Friday Access in shadow of SPS interventions (RF, extraction septa power supply) Lead into problem on the cooling of the extraction septa in SPS Both beams.

Slides:



Advertisements
Similar presentations
LHC progress Thursday 30 th April 2015 Coordination: Mike Lamont, Wolfgang Hofle.
Advertisements

LHC 18 & 19 April 2015 At 450 GeV with bumps, no increased MUFO activity. Beam screen 15R8 warming up to 80 K, ongoing for the day 09:00: Orbit studies.
1 Analysis of MD on IR1 and IR5 aperture at 3.5 TeV – progress report C. Alabau Pons, R. Assmann, R. Bruce, M. Giovannozzi, G. Müller, S. Redaelli F. Schmidt,
RF de-bunching problem  The Beam Phase module measures the phase of each individual bunch and makes an average that is passed to the Low Level for updating.
The ATS MD part III (Achromatic Telescopic Squeezing scheme) Participants: Any (active) volunteers Goal: 1)MD1 (S. Fartoukh & R. Assmann  10h): “Pre-squeeze’’
* IP5 IP1 IP2 IP8 vertical crossing angle at IP8 R. Bruce, W. Herr, B. Holzer Acknowledgement: S. Fartoukh, M. Giovannozzi, S. Redaelli, J. Wenninger.
21/05/2012LHC 8:30 meeting Overview Week 20 Injectors, LHCb polarity, Beam-Beam Coordinators: Bernhard Holzer, Jan Uythoven.
External Review on LHC Machine Protection, CERN, Collimation of encountered losses D. Wollmann, R.W. Assmann, F. Burkart, R. Bruce, M. Cauchi,
Beam expected in the afternoon PM: – Establish first-turn – Establish closed orbit – Rough correction of machine parameters Evening: – RF capture Night:
LHC Studies Working Group – 03 July 2012 Beam Scraping and Diffusion + Asynchronous Dump MD G. Valentino, R. W. Assmann, F. Burkart, L. Lari, S. Redaelli,
Friday to Saturday 02:00: Machine closed. 09:00: Cryogenics all OK. Preparing pre-cycle. 10:00: Pre-cycle started. 11:30: Pre-cycle finished. 14:00: Beam.
Status from the collimator impedance MD in the LHC Collimation team:R. Assmann, R. Bruce, A. Rossi. Operation team:G.H. Hemelsoet, W. Venturini, V. Kain,
LHC progress Sunday 3rd May 2015 Coordination: Mike Lamont, Wolfgang Hofle.
LHC Fri 6 & Sat 7 Nov :00 End instabilities MD, dump to refresh air at dump TDE cavern 08:00 Access for vacuum team at the TDE starting 10:30 Access.
Cryo back at 17:30 Beam back at 19:00 IR2 aperture until ~03:00 Since then no beam from the SPS:  Connector problem on MKD  Connector eroded, needs to.
Progress with Beam Report to LMC, Machine Coordination W10: Mike Lamont – Ralph Assmann Thanks to other machine coordinators, EIC’s, operators,
Monday 19 th March 07:33 Lost (another) beam in the squeeze, beyond 2 m, B2 hits 1/3 resonance. 08:30 Start (another) ramp  Try to correct coupling and.
Aperture measurements during LHC commissioning 2017
Wednesday
Ralph Assmann, Giulia Papotti, Frank Zimmermann 25 August 2011
MD Planning Fri – Sat (26. – 27.8.)
Wednesday 8.9 External crossing angles:
ATS optics Results from MD3, MD4 and MD5
Saturday 21st April 00:33 Interlock during ramp on BLM HV
Monday :00 Stable beams 9_6_6_6 13:40 Access.
Β*-reach in 2017 R. Bruce, S. Redaelli, R. De Maria, M. Giovannozzi, A. Mereghetti, D. Mirarchi Acknowledgement: collimation and optics teams, BE/ABP,
LHC Emittance Measurements and Preservation
Thursday morning – optics correction
Machine availability reaching well over 80%
Tuesday TOTEM and transverse loss map (1) OK
Tuesday 23/11/10 8:00 Physics fill #1511 dumped
Alice solenoid – orbit distortion
Summary of Week 13 G. Arduini, B. Holzer
LHC commissioning Week 38
Status from the collimator impedance MD in the LHC
Saturday 2/4/ :00-09:00 Problems with SPS:
Week 36 plan Todo’s: And also: 12+b injection.
Tuesday 20 March 2012.
Monday February 28th 8h00: Injection
Friday 11/5 08:00 RF communication problem solved. Ready to inject but beam not available from the injectors. Injection line collimators opened from 4.5.
Planning at 5 o’clock meeting Friday
Friday morning 10:30 Optics measurements and corrections.
Thursday :00: Physics fill from the night shift
Yesterday morning Held 1647 for a while – SPS kicker problem
Friday 16/3 08:30 – 10:15 Access for QPS and EPC (BI in point 4)
Wednesday 09 March …:09:00: beta* measurement (1.5 m) by K-modulation and with AC-dipole excitation. 1/17/2019 LHC 8:30 meeting.
Global aperture measurements at 450 GeV with 170 mrad crossing angle
Friday 23rd March 08:00 Access
Summary Thursday h21: Stable beams fill #1303.
Summary of week 19 Machine Coordinators: G. Arduini, M. Lamont Main aim: Luminosity production.
Wednesday Ramp single nominal bunches for loss maps
Thursday Physics fill 1250 (with 13b) dumped at 10.30
Wednesday 10:00 test of the un-squeeze to 90 m at 4 TeV.
Thursday 04/11 - Morning Access until ~13:00 Pre-cycle Proton checks:
Saturday Nov Stop proton operation. Switch back to ions
Monday 8th December Morning used for RF work (IP z, injection), damper noise checks. Stable beams period with LHCb spectrometer OFF – lost beam after.
Saturday Wire scans at end of fill 1253 B1H : 4.2 B1V : 4.3 B2H : 5 B2V : 7.2 Beams dumped (after ~14h of collisions) Some issues during refill.
Friday 8/10/10 - Morning Planned to keep fill until the afternoon
Summary for LPC (March 7th, Ralph Assmann)
Plan for 1 m b* J. Uythoven & J. Wenninger
Saturday 12 March Morning: problem on RSD1.A12B2 – flow rate problem on the cooling water for the converter. 14:00: Loss map -500 Hz (positive energy offset)
Wednesday 23/2 Thanks CRYO!!!.
Thursday Aperture studies (foreseen until ~ midday, nothing done) Problems with single bunch B2 from SPS (extraction kicker not enabled) Setting.
Monday 26th September 7:30 Beam dump, QSP on RQX.R1, lost cryo in ITR1, 91 pb-1. Cryo recovery, needed about 1.5 h. Setting of TI2 collimators to 5 sigma.
LHC Morning Meeting - G. Arduini
Another Immortal Fill….
15/12/2009 Vacuum interlock in sector 78 understood  out-gassing of a Penning gauge ignited as a result of ionization or dust arcing In conclusion: NO.
Friday During the night from Thursday to Friday: by mistake, SPS longitudinal blow-up was not active  Smaller transverse emittance from the.
Daniel, Gianluca and Belen (for the Collimator team)
Saturday 29th October Friday during IP2 1 m squeeze test
Presentation transcript:

