Upland Landfill Waste Discharge Application 7295 Gold River Highway

Slides:



Advertisements
Similar presentations
Municipal Solid Waste Defined in 40 CFR Part 258.2
Advertisements

Wastewater and Stormwater Discharge from Landfills Rick Pinneo Illinois EPA.
WASTE DISPOSAL By Heidi Rowlands November 2003.
Certification of Compliance By Evita Lagard
PREPARED BY- NABANITA SHARMA M.E. 3 RD SEMESTER ROLL NO.-10/12.
There are 3,091 active sanitary landfills in the U.S. and over 10,000 old municipal landfills (rubbish pits).
Cytec Statement of Basis and Permit Modification July 16, 2012 Public Hearing Ohio Environmental Protection Agency.
Chapter F.A.C. Updates F. Thomas Lubozynski, P.E. Waste Program Administrator.
1 Results Based Regulation Implications for Municipal Solid Waste Management Presented By: Blake E. Nesbitt Saskatchewan Ministry of Environment SUMA Convention.
 ideally the disposal methods should meet the following condition:  environment friendly  cause no health hazard  economically less demanding  maximum.
Company Overview of Charah Privately held company based in Louisville, Kentucky –Founded in 1987 Dedicated to providing the power industry the highest.
Your logo here WasteMINZ Mid-Year Roundup Wellington.
Development of Sanitary Landfill and Capping of Existing Dump site at Mysore
Landfills Geography 12 Kala Renard
The Process of Siting and Approving a New Landfill in Ontario
Permeable Heavy Use Area for Livestock Farms Presentation for Kitsap County DCD, September 28 th, 2006, Lab Test Findings and Calculated Storm Water Performance.
Introduction to Compliance Assistance Documents Part I.
MINING. Overview StepsDescriptionEnvironmental Effects MiningRemoving mineral resources from the ground Mine wastes – acids and toxins Displacement of.
Presented by: Jonathan Silvester Oliver Kiernan. Maxey Flat Site Located in Fleming County, Kentucky Low level Nuclear Disposal Facility o Isolate waste.
Jasmit Bains and Jamie Laukaitis.  East Midlands - centre of the ‘Industrial revolution’  FACT : PRIDE - P artnership to R egenerate through I nnovative.
Gwinnett County’s Post Development Stormwater Management Program
Rhode Island Department of Environmental Management
OPEN DUMPS Oldest and most common way of disposing solid waste
Colorado School of Mines Research Institute Site DRAFT REMEDIAL INVESTIGATION/FEASIBILITY STUDY AND PROPOSED PLAN.
G3 – Environmental Geomechanics (Dr Sam Yuen)
Fundamentals of River Restoration and Salmonid Fisheries OWEB, 1999, Fundamentals of River Restoration and Salmonid Fisheries OWEB, 1999, Fundamentals.
PIT MANAGEMENT Why? Technical Standards Branch CEA PRESENTATION Revised Feb14 Bruce Blue.
EnE 301: ENVIRONMENTAL ENGINEERING
Sanitary Engineering Lecture 11. Storm Water Runoff Storm water runoff is the precipitation which seeps into the ground if precipitation occurs faster.
Landfill. ESSENTIAL COMPONENTS 7 essential components are: (a) A liner system at the base and sides of the landfill which prevents migration.
20 – Operation and Maintenance 1/45 “There is no sensible reason to design and prepare for a better engineered landfill if it is not operated in a better.
Bottom Liner System The bottom liner prevents the trash from coming in contact with the outside soil, particularly the groundwater. In MSW landfills,
Matthew Udenenwu Waste Permits Division 2015 TCEQ Environmental Trade Fair.
MUNISPORT LANDFILL Vijay Kumar Rayabharapu. Munisport Landfill (Biscayne Landings) Landfill N N.E. 151st St., Biscayne Blvd ) Florida International University.
DAVIE LANDFILL Banu Sizirici. MAPS Vista View Park (Davie Landfill)
Environmental Toolbox. Technical Module Introduction.
Construction and Demolition Waste Management at UVM.
Cumberland Park CCB Project Virginia Department of Environmental Quality October 9, 2007.
Methods of Landfilling
Deanna Streifel Environmental Engineering Officer Arnprior Waste Disposal Site Annual Monitoring Results.
Intervention – 2004 Nanisivik Reclamation and Closure Plan Arctic Bay June 3-4, 2004 Nunavut Water Board Public Hearing.
SWANA - Saskatchewan Landfill Capital and Operational Costs By Steve Johnson M.Eng., P.Eng. November 2015.
Regulations and Best Practices January 2016
SWPPP: Stormwater Pollution Prevention Plan Creating/Implementing a Plan for Compliance.
A secure landfill is a carefully engineered depression in the ground into which wastes are put. The aim is to avoid any connection between the wastes.
Mandatory Requirements of Ecological Solid Waste Management Act (RA 9003) on CLOSURE AND REHABILITATION OF DUMPSITES.
Chapter 16 Landfill Liners and Geosynthetics
Design and Construction of Composite Lined Landfills
Landfills.
Chapter 17 Landfill Liners and Geosynthetics
Step 1 Many landfill sites are on old quarries of all kinds.
Fundamentals of River Restoration and Salmonid Fisheries OWEB, 1999, Fundamentals of River Restoration and Salmonid Fisheries Dylan Castle.
Christopher R. Bennett Darejan Kapanadze The World Bank
Unit V Disposal Syllabus Dumping of solid waste; sanitary landfills – Site selection, design and operation of sanitary landfills – Leachate collection.
Disposal of used lead batteries and accumulators
Numfon Eaktasang ,Ph.D Thammasat University
Landfilling in the Slovak Republic – legislation and actual situation
What is an on-lot sewage system?
4th Annual Construction Law Summit
17.7 Single Clay Liner and Single Geomembrane Liner Systems
MPCA’s priority Closed Landfills: WDE Landfill (Andover) and Freeway Landfill (Burnsville) July 18, 2018.
Scientific or Engineered Landfilling of Waste
Environmental Geotechnics
River Basin Management Flood protection
Landfilling (Containment and Restoration) in Ireland
Welcome To Our Presentation 1. Topic Name Transfer Stations and Transport, Ultimate Disposal Methods 2.
WASTE DISPOSAL No matter what processing is done, there will be some residue that needs to be disposed of safely Options for disposal Modern, engineered.
Solid and Hazardous Waste Chapter 21
Coal Waste Storage Area Pond Design/Build Project Stanton Energy Center Chip Merriam Chief Legislative & Regulatory Compliance Officer.
Closure and Post-Closure
Presentation transcript:

Upland Landfill Waste Discharge Application 7295 Gold River Highway Campbell River, British Columbia Upland Excavating Ltd. Engineering Consultant: GHD Limited

Presentation Agenda Project Background Site Plan and Environmental Controls Landfill Design Additional Information Developed Additional Investigations and Studies Updated Hydrogeologic and Hydrologic Characterization Conceptual Site Model

Background - Upland in the Community Upland Group is one of the largest and most diverse construction companies on Vancouver Island. Active member of the Campbell River community and economy since 1969. Upland Group strives to maintain a solid reputation for providing a professional work ethic with honest, trustworthy employees and management. Constantly looking for new, more efficient methods and equipment to meet the needs of the clients and community. Operations include: Gravel extraction, custom crushing, aggregate supply Highway, road, subdivision construction Logging road construction Spawning channel restoration Hydroelectric construction Pipe line and mining construction Land reclamation Concrete production Construction, demolition, and land clearing disposal Asphalt and concrete recycling .

Background - Project Overview Existing Permit PR‐10807 (June 2, 1992) Waste Discharge Application submitted May 27, 2016 to the MOE for an Operational Certificate Design and Operated as per Landfill Criteria for Municipal Solid Waste, Second Edition (June 2016) Landfill to receive only non-hazardous solid waste: Construction and demolition waste Land clearing debris Non-hazardous contaminated waste soil Material recovery/recycling: Clean wood Asphalt Concrete Steel Upgraded Landfill Approximate Site life: 20 years 500,000 cubic metres of capacity

Site Plan and Environmental Controls Lined Cells near Centre of Property Leachate Treatment System to East including: Aeration pond Contingent settling pond Infiltration pond Treated leachate quality will meet applicable Schedule 6 Drinking Water Standards Groundwater Monitoring locations are located throughout the Site Water quality at the property boundary will also meet applicable Schedule 6 Drinking Water Standards

Leachate Collection System and Base Liner The landfill will have a base liner system composed of (from bottom to top): Compacted native ground Geosynthetic clay liner HDPE geomembrane liner Non-woven geotextile Leachate collection pipes within a granular drainage blanket Woven geotextile The base of the landfill will be sloped to convey leachate to a single sump location for extraction and treatment

Landfill Final Contours Vegetated, Sand and Geosynthetic Clay Liner Cover 3H:1V Side Slopes 10H:1V Top Plateau Landfill Disconnected from Pit Walls Except on lined Southern Slope Surface Water Diversion Berm Constructed on top of excavation to prevent run-on from south of Landfill outside of aggregate pit Surface Water from Closed Landfill Conveyed to base of pit for infiltration

Additional Information Developed Compliance with June 2016 Landfill Criteria Landfill Criteria Compliance Checklist Increase Hydrogeologic and Hydrologic Characterization Four monitoring wells installed between Site and McIvor Lake A downgradient monitoring well installed Additional hydraulic monitoring completed Watershed divide refined with additional topographic survey data Test pits and survey to map near surface bedrock Include additional Monitoring Wells in Environmental Monitoring Plan Environmental Monitoring Program Updated Confirmation /Assessment of Applicable Water Quality Standards and Guidelines Registered Professional Biologist retained to assess presence of Aquatic Receptors

Additional Information Developed (Cont.) Financial Security Financial Security Plan Developed in accordance with Landfill Criteria Location and Volume of Existing Waste All non-recyclable waste to be relocated to lined landfill Existing location and approximate volume determined Provision of Leachate Level Monitoring Environmental Monitoring Program Updated Leachate level monitoring part of 2017 Design, Operation, Closure Plan Calculation of Permit Fees Permit fee for discharge of waste and treated leachate calculated for Stage 1

Additional Investigations and Studies 5 Additional Monitoring Wells Additional Groundwater and Surface Water Monitoring 9 Test Pits and Bedrock Outcrop Survey to Map Bedrock Ridge Hydraulic Monitoring to Confirmed Gradients Refined Location of Watershed Divide Updated Site Impact Assessment Aquatic Receptor Assessment Completed Assessed and Confirmed Applicable Water Quality Updated Conceptual Site Model

Bedrock Contours

Overburden Groundwater Contours

Regional Watersheds

Refined Watershed Divide

Conceptual Site Model (West to Southeast)

Conceptual Site Model (North-Southeast)