Target & Frontend Switch Yard & Collection Boxes Medicis Seminar, 2nd and 3rd March 2016 Stefano Marzari EN-STI & Vincent Barozier EN-ACE.

Slides:



Advertisements
Similar presentations
Engineering Department EN Cooling and Ventilation issues 1 FUTURE EXPLOITATION OF THE EAST AREA EN-CV Michel OBRECHT.
Advertisements

PSB extraction and transfer kickers 01/10/2014 LIU-PS ABT review1 L. Ducimetière, L. Sermeus.
MEDICIS : status, plans, interlocks and coactivity with ISOLDE ISOLDE ISCC 13 February 2015 Stefano Marzari EN-STI-RBS.
Technical studies for the HIE- ISOLDE Frontend upgrade Jacobo Montaño Marie Curie Fellow; CATHI Project * The research project has been supported by a.
HIE-ISOLDE Design Study and the CATHI Project Richard Catherall EN-STI ISOLDE Technical Coordinator HIE-EBIS Workshop 16 th -17 th October CERN.
Target conceptual design WP6, ESR9 CATHI Marie Curie Initial Training Network Cryogenics, Accelerators and Targets at HIE-ISOLDE Serena Cimmino – Stefano.
MedAustron Beam Intercepting Devices BID Workpackage Review 15 March R. Folch EN/STI - BID Workpackage Review - March 2012 Speakers: Ramon.
Beam Dump Upgrade Planning Keith Welch 2/5/13. Drivers for Upgrade Historical Problems – Hardware failures Helium system Windows, diffusers Dehumidifiers.
ISOLDE: Status report building th ISCC meeting CERN, 22 October 2013 Maria Borge, Erwin Siesling.
Target Mechanical R/D Magnetic Immersion Effects (Daresbury Experiment) Pass-Through/Seals (Vacuum, Water union)- leaks, survivability Thermal Loading.
LIU-ABT systems: SPS B.Balhan, J.Borburgh, H.Day 20 th November 2015.
ISOLDE Activities for LS2 Richard Catherall EN-STI ISOLDE Technical Coordinator.
BI.DIS10: Magnets & generators R. Rosol, L. Sermeus, T. Stadlbauer, TE-ABT LIU review, 20 November
R. Rosol, LIU-PSB review, 10 September BI.DIS Pulse generators R. Rosol, LIU-PSB review, 10 September Luc SERMEUS, Rodolphe ROSOL Laurent.
High Resolution Separator
CMS Pixels upgrade CO2 cooling transfer lines Draft spec – for introduction Paola Tropea & Hans Postema 5 December 2012.
Mid Term Review Meeting, 26 September 2012J. MONTAÑO1 * The research project has been supported by a Marie Curie Early Initial Training Network Fellowship.
CLIC Stabilisation Day’08 18 th March 2008 Thomas Zickler AT/MCS/MNC/tz 1 CLIC Quadrupoles Th. Zickler CERN.
HIE-ISOLDE Project: Planning & Resources Y. Kadi (EN-HDO) and the HIE-ISOLDE Project team.
Status of the Design Study Richard Catherall EN-STI-RBS.
REXTRAP plans for 2005 And future developments Pierre for the REX TEAM, REX’s day, 11/03/2005.
LIEBE: Design of a molten metal target based on a Pb-Bi loop at CERN-ISOLDE 6/25/2014 LIEBE project meeting1 T. De Melo Mendonca, M. Delonca, D. Houngbo,
18, 19, 20 February 2002 Power Converters for magnets (PBS 1.2.3) R. GENAND SL/PO 1 Power Converters for Magnets –Introduction –Specification Magnet characteristics.
Proton-Driven Plasma Wakefield Acceleration CERN Project Structure Edda Gschwendtner, CERN Lisbon Meeting, 22 June 2012Edda Gschwendtner, CERN2.
