Beam Energy & Intensity: One bunch during full cycle

Slides:



Advertisements
Similar presentations
Heat load due to e-cloud in the HL-LHC triplets G. Iadarola, G. Rumolo 19th HiLumi WP2 Task Leader Meeting - 18 October 2013 Many thanks to: H.Bartosik,
Advertisements

LHC 15 April :19: UFO event detected by on BLM 15.R8 and beam dump 8:46: P2 cold compressor trip and recovery during morning shift. Access given.
1 Analysis of MD on IR1 and IR5 aperture at 3.5 TeV – progress report C. Alabau Pons, R. Assmann, R. Bruce, M. Giovannozzi, G. Müller, S. Redaelli F. Schmidt,
MD#2 News & Plan Tue – Wed (19. – 20.6.) DayTimeMDEiCMP Tue06: GeV  4 TeV: Ramp for chromaticity - missed A 08:00Ramp down 10: GeV: Large.
Lot’s of time lost due to cryo problem in IR8. Major impact, therefore review of MD program… Start discussion here, please let us know your input. Will.
* IP5 IP1 IP2 IP8 vertical crossing angle at IP8 R. Bruce, W. Herr, B. Holzer Acknowledgement: S. Fartoukh, M. Giovannozzi, S. Redaelli, J. Wenninger.
Plan for start-up with beam Friday  19:00 Machine closed. Ramp for powering tests & pre-cycle  22:00 Pilots through nominal cycle up to collisions. Measure.
Friday to Saturday 02:00: Machine closed. 09:00: Cryogenics all OK. Preparing pre-cycle. 10:00: Pre-cycle started. 11:30: Pre-cycle finished. 14:00: Beam.
R. Assmann - LHCCWG Two Beam Operation R.W. Aßmann LHCCWG Acknowledgements to W. Herr, V. Previtali, A. Butterworth, P. Baudrenghien, J. Uythoven,
Tuesday 17 th April 04:00 Prepare second fill for v/d Meer scans. 06:22 Stable beams, v/d Meer scans for Alice and LHCb. 13:20 End v/d Meer scans.Dump.
BSRT CALIBRATION MD SUMMARY LSWG #6-15/09/2015 BSRT TEAM.
With a lot of help from Reine Versteegen, John Jowett, Richard Jacobson, Burkhard Schmidt, Gilda Scioli, Werner Herr CERN-LHC * IP5 IP1 IP8 Spectrometer.
Preparation Status of pp Run11 Haixin Huang Time Meeting 12/21/
MD Wed – Sat DayTimeMD Wed06:00UPS repair, ATS optics checks w/o beam 12:00Cycle, test ATS optics w/o beam 16: TeV: BPM offset determination for.
Beam-Beam head-on Limit J. Barranco, X. Buffat, T. Pieloni, C. Tambasco, J. Qiang, K. Ohmi, M. Crouch for the Beam-Beam team BI BSRT Team George and Enrico.
Β*-dependence on collimation R. Bruce, R.W. Assmann C. Alabau Pons, F. Burkart, M. Cauchi, D. Deboy, M. Giovannozzi, W. Herr, L. Lari, G. Muller, S. Redaelli,
Outline of 2014/2015 plans V. Kain, M. Lamont, J. Wenninger 6/18/2013Optics Measurement and Correction Review
Francesco Cerutti ENERGY DEPOSITION ASPECTS FOR LHCb REQUEST 5th Joint HiLumi LHC - LARP Annual Meeting Oct 29, 2015 through L.S. Esposito’s work and essential.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Francesco Cerutti, Andrea Tsinganis WP10 Energy deposition & R2E
Beam instrumentation MDs
MD Planning Fri – Sat (26. – 27.8.)
M.Fitterer, A.Patapenka, A.Valishev (FNAL)
1st LHC MD Period Started
LHC Commissioning with Beam
HL-LHC Aperture Update
LHC schedule.
The LHC - Status Is COLD Is almost fully commissioned
Wire, flat beams and beam-beam MDs in 2017
Optimization of Triplet Field Quality in Collision
Saturday 21st April 00:33 Interlock during ramp on BLM HV
Progress in Collimation study
Spectrometer Operation in IP2 & 8
Lecture 2 Live Feed – CERN Control Centre
LHC Emittance Measurements and Preservation
DEBRIS IMPACT IN THE TAS-TRIPLET-D1 REGION
WP3 meeting Aug 21, 2015 V1.1 RECAP Francesco Cerutti.
Saturday 09:40 Stable beams #1369 (56 bunch scheme)
Fill 1410 revisited Peak luminosity 1.4e32 Beam current 2.68/2.65 e13
Thursday 17th May 01:11 Fill #2633 dump in squeeze arc circulator load channel Ad1B 03:16 Fill #2644 Stable beams, lumi 5.2e33 cm-2s-1 04:38 Dumped by.
MD#4 Progress MD Coordinators: Giulia Papotti, Frank Zimmermann
J. Uythoven, W. Venturini Delsolaro, CERN, Geneva
Week 35 – Technical Stop and Restart
LHC (SSC) Byung Yunn CASA.
MD#2 News & Plan Tue – Wed (19. – 20.6.)
Friday morning 10:30 Optics measurements and corrections.
Optic design and performance evaluation for SPPC collimation systems
Yesterday morning Held 1647 for a while – SPS kicker problem
Collimation margins and *
Friday 23rd March 08:00 Access
Summary Thursday h21: Stable beams fill #1303.
Summary of week 19 Machine Coordinators: G. Arduini, M. Lamont Main aim: Luminosity production.
MD#2 News & Plan Tue – Wed (19. – 20.6.)
Thursday 04/11 - Morning Access until ~13:00 Pre-cycle Proton checks:
SLHC-PP kick-off meeting, CERN 9 April 2008
Lecture II.
Collective effects in the SPS and LHC (longitudinal plane)
Summary for LPC (March 7th, Ralph Assmann)
Friday 14th September 03:15 Beta* at 1 km. Optics measurements, see yesterday. 07:00 Dump. 08:00 Refill with 3 nominal bunches for high beta. 11:15 Beams.
Monday :15 fill 3523 dumped by BPMs IP6
Plan for 1 m b* J. Uythoven & J. Wenninger
Wednesday 23/2 Thanks CRYO!!!.
Saturday 06/11 Triplet R8 tripped during ramp for collision setup.
Another Immortal Fill….
HL-LHCV1.4 (BI) R. De Maria WP13 meeting 3/9/2018.
Thursday Morning/Afternoon
LHC beam orbit and collision position determination & control – performance and issues, prospects for Run 3 Orbit in collision - Luminosity WS - J. Wenninger.
LHC Machine Advisory Committee, CERN 12th June 2008
HL-LHCV1.4 (BI) R. De Maria WP13 meeting 3/9/2018.
Saturday 29th October Friday during IP2 1 m squeeze test
Presentation transcript:

MD 2733: Beam size measurements using quadrupolar BPM based on DOROS and collimator BPM Beam Energy & Intensity: One bunch during full cycle Beam conditions: ADT for blow-up Estimated time: 4h By A. Sounas, M. Gasior, T. Lefevre, M. Wendt, S . Redaelli and .. Goal: Test the possibility to measure beam size using collimator BPM (as quadrupolar pick-up) using two collimators (H and V) Position Scans (bumps/coll. offset scans) Centering Beam BPM characterization About 1.2 km of the present LHC ring will be modified during the LS3 shutdown, when the HL-LHC machine upgrade is scheduled to take place. New shielded Beam Screen for the low-beta􏰀 triplets stands at the center of the project. HiLumi-LHC (HL-LHC) machine upgrade has the additional feature of needing internal tungsten shields to reduce the amount of collision debris which is deflected by the high-gradient triplet magnets towards the superconducting magnets' cold masses and coils. Apperture Scans Abs. Beam Size measurement Blow-up / Ramp Rel. Beam Size measurement (no need for aperture scan, IP1 Q7 BPMs can be used)

MD 2733: Beam size measurements using quadrupolar BPM based on DOROS and collimator BPM Beam Energy & Intensity: One bunch during full cycle Beam conditions: ADT for blow-up Estimated time: 4h 1.1 Inject 1 nominal bunch 1.2 Beam bumps (H/V planes) at collimator points (Centering Beam) 1.3 Collimator aperture scan (Abs. Beam Size measurement ) 1.4 Blow-up beam emittance using ADT (Rel. Beam Size measurement) 1.5 Collimator aperture scan (Abs. Beam Size measurement) 2.1 Re-inject a fresh bunch 2.2 Beam bumps (H/V planes) at collimator point (Centering Beam) 2.3 Collimator aperture scan (Abs. Beam Size measurement) 2.4 Ramp (Rel. Beam Size measurement) 2.5 Collimator aperture scan (Abs. Beam Size measurement) 2.6 Perform Coll. Position Scans (BPM characterization) About 1.2 km of the present LHC ring will be modified during the LS3 shutdown, when the HL-LHC machine upgrade is scheduled to take place. New shielded Beam Screen for the low-beta􏰀 triplets stands at the center of the project. HiLumi-LHC (HL-LHC) machine upgrade has the additional feature of needing internal tungsten shields to reduce the amount of collision debris which is deflected by the high-gradient triplet magnets towards the superconducting magnets' cold masses and coils. *WS & BSRT measurements in 1.3-1.5 & 2.3-2.5 for cross-check