Monday 22.10. – Morning L. Drosdal: Injection line TI8: IQC threshold for BPM.87604.H from 2mm to 2.5mm to avoid unnecessary latches due to variations.

Slides:



Advertisements
Similar presentations
PROFIBUS controller problem (SEU) on cryo valve on DFBMH (600 A circuit RQ6.L7B1/2). Loss of cryo maintain ==> Beam dump. End of fill #1975 after ~2.5.
Advertisements

Tuesday 24 th July - morning 10:15 Operator dump of fill 2873  Initial luminosity: 5.83e33 cm-2s-1  12 hours stable beams  151 pb-1 delivered  Initial.
:00 meetingEBH 1  6:39 beam dump by BLM 655ms RS on BLMEI.05L4.B2E10_MBRB (which is downstream of BSRT B2).  The losses increased during.
Tuesday 7 th August - morning 07:10 Reinjection after loss of fill 2920 to UFO near ALICE  26 pb -1 in 1h16m; peak lumi 6.4e33 cm -2 s -1 08:10 dump at.
Wednesday :06 Dump fill 3533: interlock BPMS in IP6
Last 24 hours RQ4.L1 Lost going into collision Test ramp Storm
Machine Coordinators: G. Arduini, J. Wenninger
Friday 15th June 01:11 Injection.
Wednesday September 14th
Luminosity lifetime – fill 2932
Monday fill with 1092 bunches (6 h stable beams)
Last 24 hours RQ5.L1 RQ4.L1 RF trip Line4B LHC status.
Week 46 Week 46: Machine coordinators: Roger Bailey – Gianluigi Arduini Main aims of the week: Stable beams with ions Scheduled stop for ion source refill.
Summary week 41 (MD) Weekend of physics
Tue :25 Beams dumped due to RF vacuum interlock
Wednesday /Thursday 09-11:00 Verification of the LSS6 interlocked BPMs: took longer to fill due to some problems with RF cavities in the PS. In the mean.
LHC Morning Meeting - G. Arduini
Saturday 12:00 Fill 1992 in stable beams.
Coordination: G. Arduini, E.B. Holzer High beta* run: H. Burkhardt
LHC Morning Meeting - G. Arduini
Monday 6th August & night
Fri 29/7 – Sat 30/7 09:00 End of fill 1990, PC trip RCBXV3.R1 (likely SEU on QPS). Integrated Luminosity: 41 pb-1. Access for MKI2 main switch replacement.
LHC Morning Meeting - G. Arduini
Summary of week 22 Machine Coordinators: G. Arduini, M. Lamont Main aim: Luminosity production.
Wednesday Morning 8: :30 end of fill study - octupole polarity inversion (Elias, Tatiana, Alexey, Georges, …): Goal: study the effect of the.
Thursday 17th May 01:11 Fill #2633 dump in squeeze arc circulator load channel Ad1B 03:16 Fill #2644 Stable beams, lumi 5.2e33 cm-2s-1 04:38 Dumped by.
Wednesday 31 October: Morning
LHC Morning Meeting - G. Arduini
Friday 31st August & night
Wednesday 8th August & night
LHC Morning Meeting - G. Arduini
Friday Morning 3:44 – 15:04 stable beams Fill (dumped by operator)
Tuesday 28th September Fill 1375 ongoing 09:00 Move in Roman Pots
Chromaticity can make a difference…
04-05/08/2010 End of physics at ~11:00 after 18.5 hours ~120 nb-1.
Wire almost entirely through beam before BLM triggers dump
Not the most productive 24 hours on record
Friday Morning 7:30 injection for fill 2908
Wednesday 9:08 Fill 3214 dumped by OP after 5:26 hours in stable beams
(on behalf of the LHC team)
Thursday morning 7:20 – 12:30 faults of BLM sanity check, RQX.L8 QPS trip and iris scanner in UJ47. Access: Pt 8 for ELQA on RQX.L8 (The voltage.
Tuesday Access for RF & QPS (others in the shadow) until ~18:00.
Sunday/Monday & :30 Stable beams. Fill #1851.
Summary of week 19 Machine Coordinators: G. Arduini, M. Lamont Main aim: Luminosity production.
Monday – Morning Fill 3265 stable beams since 1:31
Rocky last 24 hours Losses Q6.R5 Orbit SIS TCDQ OK! Power converters
Thursday Fill 1364 (24 bunch) dumped at 07h
Tue/Wed 12/ :00 Probe beam back again
LHC Morning Meeting - G. Arduini
Thursday 26th July 13:21 Fill 2880 beam dumped
Thursday – Morning Energy matching at injection with H CODs
Monday 11th June 08:10 Beam dumped in the ramp by OP. OFB did not start its function and kept the injection orbit. 08:50 Switch LHCb polarity to negative.
Thursday 22 September 2011.
Saturday :42 stable beams fill 3541
Polarity inversion 07:00 ALICE solenoid and dipole polarity switched to positive External Crossing angle polarity unchanged at injection/ramp & squeeze.
LHC Morning Meeting - G. Arduini
Thu 04:00 Fill #2729 Stable Beams. Initial lumi 6.5e33 cm-2 s-1.
Sat 15/10 New record bunch population profiting of the scrubbing period on Friday. Nb~1.42x1011p/bunch  110 MJ at 3.5 TeV. Filling slowed down by ZS sparking.
Thursday
Coordination: Eva Barbara Holzer, Mike Lamont
Monday 10th December - morning
Monday 27th August & night
Wednesday 26 October 2011.
Wednesday morning / afternoon
Monday 14th May 00:03UFO at BLMQI.06R8.B2E10_MQML. Beam dump Re-steering required for TI2 03:28 STABLE BEAMS # e11 ppb, 4.11e33 cm-2s-1 13:36.
Friday :47 stable beams fill 3273
Saturday Luminosity production 1380 bunches
Saturday 26 November 2011.
Tuesday
Tuesday
Presentation transcript:

