Update on BISW EYETS activities

Slides:



Advertisements
Similar presentations
IEFC Workshop – 22/03/2011 JJ Gras on behalf of BE-BI 1.
Advertisements

WG on possible controls restructuring 1 Controls activities of the AB equipment groups A. Butterworth E. Carlier, R. Losito, A. Masi, JJ. Gras, Q. King.
BE-CO work for the TS Nov 8 Nov 11P.Charrue - BE/CO - LBOC1.
Industrial Control Engineering Industrial Controls in the Injectors: "You (will) know that they are here" Hervé Milcent On behalf of EN/ICE IEFC workshop.
BI SW for LINAC4 On behalf of BE/BI/SW BI software development process Specifications List of BI Systems – Not covered: PSB ring systems Conclusions Lars.
Guy Crockford AB/OP OP Days, 7/2/2007 LHC Specific BI Systems This presentation reviews the status of the specific BI systems for the LHC. The work plan.
Controls Renovation for AB-BI Outline: Reminder of AB-BI-SW mandate History of controls renovation Renovation work-packages (-> 2012) – Projects known.
CERN Accelerators Topology Configuration and Change Management Engineering Department Thomas Birtwistle, Samy Chemli – EN/MEF/DC.
BI-TB on BST Systems Introduction (L. Jensen) Hardware for SPS/LHC masters and receivers (old and new) (JJ. Savioz) Software for masters and receivers.
Nov, F. Di Maio, M.Vanden Eynden1 CO Proposal concerning AB Front-End Software Responsibilities First detailed proposal based on the global Front-end.
K.Hanke – PS/SPS Days – 19/01/06 K.Hanke - PS/SPS Days 19/01/06 Recommissioning Linac2/PSB/ISOLDE from CCC  remote operation from CCC  upgrades & changes.
Beam Instruments PSB + Transfer Lines B. Mikulec, J-F. Comblin.
Overview Consolidation projects for PS LIU-PS Main observable review Conclusion Acknowledgements S. Gilardoni R. Steerenberg G. Metral H. Damerau BI colleagues.
BCT’s for beam protection L. Søby On behalf of D. Belohrad, L. Jensen and P. Odier 6/12/15Internal workshop ON MPP readiness for MJ beams 1.
Last night Lhc closed 15:00 Beam on Ti 8 /Ti2 Prepulse check synchronisation ok with LHCb /RF 17:00 Open Point 4 PC’s and RF 19:00 LBDS energy tracking.
Post Mortem Workshop Session 4 Data Providers, Volume and Type of Analysis Beam Instrumentation Stéphane Bart Pedersen January 2007.
22/09/05CO Review: FESA IssuesJJ Gras [AB-BDI-SW] 1/18 AB-CO Review FESA  The Functionality  The Tools  The Documentation  The Support  Maintenance.
LIU-SPS action list for BE/BI L. Jensen with input from BL, PI, QP, PM 27/08/2015Lars K. Jensen BE/BI/SW1.
LIU-SPS progress for BE/BI L. Jensen on behalf of BE/BI 27/08/2015Lars K. Jensen BE/BI/SW1.
E. Hatziangeli – LHC Beam Commissioning meeting - 3 rd March 2009.
Software tools for digital LLRF system integration at CERN 04/11/2015 LLRF15, Software tools2 Andy Butterworth Tom Levens, Andrey Pashnin, Anthony Rey.
CS section activities Industrial controls Luca Arnaudon David Glenat David Landre Slawomir Totos Ruben Lorenzo-Ortega Digital hardware John Molendijk.
MPE Workshop 14/12/2010 Post Mortem Project Status and Plans Arkadiusz Gorzawski (on behalf of the PMA team)
Radio Frequency Andy Butterworth AB/RF Accelerator Controls Renovation WS 3 Dec 2008.
AWAKE p+ beam line HWC C. Bracco, J. Schmidt Acknowledgment: MCS, EPC, MPE, SPS-OP, BI, ABP (survey),STI, EA, ACE, RP.
LS1 Review BE-CO-SRC Section Contributions from: A.Radeva, J.C Bau, J.Betz, S.Deghaye, A.Dworak, F.Hoguin, S.Jensen, I.Koszar, J.Lauener, F.Locci, W.Sliwinski,
PS Complex Controls Renovation S Baird AB/ABP ATC/ABOC Days: Session Jan 2008.
PS Orbit Second year of TMS Operation Stéphane Bart Pedersen BE-BI-SW July BE-BI-SW July 2013.
V4.
SPS Applications Software issues - startup in 2006 and legacy problems
Beam Wire Scanner (BWS) serial link requirements and architecture
RF acceleration and transverse damper systems
ABT-EC EYETS Activities 2nd reports
A monitoring system for the beam-based feedbacks in the LHC
ICE SECTION The coolest place to be! Elias Métral
LBDS TSU & AS-I failure report (Sept. 2016)
Controls & software Andy Butterworth.
Supporting Windows 8.1 Krystle Portocarrero | Training Experts Inc.
J.-L. Sanchez Alvarez(PSB-EIC)
PS status 10 August – 17 August 2017
(short status report on everything)
Wednesday 3rd October - morning
Status of Interlock BPM
ATF/ATF2 Control System
SLS Timing Master Timo Korhonen, PSI.
Injectors BLM system: PS Ring installation at EYETS
Transfer line test: Beam stability measurements
LHC Beam Dumping System Reliability Run Summary
EC Activities Status for the LIU
Instrumentation for SPS 2006 restart
BE-BI Software for LINAC4
Status of the BI Work Package in the LIU-PSB frame
J. Uythoven for the MPE-MI & MS Teams
PS wire scanner failures
Mike Lamont on behalf of the LSA team
LEIR & ITE BPMs COMMISSIONING STEPS.
Injectors BLM system: PS and PSB Ring installations at EYETS
CSNS Accelerator Control and Beam Instrumentation JIN Dapeng, XU Taoguang … June 9, 2015
Thursday morning – optics correction
Fill-pattern Control System for KEKB
Transverse emittance measurements
A Virtual Implementation of VELA (CLARA)
High Level applications development status
LHC BLM Software audit June 2008.
Linac Diagnostics Commissioning Experience
TUFMAN – Developments and future plans
Thu :00 Dumped beams, refill for Pb-Pb physics. No more protons in 2011… Some changes: Increase of flat top total voltage to 14 MV. Feed-forward.
LIU BWS Firmware status
LIU Wirescanners software
SPS Injection BIS - Draft requirements
Presentation transcript:

Update on BISW EYETS activities BI Technical Board 9/2/2017

Agile for TS Activity Tracking Emphasis on information exchange – not control! Create high-level JIRA issues for each task (if not already existing) E.g. Port class ABC from FESA2->FESA3 Add specific watchers & allow comments from other sections Add labels to gather statistics Sprint created for each TS Assign the issues to the sprint Use Scrum board to move change status of issues ToDo->InProgress->Done Once the TS is finished, unfinished issues stay in backlog And can be assigned to the next TS for example

Link to Board https://issues.cern.ch/secure/RapidBoard.jspa?rapidView=239

Summary LHC Upgrade BCTDCLHC to L866 Upgrade BPMITLHC to L866 Change BQBBQLHC installation Update BSRTSLHC class for new digital camera Upgrade BPMLHC and BPMDLHC to L866 Migrate BWSLHC to FESA3 while separating FECs for B1/B2 Migrate BSTLHC to FESA3 Migrate BTVDD to FESA3 Migrate BOBR instances to FESA3/L866 Create new class BOWC for TCTW Wire Control Upgrade BLDMLHC to FESA3/L866 Eradicate BCTFRLHC class based on DAB64x module (replace with VFC) LHC Schottly BOBR replacement server LHC Schottly Signal generator control server LHC BCTFVFC in the dump lines LHC BCTFVFC in the ring LHC BSRALHC minor modifications + logging interface

Summary SPS, LEIR & LN4 SPS Migrate BLMI to FESA3 Migrate BFCTSR to FESA3 / L866 and VFC Move SPS IN-OUT devices to FESA3 BPMI firmware and lib upgrade LEIR Deploy BPMLE FESA3 version (find correct fw config)   LN4 Migrate BOSEMCTRL and BOPLCIO to FESA3 BPML4 update TOF calculation for Linac4 and PSB injection BPMs

Summary PS, PSB, EA, ADE, ELENA Migrate PS complex SEM-grid servers to FESA3 Migrate BPMOPS server to FESA3 PS 1000 Turns to be operational PSB New Orbit acquisition system in the PSB EA Migrate EA servers to FESA3 ADE / ELENA Create a new BQSB instance for ELENA using latest FESA3 deployment Elena scraper Improve BPM class and make changes compatible with Hw changes

Summary Others New FESA class to control ISEG VDS 4 New control software for the Isolde scanners (BSISO) HIE Isolde Beam Diagnostic Boxes (Motors + Faraday Cup + Slit scans) BTVI, horizontal image mirroring HIE Time of Flight (HREXTOF) HIE Digitizer (HREXDIGI) Migrate BQSB to FESA3 (Deploy in PSB, PS, ADE, SPS)

Notable Changes 1/2 Moving to 64 bit O/S of critical systems BPMLHC, BPMDLHC, BCTDCLHC Don’t expect any problems BPMITLHC (LHC interlock BPMs) XPOC average 1024 turns -> bunch-by-bunch measurements over last 147 turns Triggered by issue in existing firmware Gives Nicolas Magnin more flexibility in post-analysis BTVDD – FESA 3 migration Careful handing of porting to not break XPOC interface and disturb ABP

Notable Changes 2/2 BSRTSLHC Renaming & moving BQBBQLHC devices Connected to interlock Renaming & moving BQBBQLHC devices Awaiting ECR Need to analyse impact on LHC sequencer and feedback service unit Feedback Service Unit An epic of 12 separate issues Eradication of BPMLHCConc New FGC3/FGCLite devices Switch on RefOpticsMagic (real-time RM recomputation) … Need careful testing at startup

Summary BISW will try to organize TS planning using JIRA tools First attempt to organize like this came late so is very rough Focus is on keeping as light as possible Others from outside BISW can use the dedicated JIRA issues to update / communicate information Most EYETS tasks are well underway Some will start progress in coming days / weeks E.g. BWSLHC Many in-progress issues are almost done Interesting note 24 BISW entries on Smooth Upgrades Wiki versus 41 in our sprint! When developers have control in JIRA they can maintain the list better