Towards the Work-package with LHCb for the LHCb upgrade DT-LHCb coordination meeting 13 January 2015.
An Integrated Remote Target Handling System for CERN’s MEDICIS Radioactive Isotope Production Facility Keith Kershaw, Stefano Marzari, Jean-Louis Grenard.
Long Pulse Klystron Modulators SML (Stacked Multi-Level) topology
LIEBE project Safety aspects of the Pb/Bi loop target LIEBE meeting report – WP5AP.Bernardes Thanks to : Richard Catherall/EN-STI, M.Delonca/EN/STI,
Two half-day seminars on the remaining work packages to complete the MEDICIS Facility POWER CONVERTERS FOR MEDICIS Davide Aguglia & Julien Parra-Lopez.
LIU-PSB Working Group meeting: 25/06/2015, Markus Zerlauth Consolidation of magnet interlocks in the PS complex – Warm magnet Interlock System (WIC) R.Mompo,
Cost and schedule for ELENA Beam Transfer Systems W. Bartmann, J. Borburgh, E. Carlier, L. Ducimetiere, T. Fowler, M. Hourican, R. Ostojic, L. Sermeus.
PSB extraction and transfer kickers LIU TE-ABT review, 20 November L. Sermeus.
LIU Critical Key activities in Long Shutdown 1 (2013) LIU-PSB: assuming LINAC4 connection in LS2 –Beam dump consolidation If not done: operation will be.
ELENA installation progress F. Butin / ELENA collaboration.
Electrial Safety LS2 days November 2016 AP
Update on the PSB Cooling and Ventilation Systems
Survey on “Chargés de Consignation” Status Update
I. Bergevoet - Training preparation
Linac4-PSB 160 MeV connection readiness review
MEDICIS Safety Alarms Systems
TE-EPC internal review of the ELENA project
PSB Lock Out Test, Follow-Up AP. Bernardes-/EN-STI, K
11 T Dipole Integration & Plans M. Karppinen
Francois and Lau EATM 17 July 2012
CSP 25th November 2010 Technical agreement number 3: overview
ISOLDE and n_TOF Consolidation
LIU – EVM status and next steps
AD consolidation activities in LS2
SPS cryogenic proximity equipment and SM18 validation
Teleconference ACS – FREIA 17th October 2017
BE/RF-IS Contribution to LIU C. Rossi and M. Paoluzzi
EN 4946 – Refurbishment of Electrical Substations
n_TOF “Draft” plans for YETS and LS2
TE-ABT Activities for LS2
PSB/PS/TT2/Linac2-3 YETS 2017–2018 & LS2 preparation meeting
Target and Horn status report
Teleconference ACS – FREIA 31st October 2017
SPS Planning for the EYETS Meeting 8 (07/12/2016)
Renovation of the 45-year old PS magnets
M. Calviani, A. Ferrari (EN/STI), P. Sala (INFN)
ISOLDE Front-End design review – Details of previous faults
YETS Dec 2017 – March 2018 LS Experiments requirements / Services (un)availability F.Butin / EN-EA EACM meetings outcome, thanks to all participants.
MEDICIS Facility Isotope Separator Controls and HMI
HIE-ISOLDE Project: Planning & Resources
Update on beam screen with shielding and other vacuum issues
Teleconference ACS – FREIA 19th June 2017
The HIE-ISOLDE Design Study and the CATHI Fellow Participation
WP13 outsourcing: Hollow Electron Lens
n_TOF Target #3 Production Readiness Review History of Target #3 options and baselining M. Calviani (EN-STI) n_TOF.
Richard Catherall EN-STI-RBS
Presentation transcript:

Target & Frontend Switch Yard & Collection Boxes Medicis Seminar, 2nd and 3rd March 2016 Stefano Marzari EN-STI & Vincent Barozier EN-ACE

Outline Introduction MEDICIS Target MEDICIS Frontend Switch Yard & Collection Boxes Beam line integration 3.3.2016 Stefano Marzari EN-STI & Vincent Barozier EN-ACE

Outline Introduction MEDICIS Target MEDICIS Frontend Switch Yard & Collection Boxes Beam line integration 3.3.2016 Stefano Marzari EN-STI & Vincent Barozier EN-ACE

Introduction MEDICIS beam line Work Packages : WP 8: Separator TE-MSC (R.Lopez) WP 9: Frontend EN-STI (S.Marzari) WP 10: Vacuum TE-VSC (J.Ferreira) WP 11: Target EN-STI (S.Marzari) WP 22: Instrumentation BE-BI (W.Andreazza) WP 23: Water cooling EN-CV (A.Broche) WP 21: Power TE-EPC (J.Parra-Lopez) WP 26: Switch yard EN-STI (M.Vagnoni & V.Barozier) WP 27: Collection Boxes 3.3.2016 Stefano Marzari EN-STI & Vincent Barozier EN-ACE

Introduction Location into the Bunker and the MEDICIS Lab : Target Power & HV Vacuum LV Power & Controls zoom Boris Tube Bunker Target Magnet Frontend Diagnostic & Switch yard & Collection Boxes Labo 3.3.2016 Stefano Marzari EN-STI & Vincent Barozier EN-ACE

Outline Introduction MEDICIS Target MEDICIS Frontend Switch Yard & Collection Boxes Beam line integration 3.3.2016 Stefano Marzari EN-STI & Vincent Barozier EN-ACE

MEDICIS Target Energy deposition = 212W (without cooling) Proton fluence during irradiation (pps/cm2) Energy deposition = 212W (without cooling) Isolde Target MEDICIS Target Dimensions change Isolde type ø20 x200 vs MEDICIS type ø50 x100 Acknowledgements: R.S.Augusto Fluka study 3.3.2016 Stefano Marzari EN-STI & Vincent Barozier EN-ACE

MEDICIS Target Main constraints: Compatibility with standard Isolde Target Bases Compatibility with standard Isolde ion sources Compatibility with the Power Supply Improve robustness for re-use Isolde standard target with ion source MK1 Isolde standard and compatible target Base 3.3.2016 Stefano Marzari EN-STI & Vincent Barozier EN-ACE

MEDICIS Target Already done: Fluka simulation Ansys thermal simulations Dummy container and thermal test under Ar low pressure and natural air convection Preliminary report EDMS 1403191 (M.Vagnoni) To be done: Real mechanical design of a Tantalum container Thermal Tests – optimization Ion source integration Ion production tests - optimization Final report Budget : 60 kCHF Manpower : 1.0 FTE (for experimented Mechanical Engineer) => Backup solution : in the starting phase we can use of a standard Isolde Target 3.3.2016 Stefano Marzari EN-STI & Vincent Barozier EN-ACE

Outline Introduction MEDICIS Target MEDICIS Frontend Switch Yard & Collection Boxes Beam line integration 3.3.2016 Stefano Marzari EN-STI & Vincent Barozier EN-ACE

MEDICIS Frontend Already done: We have two spare Frontends for Isolde => FE9 will be adapted for MEDICIS A provisional 120 kCHF will be used for upgrade Isolde Frontend LS2 Boris Tube 60 kV feedthrough on production EN-MME Insulator for Boris Tube FE8: ISOLDE spare 90% completed FE9 70% completed 3.3.2016 Stefano Marzari EN-STI & Vincent Barozier EN-ACE

MEDICIS Frontend Main modifications Enzel lens 3.3.2016 Stefano Marzari EN-STI & Vincent Barozier EN-ACE

MEDICIS Frontend To be done: Validate the mechanical design Purchase and mount pieces – collaboration with EN-MME (D.Aubert) Off-line tests Installation inside the MEDICIS bunker Commissioning Budget : 60 kCHF (modifications FE9) + 120 kCHF provisional for upgrade for Isolde + 15 kCHF Boris Tube = TOTAL 195 kCHF Manpower: 1.0 FTE (0.6 for experimented Mechanical Engineer + 0.4 for Technician EN-MME) Deadlines: final design May 2016 – purchase July 2016 – mounting Sept. 2016 – off-line tests October 2016 – installation & connection December 2016 3.3.2016 Stefano Marzari EN-STI & Vincent Barozier EN-ACE

Outline Introduction MEDICIS Target MEDICIS Frontend Switch Yard & Collection Boxes Beam line integration 3.3.2016 Stefano Marzari EN-STI & Vincent Barozier EN-ACE

Switch Yard & Collection Boxes Refurbishment of the KU Leuven switch yard 3.3.2016 Stefano Marzari EN-STI & Vincent Barozier EN-ACE

Switch Yard Budget : 120 kCHF Manpower: 1.0 FTE (0.6 for experimented Mechanical Engineer + 0.4 for Technician EN-MME) Deadlines: final design July 2016 – purchase October 2016 – mounting Dec. 2016 – off-line tests February 2017 – installation & commissioning April 2017 3 ways switch yard 3.3.2016 Stefano Marzari EN-STI & Vincent Barozier EN-ACE

Collection Boxes Conceptual design : EDMS 1549022 (A.Brown Manchester) 1.0 FTE with a fellow in Material budget required : 50 kCHF/Box Planning : 1 Box delivered by end 2016 (Lemer Pax, FR) 3.3.2016 Stefano Marzari EN-STI & Vincent Barozier EN-ACE