Friday Access in shadow of SPS interventions (RF, extraction septa power supply) Lead into problem on the cooling of the extraction septa in SPS Both beams back around 13:50 14:35 Start ramp no problem, scaling of bumps in ramp looked good Squeeze to 1.5 m in one go Both beams – no losses 475 s However still issues with orbit, coupling… 26-2-2011 LHC startup progress

Orbit: squeeze start minus end 26-2-2011 LHC startup progress

Coupling Xavier Buffet 26-2-2011 LHC startup progress

Aperture in IR8 26-2-2011 LHC startup progress

Collimation setup at injection 17:35 start, correct to reference orbit Problem with de-bunching with beam Called Philippe Baudrenghien 26-2-2011 LHC startup progress

26-2-2011 LHC startup progress

26-2-2011 LHC startup progress

Collimation summary Could only start at 19h18: roughly 4 hours. Beam conditions need improvement. Setup strongly affected by de-bunched beam, especially for beam1. At the end, 45% of intensity was un-bunched for beam1 and 30% for beam2. Large collimator setup errors at high dispersion points as a result. Completed: Beam1 => 6 collimators, several or all to be repeated Beam2 => 11 collimators, a few to be repeated. Before continuing tomorrow the problem of debunching should be addressed. 26-2-2011 LHC startup progress

Overnight – aperture measurements Stefano Redaelli, Gabriel Muller, Roderick Bruce Global measurement… First rough estimate of global aperture at injection (detailed analysis to follow): ----- 2011 ------- --------2010------ B1H Q6R2 ~12.0 sigma ~12.5 sigma Q6R2 B1V Q4L6 ~13.0 sigma ~13.5 sigma Q4L6 B2H Q5R6 ~12.5 sigma ~14.0 sigma Q5R6 B2V Q4R6 ~13.0 sigma ~13.0 sigma Q4R6 Must be reviewed by folding in beam loss per measurement. Seem to have higher BLM response (factor 1.5-3) at collimator compared to magnet (different result from last year) -> we can lose a sigma or so from this. . 26-2-2011 LHC startup progress

Consistent results compared to 2010. Same bottlenecks Consistent results compared to 2010. Same bottlenecks. Maybe some slight indication of aperture loss (0.5 - 2 sigma). To be analyzed in detail 26-2-2011 LHC startup progress

B2H with collimators open Q5R6 3.93e-4 TCPH 0.0 26-2-2011 LHC startup progress

B2H with TCPH at 12 sigma Q5R6 1.35e-4 TCPH 5.16e-4 26-2-2011 LHC startup progress

Local aperture Preliminary estimate: IR5 triplet L has aperture: 12 sigma + 4.4 mm Taking the beam size (1.3mm) the aperture is: 15.4 sigma Not bad. IR5 triplet R has aperture: 12.5 sigma + 5.7 mm Taking the beam size (1.3mm) the aperture is: 16.9 sigma Not bad at all. IR1 triplet R (B2-v) has aperture: 13.0 sigma + 2.5 mm Taking the beam size (1.25mm) the aperture is: 15.0 sigma IR1 triplet R (B1-v) has aperture: 13.0 sigma + 3.9 mm Taking the beam size (1.25mm) the aperture is: 16.1 sigma. 26-2-2011 LHC startup progress

Incoming 26-2-2011 LHC startup progress