliability for pick´n place. Exposures Screen Printing Taping Chip mounting Chip Bonding Grooving and cutting of PCBs Handling of PCBs.
Connectors 13/03/2013Collaboration meeting CERN - CSEM1.
Handling Marking Depaneling Screen Printing Final Assembly Solder Wave Unloading Lift.
Afternoon Agenda Deciding on your soldering equipment and important factors to consider on configuration for a robust process Reflow.
The milky way Milk on the road. S12 Computer Registrations from of the milk collection Road tanker TOC II Cabin Computer The collection route MTC IT System.
SUPPORT FUNCTION 1-1. SBS installation will be done same time by product specialist Loading & Unloading will be taken care for safe handling of.
 Test on cases:“Case Shipping Unit” Test  Used standards  Selection Chart  Test Plans  Test on pallets:“Pallet Shipping Unit” Test  Used standards.
Long pallet heavy workpiece MTS + on a large milling machine.
A PCB has 2 signal layers, a split power layer and one ground layer. It also has two solder mask and two silkscreen layers. Is the board classified as:
Network Communications Chapter 14 LAN Interconnection Devices.
SAFETY Laborers Suffering & Pain Amputation Loss of Life Wages Lost Supervisor Loss of prestige Loss of employee Loss of moral More supervision Management.
M. Alfonsi LNF/INFN Cagliari 5 May 2006 M1R1 mechanical requirements  Space constraint Frame and pannel Pads readout and trigger sectors Gas inlet and.
Floor Jacks and Stands Harkness Career Center. Floor Jacks Parts Identification.
General Machine Guarding #204 Workshop/Lab/Field Activity.
Transport & Handling of Detectors TAN Workshop S. Prodon –
LARP Collaboration Meeting Racetrack Coil Fabrication
Copyright © 2015 by The S.E.A. Group. OUTLET INLET What is the SR99? Breathing hose Copyright © 2015 by The S.E.A. Group Carry handle Airflow knob Pressure.
Data Upload and Entry. Goals Learn how to get data into XNAT from disk from disk from a scanner from a scanner to a local XNAT to a local XNAT to a remote.
11/02/2005M. Alfonsi - LNF1 DETECTOR CONSTRUCTION M. Alfonsi - LNF.
HOW DO YOU PROPERLY WASH YOUR HANDS? BY: By washing your hands, you get rid of any germs that could pass on colds to others.
Front Structure Load and Weld Station
1 You can create a report of points to stakeout with angle and distance from the occupied point. Points can be created for such items as end of embankment,
SECONDARY BEAM HANDLING AND INFRASTRUCTURE DESIGN STATUS BRUNO FERAL (CERN/EN) DIAMANTO SMARGIANAKI (CERN/EN) Project Leader: I.Efthymiopoulos (Cern/EN)
Appliance. Microwaves  Clean regularly with a clean wet cloth.  Use appropriate items in the use of this appliance. Name some safe ones…….
James McIntyre VRF Training Manager V5 Key Components.
AIR CONDITIONING SYSTEM. FUNCTION Air conditioning systems create a safe and comfortable environment for passengers and crews in the aircraft cabin. The.
Hydraulic axial forces acting on a Francis runner.
Open Your Setting First. Sellect Phone from Your Setting.
Air-cooled Modular Chiller Installation
Why Shwapno wanted to be Local GAP Program Owner
Baby-MIND Modules & Services
Safety Review & Equipment
CRANES By griffin.
Soldering process 1 Add the soldering material on the soldering pad of speaker in order to solder the wire on the speaker.
Step 1: Load paper Before you replace the ink cartridges and begin the alignment process, load paper in the printer. 1) Raise the input tray. 2) Remove.
Automatic Digitizing.
The manufacturer determines the inspection “out of service” criteria.
Pre-Reflow Inspection Station (PRIS)
Catania 20 Feb ’13 KM3NET Marine Operations Catania - Status
OF YOUR PRESENTATION HERE
اهداف ارگونومي راحتي و رضايت ارگونومي بهره وری سلامت.
Safety Stars Award BSSC
Module/Ladder Assembly
AQT90 FLEX Service Training
Condenso Condenso XS / XM / XP / XPHS Condenso XS: New Compact Design
TEMPLATESPARAPOWERPOINT.COM INSERT THE TITLE OF YOUR PRESENTATION HERE.
Hydraulic axial forces acting on a Francis runner
Interchangeable fixtures with several contact units
Bicycle Parking Systems
Process Flow For Electronic Component Prep
Surgical Technique 5.5Anchor
SOLID WASTE COLLECTION COLLECTION SERVICES COLLECTION SYSTEMS COLLECTION ROUTES NEED FOR TRANSFER OPERATION RESOURCE CONSERVATION AND RECOVERY.
Laboratory: A Typical Evaporation Process
Possible positions for automatic wear compensation
CLEAR FLOOR TWO POST LIFT Operation instruction

Sling cleaning. Sling cleaning The Life time of the Sling can be Shortened Handling error Lifting in the handles Getting stuck (wheelchair, bed, sling.

Presentation transcript:

Solder Frame Handling Soltec 03

Solder Frame Handling Soltec 03 Automatic lift of PCB back lead of empty solder frames cooling / cleaning 1 lift of PCB 2 PCB take out 3 lowering of transport level 4 Lift back lead Manual loading of solder frames back lead of empty solder frames www.asys-group.com

Oven Inlet Manual insert of solder frame automatic back lead Solder frame identification with reference to inlet place Scanner for solder frame identification Lift unit for solder frame www.asys-group.com

Line: Oven Inlet Work place Manual inlet and transport to inlet place segment Scanner for solder frame identification Lift unit for manual take out Stopper www.asys-group.com

Linie: Oven Outlet Cooling Cleaning Take over/ Unloading unit 1 Lift unit 2 Lift for empty frames 3 transport PCB Transport back of empty frames www.asys-group.com