Monday 22.10. – Morning L. Drosdal: Injection line TI8: IQC threshold for BPM.87604.H from 2mm to 2.5mm to avoid unnecessary latches due to variations coming from the MKE. Losses and injection oscillations still fine. No latches for last fill 3208. Fill 3208: Injection: emittance ~1.5 um, bunch intensity ~1.68E11 ADT set to high band-width during: ramp, squeeze and collision beam process – standard band-width in stable beams BBQ B1 tune measurement and feed-back gated on sixth bunch of the first batch of six bunches with reduced damper gain on the first six bunches Chirp during ramp on B1

BBQ spectra B1 gated on 1 bunch (reduced ADT gain) BBQ spectra comparison before (red) and after (blue) changing ADT gains, gated on sixth bunch of the first batch of six bunches.

B1 tune measurement Tune measurement of B1 still jumping to 50 Hz line at the start of the ramp and towards the end of the ramp

Monday cont’d 13:30 stable beams Emittance at start of stable beams: ~2.65 um Bunch population start of stable beams: 1.57E11 Somewhat higher losses before stable beams, and somewhat higher emittance increase than previous fill 3207 Peak luminosity ATLAS and CMS: ~6.5E33 cm-2s-1 ALICE peak luminosity: ~8.3E30 cm-2s-1 Integrated lumi in 4h11’: ATLAS/CMS: ~74 pb-1

Monday Afternoon 17:41 beam dump: RD2.L5 tripped: QPS triggered a fast power abort S45 tripped and vacuum interlocks from L5, valves closing CS/CM in MSL5 lost Investigation: possibly a spurious signal on U_res_B1  reset cryo back 19:35 18:11 PC trips in S23 (CS/CM lost for AML3) The temperature sensors of one 600A current lead went in fault  Access: cryogenics access to tunnel UA27 for verification of a temperature sensor on DFBA DLCM chimney 15  electronics card replaced Also access for ATLAS 22:07 RQ8.L1 tripped 22:25 all accesses finished

ADT setting for the last fills Normal ADT High BW ADT (ramp till physics) High BW ADT (ramp till collision process) 3200, 3201 3203 3204 3207 3210 3208, 3209

From Gianluigi

Monday Night ADT gain of the first 6 bunches in ‘Prepare ramp’ and ‘Ramp’, B1, was lowered to 20/127 of gain for rest of the turn (5db lower than for previous fill 3208); Daniel, Wolfgang Fill 3209: Injected beam similar to previous fill: Injection: emittance ~1.5 um, bunch intensity ~1.67E11 ADT set to high band-width during: ramp, squeeze and collision beam process – standard band-width in stable beams BBQ B1 tune measurement and feed-back gated on sixth bunch of the first batch of six bunches with reduced damper gain on the first six bunches 01:22 Stable beams Peak luminosity ATLAS/CMS: ~7E33 cm-2s-1 Integrated lumi in 2h32’: ATLAS/CMS: ~52 pb-1 3:55 Beam dump: EDF power glitch triggered FMCM of RD1.LR1

Tuesday Morning Planning 5:00 injection again for fill 3210: B1H = 1.53, B1V = 1.41, B2H = 1.7, B2V = 1.73 Standard settings for ADT and BBQ 6:35 stable beams fill 3210 Luminosity >7.3E33 cm-2s-1 Planning Wednesday: 1000m beat* run Thursday: LHCb polarity change

Operational Developments Ongoing: Gated BBQ tune measurement and feed-back (currently B1 only) with reduced damper gain on first 6 bunches Broad-band ADT (fill 3208: ON during ramp. Squeeze and collision beam process – not during stable beams) Could reduce ADT gain for broadband damping by 40% (ramp till stable beams) to have same low frequency gain as before? Or use broad-band ADT only during squeeze and collision beam process Pending: Batch-by-batch longitudinal blowup at injection (Tuesday evening)

Access requests Access Monday morning: WorldFIP repeater card change in sector 81 (dump due to power converter communication fault) Access system PAD UJ43 (S. di Luca) ALICE: Nitrogen Alarm: leak not found. Decided with GLIMOS to monitor and this way try to find the leak location.  leak location found outside the cavern and fixed. Pending Accesses: LVDT TDI Pt2. Tunnel, 2 hours LBDS MKD-F-B1: check PC and generator. UA63 Radmon installation between Q5 and Q6 at IP1. 1 hour access, few hours pre-warning. Impact 21253 / D. Macina