Plans for the construction of the new membrane cryostat in bldg 182

Slides:



Advertisements
Similar presentations
AutoPOL Unfolder for Windows
Advertisements

Weather…So What?. Group Work- 3 People Per Group Materials: –1 piece of paper, divided into 4 sections Directions: –In the sections, write down words.
ATLAS End-Cap C Proposed Transport Box P Cooke 15 June 2005.
The WA105 17m3 LArCryostat pre-experience M.Ne. Status Tender done for the membrane part, 1 German firm selected A lot of time wasted to renegotiate the.
Objective : To understand the fabrication, design, installation welding, inspection and testing for new construction in oil and gas industry After followed.
APPENDIX A (RFI) FOR THE FABRICATION OF MULTIPLE STEEL REACTION STRUCTURES FOR NASA-MSFC STRUCTURAL TESTING Mike Roberts 12/2/09.
Connecting to industry. Swivels Dixon Valve & Coupling Company manufactures Swivel Joints that are intended for piping applications. Be sure to contact.
TRANSPORT of ICARUS from LNGS to CERN Alberto Scaramelli INFN-Milano Following the meeting at LNGS on 11-12/9 Last News 102/10/2014A. Scaramelli.
PPMCCPPMCCPPMCCPPMCC. Problem Plan Measure Calculate Conclude PPMCCPPMCCPPMCCPPMCC.
TRANSPORT of ICARUS from LNGS to CERN Alberto Scaramelli INFN-Milano Following the meeting at LNGS on 11-12/9 118/09/2014A. Scaramelli.
19 May 1999 LAr WeekM. Lefebvre Endcap Signal Feedthrough Steel Order –Order fully coordinated with BNL –The order was ready to go Monday May 10th to lowest.
Arnaud Vande Craen (TE-MSC) 27/02/20131 EUCARD : ESAC Review – CEA Saclay.
DHCAL m3 module Ciemat status Enrique Calvo Alamillo EVO meeting 1 July 2010.
Some naïf ideas on cryostats , BNL-LBNF meeting D.Mladenov, M.Nessi.
WA104 Aluminum Cold Vessels A possible scenario. CAVEAT Definition of the experimental layout still under discussion within the ICARUS Collaboration (dimensions.
Multiview Drawings. Multiview Drawing A multiview drawing is one that shows two or more two-dimensional views of a three- dimensional object. Multiview.
Mechanical Designs of The Central Detector Jinyu Fu
Frame Overview A36 Steel square tubing and plate Frame will rest on four wheels or two air skids 90” Long, 30” wide- outside CG envelope Two carts for.
CMS Pixels upgrade CO2 cooling transfer lines Draft spec – for introduction Paola Tropea & Hans Postema 5 December 2012.
LAr Week Feb 2000 M. Lefebvre Milestones and Schedule General Production Readiness Review  Passed in Jan 99 Leak Test Station and Electric Test.
Lavs Issues Lav 12. Tube Planning future activities. Conclusions.
CEA DSM Irfu WP 7.4 : Insert design and construction M. Devaux J-M Rey, M. Durante, P. Tixador, C. Pes 18/09/2012HFM collaboration meeting WP 7 - Milano.
Concept Design for LBNF Far detector (LAr single phase)
Material for Crab cavities ordered and foreseen S. Langeslag & P. Freijedo Menendez Material summarized in
Long-Baseline Neutrino Facility LBNF Cryostats Systems Requirements on FSCF Marzio Nessi LBNF/DUNE DOE/SC CD-3a Director’s Review October 27-29, 2015.
Dual-Phase ProtoDUNE Detector Installation : Plans & Constraints Adamo Gendotti.
Status of report on chapter 6: Warm cryostat mechanical calculation PH-DT Engineering Office, CERN Page 1 CERN, May 20th 2015.
Warm cryostat mechanical calculations A.Catinaccio PH-DT Engineering Office, CERN Page 1 CERN, May 27th 2015.
Date of download: 6/21/2016 Copyright © ASME. All rights reserved. From: Seismic Design of a Double Deck Floating Roof Type Used for Liquid Storage Tanks.
Geometry 7-R Unit 7 Area Review Problems
The DUNE 35ton Prototype at Fermilab. DUNE FD ND 1300 km We have learned much about neutrinos in the last 70 years, but there is still much we don’t understand.
Installation of the T600 at Fermilab Fermilab, February 15,
EuCARD-WP7-HFM meeting 15 November 2011 Status of construction of FRESCA2 dummy coil assembly Attilio Milanese, Juan Carlos Perez.
3x1x1 m 3 Anode deck Suspension system WA105 meeting - 21 st of January, 2015 B. Aimard, G. Balik, L. Brunetti, G. Deleglise, D. Duchesneau, N. Geffroy.
SBND Cryostat Requirements David Montanari, Michael Geynisman, Dimitar Mladenov, Joe Howell 14 October 2015.
European cryogenic days Membrane cryostats for large volume neutrino detectors June 9 th, GENEVA.
Structural aspects related to the vacuum vessel of the SHIP Project
TOPIC 3: DESIGN AND ANALYSIS OF SHALLOW FOUNDATION
The LBNF cryostats Marzio Nessi, CERN 16 March 2017.
Installation of the T600 at Fermilab
Objectives of Design of Reinforced Concrete Elements
LBNF CAD models, Drawings and Component list
Structural drawing.
Ti/SS transitions A.Basti INFN-PISA*
HFM Test Station Main Cryostat
Crab Cavity HOM Coupler Specification Drawings & Tolerances
The Layers of the Earth!.
Status of design and production of LEP connection cryostat
A. Vande Craen, C. Eymin, M. Moretti, D. Ramos CERN
CLIC Common RF-girder study
Swivels. Swivels Dixon Valve & Coupling Company manufactures Swivel Joints that are intended for piping applications . Be sure to contact Dixon prior.
Unit 3 Parallel and Perpendicular Lines Review Problems
Cryostat design Mechanical design: Thermal screens: Specifications:
Furniture Liquidators -
EHN1 Neutrino Installation Plans
CENF - LBNF cryostat Relevant safety codes
SiD Engineering Status Report
Magnetic level switch BY Aqua Logistic Pte Ltd aqualogistics.com.sg.
Container Transport Services Container Transport
The Layers of the Earth!.
FRESCA Cryostats Outer cryostat during pressure test at the manufacturer Top plate and lambda plate for the outer cryostat Inner cryostat during reception.
The Layers of the Earth!.
The Layers of the Earth!.
Your vision, our target.
AutoPOL Unfolder for Windows Extended unfolding capability for SolidWorks.
Surface Area Cylinders
Neutron guide Shielding Concept
Measurement.
Practice Geometry Practice
Year 1 – Yearly Overview Autumn Spring Summer Week 1 Week 2 Week 3
Presentation transcript:

Plans for the construction of the new membrane cryostat in bldg 182

The Layout The Liquid Argon Tank for the WA105 experiment at CERN will be placed and operated in the CERN building 182 Cl. Room

The outer structure Overview Steel profiles (IPE240) bolted and welded together Internal dimensions: 6.5m x 4.2m x 4.1m (L x W x H) Weight: 18T

FEM Analysis Stresses Deformations Self weight: 18T Cap weight: 4T LAr weight: 25T Insulation: 7T Over pressure: 50 mBar Stresses Deformations Geometry

Transportation Divided in 18 pieces: Weight: 1 – 1.5 T each Sizes: 4.5m x 2.5m Standard trucks: Probably two 10T each 2m height each

Production Manufacturing Drawings - ready Companies - contacted Answers – this week