1 Wastewater Capital Improvement Program (CIP) Large Users Meeting March 15, 2010.
Bids ranged from $992,264 to $1,999,305 JO-SH General Engineering was apparent low bidder Lash Construction 2 nd $1,156,453 Construction to start.
With the Genesee County Road Commission By Fred Peivandi, P.E. And Ken Johnson, P.E. Local Road Funding.
AWARD OF CONTRACT FOR CONSTRUCTION OF MASTER DRAINAGE FACILITY LINES D & D1 CIP NO City Council Meeting December 20, 2011.
PRE-QUALIFICATION AND BID ENTRY WEB APPLICATIONS CONTRACTS ADMINISTRATION Presenters: Juanita Moore Leila Griffin September 9, 2003.
Hide-A-Way Lake, Inc. Low Pressure Sewer System Prepared by Dungan Engineering, P.A.
1 Technical Assistance - PTAB Selecting and Hiring the Design Professional Dave Maxwell, P.E. Chairman, New Mexico Professional Technical Advisory Board.
PROJECT PHASES ACT Objective To provide an understanding of the design & construction process and the roles of the different participants in this.
AWARD OF CONTRACT FOR CONSTRUCTION OF CALIFORNIA OAKS ROAD AT I-15 INTERCHANGE CIP NO City Council Meeting January 18, 2011.
Wastewater Treatment Plant # 2 Engineering Services Council Workshop July 8, 2014.
EASTERN MUNICIPAL WATER DISTRICT County Water Company Consolidation Project Greg Kowalski, P.E. Senior Civil Engineer April 1, EXHIBIT.
1 EASTERN MUNICIPAL WATER DISTRICT Temecula Valley Regional Water Reclamation Facility 23-MGD Expansion Project Joe Mouawad, P.E. Senior Director.
Measure N Modernization IMPLEMENTATION PROCESS Planning, Bidding, Construction, and Occupancy.
1 EASTERN MUNICIPAL WATER DISTRICT Temecula Valley Recycled Water Pipeline Joe Mouawad Sr. Director of Engineering September 2, 2015.
SEWER TRUNK LINE REHABILITATION PROJECT (Alexandria Place, Black Oak and Navy Drive) COUNCIL AGENDA ITEM 14.1.
1 EASTERN MUNICIPAL WATER DISTRICT Cactus II Feeder Transmission Pipeline Joe Mouawad, PE Sr. Director of Engineering September 2, 2015.
1 | emwd.org MV 2060 Pressure Zone Potable Water Storage Tank and Transmission Pipeline Joe Mouawad April 6, 2016.
1 EASTERN MUNICIPAL WATER DISTRICT Quail Valley Sewer Improvements Sub-Area 9, Phase 1 Joe Mouawad, P.E. Sr. Director of Engineering October.
Approve Change Order No. 4 for the Caylor Wholesale Meter Modification Item 4B.
Brine Concentration Pilot Project (AquaSel) Update
UTILITY PARTNERSHIP CITY OF STOCKTON & OMI / THAMES WATER SERVICE CONTRACT.
1 | emwd.org AquaSel Brine Concentration Demonstration Project Khos Ghaderi, P.E. May 18, 2016.
Big Cypress Basin Capital Project Update Jeffrey Kivett, P.E., Director Operations, Engineering and Construction Division Jeffrey Kivett, P.E., Director.
EASTERN MUNICIPAL WATER DISTRICT Public Access Areas Renovation Project – Update Debbie Hoffman, PE Civil Engineer II March 23,
1 | emwd.org Indirect Potable Reuse (IPR) Public Outreach and Preliminary Design Services Joe Mouawad, P.E. and Jolene Walsh August 11, 2016.
CFW Caldwell Flores Winters, Inc. Facilities Planning, Public Finance, Program Administration Calistoga Joint Unified School District Financing Options.
1 EASTERN MUNICIPAL WATER DISTRICT Public Access Areas Renovation Project Debbie Hoffman, PE Civil Engineer II, Project Engineer July 1, 2015.
PROPOSED CITY OF STOCKTON WATERFORD ESTATES EAST PHASE II ASSESSMENT DISTRICT PUBLIC HEARING Stockton City Council January 6, 2004.
STOCKTON DELTA WATER SUPPLY PROJECT (DWSP) Final Environmental Impact Report (EIR) Certification Hearing November 8, 2005 Mark J. Madison, Director Municipal.
AquaSel Brine Concentration Pilot Project Update
TVRWRF 23 MGD Expansion Disinfection System Conversion
Water Booster Station Improvement Study
U.S. Air Force Cooperative Agreement for Perfluorinated Compounds Response Activities Jayne Joy, P.E. February 9, 2017.
2016 Presented by: Raffi Soghomonian
Sanitary Sewer Lift Station Rehabilitation Design Services Pre-Submittal Meeting September 20, 2016.
City of San Jacinto 7th Street Pavement Repairs
Light Rail Transit Project
Quail Valley Subarea 9, Phase 1 Sewer Award of Construction Contracts
Joe Mouawad, P. E. September 7, 2016
Cottonwood Recycled Water Pipeline (West)
Winchester Lift Station Odor Control Project
Analysis and Calibration of Sewer Flow Tenant Type Factors
Audie Murphy Road Sewage Lift Station Award of Construction Contracts
Case Road Sewer Joe Mouawad, P.E. October 27, 2016.
Perris Water Filtration Plant Membrane Upgrade – Phase I
District-Wide Well Maintenance, Rehabilitation, and Repair
Amendment to the Cooperative Agreement with Elsinore Valley Municipal Water District for Upper Temescal Valley Salt and Nutrient Management Plan Jayne.
Sausalito Downtown Public Restroom
Memorandum of Understanding with GE Osmonics, Inc
College II Tank Interior Recoating Award of Construction Contracts
Joint Parking Task Force Update Procurement & Strategic Sourcing
Voice Radio System Replacement Project
Mountain Avenue West Recharge Basin Project
Phase 3 Solar Renewable Energy Initiative - Site Improvements
Reach 4 Air Valve Replacements Award of Construction Contracts
Santa Ana River Conservation and Conjunctive Use Program: Program Development Phase Costs Brian Powell, P.E. 8/17/2016.
FIVE PROJECT PHASES 5C-3 Sun. 8:00-10:00am 21/ 2/2016.
Designers’ Manual Overview and Chapter Contents
Designers’ Manual Appendix Contents
Pinole-Hercules Water Pollution Control Plant Upgrade Project
Request for Proposal and Specifications for
Colchester Interceptor System Improvements Project
Galt Court Water Main Replacement
Delta Water Supply Project
Capital Facilities Program Update San Rafael City Schools
Construction Management Services April 16, 2018
Authorizing ED to Reject Bid for Contract P01005C10
Contract Award for the Colorado Street Bridge Suicide Mitigation Enhancements Project City Council May 20, 2019 Item # 7.
Brieana Reed-Harmel, Broadband Project Manager
Presentation transcript:

Sun City Lift Station Odor Control Improvements Joe Mouawad, P.E. April 28, 2016

Background The Sun City Lift Station (SCLS) conveys sewage collected from the communities of Sun City and Menifee to the Perris Valley Regional Water Reclamation Facility. Residents adjacent to the SCLS site expressed concerns regarding nuisance odors originating from the site. The District strives to be responsive to the concerns of the community and recommends upgrading the existing wet well foul air treatment system currently onsite. SUN CITY LIFT STATION

Interim Odor Control Measure Staff implemented an interim foul air control measure as a temporary immediate response. The existing foul air treatment system, a Biocube® operating at 900-cfm, was augmented with a rental Activated Carbon Filter (ACF). EXISTING BIOCUBE® ACF RENTAL UNIT

Odor Control System Upgrade Staff retained Black & Veatch (B&V) to perform an assessment and to identify alternatives. B&V recommended upgrading the foul air treatment system by installing a 6000-cfm biotrickling filter (BTF) in series with an ACF. B&V completed the design of the proposed upgrade and the project was advertised on February 1, 2016. BTF UNIT ACF UNIT SUN CITY LIFT STATION

Additional Site Improvements Installation of new pumps. Replace aged and worn discharge piping and supports in the wet well. Replace check valves. Repair damaged concrete and liner evident in the wet well. Replace the existing wet well cover with a new cover with seals. TEMPORARY REPAIR TO DAMAGED PIPE TEMPORARY COVER TEMPORARY SEALANT

Summary of Bid Results Apparent low bidder was Schuler Constructors, Inc., City of Corona, California. Bid in the amount of $2,543,120. Engineer’s Estimate was $3,189,000. The low bid was 20-percent less than Engineer’s estimate. Schuler Constructors, Inc. has successfully completed similar work for the District.

Engineering Support Services Staff negotiated a scope of work with B&V to perform Engineering Services During Construction (ESDC) including: Preparation of conformed Bid Documents Shop drawings and submittal review Responses to RFIs Testing and startup support Permitting assistance Development of Electronic Maintenance Manual (EOM) Preparation of Record Drawings Staff recommends awarding the ESDC contract to B&V based on their success with completing the final design and their demonstrated knowledge of this project.

Project Schedule Board Approval May 18, 2016 Notice to Proceed June 2016 Contract Duration 270 Calendar Days Substantial Project Completion March 2017

Recommendations Staff requests the Board approve and authorize the following: Execution by the General Manager of the District's standard form of contract with the lowest responsive bidder, Schuler Constructors, Inc., in the amount of $2,543,120; Rejection of all other bids received under Specification No. 1275S, except the second lowest responsible bid; Execution by the General Manager of the District's standard form of contract with Black and Veatch for engineering support during construction, in the amount of $186,970; Administrative Award and Execution by the General Manager of the District’s standard form of contracts with the necessary consultants and suppliers for implementation of Sun City Lift Station Odor Control Improvements; and Additional appropriation of $3,236,000, which brings the total estimated project cost to $3,491,800.  

Contact Information Joe Mouawad, P.E. Sr. Director of Engineering (951) 928-3777 Ext. 4463 Email: mouawadj@emwd.org