Wednesday 4.4.2012.

Slides:



Advertisements
Similar presentations
ION COMMISSIONING REVISITED 1 Thanks to: John Jowett, Walter Venturini. Matteo Solfaroli.
Advertisements

09:25 Operator dump fill #2178, integrated lumi 107/108/18 nb-1. Trip of RQ4.R6 (fire heaters discharged) just after the beam dump but the QPS gave no.
:00 meetingEBH 11 Saturday :00 meetingEBH 2  7:58 Fill 2483 (264 bunches) dumped by reference orbit set to zero in.
Cryo back at 17:30 Beam back at 19:00 IR2 aperture until ~03:00 Since then no beam from the SPS:  Connector problem on MKD  Connector eroded, needs to.
Tue 23/8 – Wed 24/8 09:00 Start 90 m optics run – Preparation and verification of the collimation functions – Re-generation of functions for Transverse.
Saturday Coordinators weekend: Mike Lamont, Eva Barbara Holzer
Wednesday :06 Dump fill 3533: interlock BPMS in IP6
Saturday 24 March 2012.
Wednesday 21 March 2012.
Friday 07:00 Power glitch on the EDF network. Point 8 affected.
Monday fill with 1092 bunches (6 h stable beams)
LHC Progress Week 6 Coordination: G. Arduini, E.B. Holzer
Week 46 Week 46: Machine coordinators: Roger Bailey – Gianluigi Arduini Main aims of the week: Stable beams with ions Scheduled stop for ion source refill.
Fill 1410 revisited Peak luminosity 1.4e32 Beam current 2.68/2.65 e13
Tue :25 Beams dumped due to RF vacuum interlock
LHC Morning Meeting - G. Arduini
Monday 6th August & night
Tuesday TOTEM and transverse loss map (1) OK
Summary of Week 11: 14 – 21 March
LHC Morning Meeting - G. Arduini
Wednesday Morning 8: :30 end of fill study - octupole polarity inversion (Elias, Tatiana, Alexey, Georges, …): Goal: study the effect of the.
Thursday 17th May 01:11 Fill #2633 dump in squeeze arc circulator load channel Ad1B 03:16 Fill #2644 Stable beams, lumi 5.2e33 cm-2s-1 04:38 Dumped by.
Wednesday 31 October: Morning
LHC commissioning Week 38
Summary of Week 16 G. Arduini, J. Wenninger
Lost at 12:05 to power converter (RTQX2.R1) problem
Mon 22/8 – Tue 23/8 00:07 stable beams #2040. Initial luminosities: 2.1x1033 cm-2s-1 18:00 Programmed dump. End of physics #2040. ~83 pb-1 in ~18 hours.
LHC Morning Meeting - G. Arduini
Mike Lamont, Jorg Wenninger
Wednesday 8th August & night
Friday Morning 3:44 – 15:04 stable beams Fill (dumped by operator)
Week 35 – Technical Stop and Restart
Summary of Week 26 Main aims: G. Arduini, B. Holzer, M. Lamont
04-05/08/2010 End of physics at ~11:00 after 18.5 hours ~120 nb-1.
Planning at 5 o’clock meeting Friday
Friday morning 10:30 Optics measurements and corrections.
Yesterday morning Held 1647 for a while – SPS kicker problem
Sunday
BI cont. *** Summary Matching Monitor test *** We only had ~15minutes of inject and dump, but managed to see a profile with ~9e9 p (!)
Saturday 7th May Sat – Sun night
Friday 23rd March 08:00 Access
Summary Thursday h21: Stable beams fill #1303.
Summary of week 19 Machine Coordinators: G. Arduini, M. Lamont Main aim: Luminosity production.
Wednesday Ramp single nominal bunches for loss maps
Aims for the week Recover from technical stop and precycle at 10A/s
Monday 24 October hours of 25ns MD
Thu 6/4 End of fill #2470. ~1 pb-1 in 4 hours. Dumped by CMS BCM.
Thursday 26th July 13:21 Fill 2880 beam dumped
Monday morning 09:40 Dump fill 2838, integrated ~130 pb-1.
Thursday 22 September 2011.
Saturday :42 stable beams fill 3541
Monday :15 fill 3523 dumped by BPMs IP6
Monday Fill 1803 into stable beams at 9:30. Dump at 19:45.
LHC Morning Meeting - G. Arduini
LHC - Week 38 Technical stop: Katy Foraz
Sat 18/3 - Ramp to 4 TeV Again glitch on the safe beam flag for beam 2. Cause identified: noise on BCT2B giving values above the safe beam limit (2.4×1010.
Thu 04:00 Fill #2729 Stable Beams. Initial lumi 6.5e33 cm-2 s-1.
Wednesday 23/2 Thanks CRYO!!!.
Thursday
Mon 2/4 08:00-13:00: Access for: Experiments Power converters BBQ
Saturday 06/11 Triplet R8 tripped during ramp for collision setup.
Coordination: Eva Barbara Holzer, Mike Lamont
Monday 26th September 7:30 Beam dump, QSP on RQX.R1, lost cryo in ITR1, 91 pb-1. Cryo recovery, needed about 1.5 h. Setting of TI2 collimators to 5 sigma.
Tuesday – Morning and Evening
Another Immortal Fill….
Saturday 28th 08:17 Fill #1812: Stable beams, peak luminosity ~1.1x1033 cm-2s-1 19:00 Go to adjust for RF-checks; Record fill lumi of 31.7 pb-1 for CMS.
Wed 12/10 09:30 – 10:30 Ramp down of ALICE solenoid to 50% nominal field on request of ALICE. Increase of the vacuum (e-cloud in this area that has not.
Saturday 26 November 2011.
Tuesday
Saturday 29th October Friday during IP2 1 m squeeze test
Presentation transcript:

Wednesday 4.4.2012

Wednesday 08:30 Access to reset QPS card of Q4.R8 10:30-11:40 No beam from the injectors due to unplanned intervention on RAMSES software and SPS extraction septum problem (beam 2) Ramp-Squeeze for chromaticity measurement and verification of the beta* and energy limits of the collimators 12:34 Dumped by wrong setting of the energy interlock on the TCT position at IP8 during the squeeze.  setting corrected Ramp with new parameters for decay and snap-back correction (FIDEL) and aperture checks with squeezed optics Problems with FIDEL parameters, losses beginning of the ramp Revert back to previous FIDEL correction version (not fully successful, chroma drifting at injection) 14:28 dumped by spurious trigger of the BLMs in point 2 16:00 dumped by spurious trigger of CMS BCM  disabled faulty card from BIS (has to be reconnected before the 48b fill)

Wednesday cont. 16:30-21:30: Aperture verification at the end of squeeze and in collision. Aperture sufficient to run with 60 cm optics. 21:44 dumped LHCb could not test moving Velo in "beam dump". The configuration was not standard and the override did not work. Beams dumped by CMS BCM (switched off power supply) 23:00 Injecting chroma drifting problems with H tune measurement and feed-back 0:38 – 2:04 Stable Beams 3b 3:30 – 4:00 no beam from SPS 5:40 Stable Beams 47 bunches, Atlas low pile-up, Alice main-satelite 11 indivs 8-9E10 ppb 3 trains of 12 nominal bunches Dump foreseen for 9:00

Result of corrected chromaticity Chromaticity correction during the ramp very good. Can be further improved at flat-top.

Summary of aperture checks (GA, SR, MP, JW) Checked the aperture with squeezed beams to verify the margins between TCTs and triplet apertures in IP1/5 Ramped and squeezed one nominal bunch and 4 probes to establish a good orbit reference and then blowed away the nominal bunch with the ADT, in order to perform aperture check with safe single-bunch intensities Opened collimators, opened TCTs, performed H and V loss maps with ADT blow-up  verify that TCTs (at 10.5-11 sigma) are still shadowing the triplet aperture (TCT nominal position with squeezed beams is 9 sigma) Results: Squeeze, separated: TCTs at 11 sigma shadow the triplett aperture Squeeze, colliding: 11 sigma for B1-H, B1-V and B2-H and 10.5 sigma for B2-V (B2-V losses at the MQX-R1 at 11 sigma). These margins are sufficient for operation at 60 cm Note that in some cases, we had to open the TCT collimators in IP2 and IP8 even if they were at >12sigmas. We believe that they were intercepting secondary halo but this has to be confirmed by more detailed analysis.

Example Loss map with TCTs at 11 sigma

Collimator limits versus beta* verified Example of collimator movement and position limits during ramp and squeeze

First stable beams 2012 (0:38 – 2:04), 3 bunches

CMS event recorded at sqrt(s)=8 TeV

Stable beams (5:40) 47 bunches Atlas: low pile up Alice main-satelit collisions

Vacuum activity IP8, injecting 144 bunches (Tuesday) M. Barnes: Vacuum spike at MIK of up to 7e-9 mbar not correlated with injection of B1 nor B2 The MKI8D vacuum is VGPB.138.5R8.R: it reaches a peak of ~7e-9mbar. However the gauges VGPB.98.5R8.R and VGPB.176.5R8.R (right of MKI8D) show very large excursions at 21:00hrs (greater than 4e-8mbar). Thus I believe that the vacuum spike originated on the Q5 side of MKI8D. MKI8 ecloud coils were on (VIESA.193.5R8.C) at 21:00hrs, the ecloud coils VIESA.3.6R8.C were off.

Others Logbook does not show all entries (automatic messages missing) Problem with Lumi optimization for Atlas: Witold: “The default DIP publication should be moved to BCM_OR (lumi-scan 6). Right now it points to LUCID with is saturated for this kind of beams” Optimize-all never worked on IP1, not even on BRAN signal which looks fine on OP displays; Inst lumi IP1 and 5 quite different, probably some recalibration needed ATLAS sees the BPM reading flickering for BPMSW.1R1.B1, should be fixed before the vdM scan Chroma at injection Horizontal tune measurements and feed-back (need to increase chirp?) Undulator RU.L4 was reset CMS BCM status?

Planning

Planning Friday till Monday the morning meeting will be at 9:00 Tuesday 8:30 summary of the week WED N 8 STABLE beams with 48 bunches and low-pile-up for ATLAS THU M A STABLE beams with 84 bunches ADT set-up 1.4E11 FRI STABLE beams with 84 bunches (LHCb field off)

Max number of bunches injected Alice 3 1 Main-main 48 12 Intensity ramp-up 2-3 fills and 4-6 hours with 48b, 84b, 264b and 624b (cycle validation) 3 fills and 20 hours with 840b, 1092b, 1380b (intensity/lumi related problems) MP checklists after 84b, 624b, 840b, 1092 bunches Regular MP checklists every two weeks when operating with 1380b Bunches Max number of bunches injected Alice 3 1 Main-main 48 12 Main-satellite 84 36 264 624 72 840 108 1092 1380 144