Other Process Analysis/Modeling Tools

Slides:



Advertisements
Similar presentations
Standardized Work Creating Continuous Flow
Advertisements

Steps of a Design Brief V Design Brief  Problem, identification, and definition Establish a clear idea of what is to be accomplished. Identify.
Process Analysis and Modeling Using IDEF0
Dobrin / Keller / Weisser : Technical Communication in the Twenty-First Century. © 2008 Pearson Education. Upper Saddle River, NJ, All Rights Reserved.
Seven Quality Tools The Seven Tools
Chapter 3 Systems Documentation Techniques Copyright © 2012 Pearson Education, Inc. publishing as Prentice Hall 3-1.
Chapter 3 Systems Documentation Techniques Copyright © 2012 Pearson Education 3-1.
Chapter 3 Systems Documentation Techniques Copyright © 2012 Pearson Education 3-1.
Steps of a Design Brief V Obtained from workshop-July, 2014-in Guildford County.
Flow charting symbols CHECK SHEETS Check sheets explore what and where an event of interest is occurring. Attribute Check Sheet Order Types 7am-9am 9am-11am.
1 Process Mapping BA 339 Mellie Pullman. 2 Objectives Service Process Differences Little’s Law Process Analysis & Mapping.
Transparency Masters to accompany Operations Management, 5E (Heizer & Render) 4-20 © 1998 by Prentice Hall, Inc. A Simon & Schuster Company Upper Saddle.
Charting and Diagramming
Industrial Facilities Design
Chapter 3 Systems Documentation Techniques Copyright © 2012 Pearson Education, Inc. publishing as Prentice Hall 3-1.
Chapter 3 Systems Documentation Techniques Copyright © 2012 Pearson Education, Inc. publishing as Prentice Hall 3-1.
Copyright © 2003 by Pearson Education, Inc., publishing as Prentice Hall, Upper Saddle River, NJ. All rights reserved. To view maps beyond the range 59-76,
Diagnosis and Troubleshooting of Automotive Electrical, Electronic, and Computer Systems, Fifth Edition By James D. Halderman © 2010 Pearson Higher Education,
CS 3610: Software Engineering – Fall 2009 Dr. Hisham Haddad – CSIS Dept. Chapter 6 System Engineering Overview of System Engineering.
Chapter 3 Systems Documentation Techniques Copyright © 2012 Pearson Education, Inc. publishing as Prentice Hall 3-1.
Unit 2: Engineering Design Process
Chapter 7 Appendix A Object-Oriented Analysis and Design: Use Cases Modern Systems Analysis and Design Seventh Edition Jeffrey A. Hoffer Joey F. George.
Flowcharting A Quality Improvement Tool. Quality = Inspection Statistical methods assisted in prevention of defects – The need for inspection declined.
Chapter 3 Systems Documentation Techniques Copyright © 2012 Pearson Education, Inc. publishing as Prentice Hall 3-1.
1 Objectives: Sequence Diagram 1. You will able to create a sequence diagram. 2. Assign objects in sequence diagrams to classes 3. Map messages to operations.
Work Systems and the Methods, Measurement, and Management of Work by Mikell P. Groover, ISBN ©2007 Pearson Education, Inc., Upper Saddle.
To accompany Quantitative Analysis for Management, 7e by (Render/Stair 4-1 © 2000 by Prentice Hall, Inc., Upper Saddle River, N.J Quantitative Analysis.
Computer Literacy for IC 3 Unit 2: Using Productivity Software Chapter 10: Enhancing a Presentation © 2010 Pearson Education, Inc. | Publishing as Prentice.
PowerPoint presentation to accompany Heizer/Render – Principles of Operations Management, 5e, and Operations Management, 7e © 2004 by Prentice Hall, Inc.,
with Microsoft Office 2007 Introductory© 2008 Pearson Prentice Hall1 PowerPoint Presentation to Accompany GO! with Microsoft ® Office 2007 Introductory.
Central Massachusetts Regional Library System Libraries and Lean Thinking An Overview / Workshop May 11, 2009.
Used Vehicle and Pre-Delivery Inspections 40 Introduction to Automotive Service James Halderman Darrell Deeter © 2013 Pearson Higher Education, Inc. Pearson.
Taking Reading Notes How to Record and Remember Textbook Information.
Steps of a Design Brief V Purpose of a Design Brief  A design brief is the process used to solve problems or complete presentations.  It is very.
Transparency Masters to accompany Heizer/Render – Principles of Operations Management, 5e, and Operations Management, 7e © 2004 by Prentice Hall, Inc.,
Open minds. Open doors. TM School of Mechanical, Industrial, & Manufacturing Engineering Engineering Methods Process Analysis and Improvement.
IE Operations Analysis 1: ● System Analysis – Environment Analysis – Personnel Analysis – Facilities & Equipment Analysis – Process Analysis ● Traditional.
IE 366 Chapter 9 Organization of Workstations Supplementary Material from: Groover, M.P. (2007). Work Systems and the Methods, Measurement, and Management.
Visual Literacy Methods & Tips for Teachers. What is Visual Literacy?  Visual literacy refers to the ability to create effective communications using.
Using Visual Aids. Using Visual Aids The Purpose of Visuals To Visually Enhance The Message To Clarify Details To Aid Retention To Create A Desire.
Chapter 7 Appendix A Object-Oriented Analysis and Design: Use Cases
Quick Overview The Seven Tools
Operations Analysis 1: System Analysis Environment Analysis
Curriculum Teaching and Technology
Work Charting Methods Topics: Pareto Chart – part 1
Fundamentals of Statistical Process Control
Multi-Flow Map Learning how to visually represent the thought process of Cause and Effect Created by Therese Duffy 2011.
Unit - 5 Activity - 1 Competency – 5
Introduction to New Product Development (Documentation)
What is a Flow Chart? An organized combination of shapes, lines, and text that graphically illustrates a process or structure A pictorial representation.
Overview of System Engineering
Name of Machine or Process Sub-title Name of Company
Guilford County SciVis V105.02
CSC115 Introduction to Computer Programming
Seven Quality Tools The Seven Tools
Microsoft Word - Formatting Pages
CS 8532: Advanced Software Engineering
Cornell Notes.
Telling A Story.
(Lecturer in Mech. Deptt.)
No Yes START Do you live in Scotland? Take umbrella See last Flowchart
Run Charts Slide 1 of 3 Run Charts Defined
Summer Training Industrial Engineering Department
Visual recall of class information
Chapter 4: documenting information systems
4.1 Inequalities and Their Graphs
Seven Quality Tools The Seven Tools
Scatter Diagrams Slide 1 of 4
Ch 1 Introduction Sections: Production Systems
4 Step Simple Diagram Sample text Sample text Sample text Sample text
Presentation transcript:

Other Process Analysis/Modeling Tools Flow Process Charts Flow Diagrams Assembly Charts Activity Charts Multi-Activity (Gang) Charts Left-Hand Right-Hand Charts Process Maps Process: A sequence of events leading to some (intended) outcome. For example Manufacture (Freightliner) → finished trucks Assemble dash harness → completed dash wiring harness Fly aircraft → delivered passengers, cargo Climb to assigned altitude → at desired altitude Perform laparoscopic cholecystectomy → gall bladder removed Insert Veress needle → needle in place Purpose is to visually organize and structure a problem rather than to provide a solution.

Process Chart Symbols Operation Move Inspect Storage Delay Operation + Inspection

Flow Process Chart (Single-Object Process Chart) Source: Rago (1963)

Flow Process Chart (Detail) Source: Rago (1963)

Flow Process Chart Source: Groover, M., 2007. Work Systems. Upper Saddle River, NJ: Pearson Prentice Hall.

Flow Process Chart (Detail)

Flow Process Chart Source: Gaither (1986)

Flow Process Chart (Detail)

Flow Diagram Source: Groover (2007)

In-Class Exercise: (Flow) Process Chart, Flow Diagram (handout) Choose a simple activity you do frequently, e.g., Prepare microwave popcorn, Install ski rack on car Do a flow process chart Refer to text, Fig. 6.7 (p. 95) Draw a flow diagram on the back Refer to text, Fig. 6.8 (p. 95) Hand it to the person in front of you to review, make suggestions to improve process Additional copies of the process chart can be downloaded from the Resources section of the IE 366 home page.

Assembly Process Chart (Operation Chart) Source: Groover (2007)

Assembly Process Chart Source: Gaither (1986)

Assembly Process Chart (Details) Source: Gaither (1986)

Activity Chart (one worker) Source: Groover (2007)

Multi-Activity Chart (Gang Chart) Source: Gaither (1986)

Multi-Activity Chart (Detail)

Left-Hand Right-Hand Chart Source: Groover (2007)

Multi-Activity Chart (Worker-multimachine Activity Chart) Source: Groover (2007)

Process Maps (Flow Charts) Symbols In spite of this, there does not seem to be standard formatting or symbology for process maps. The point is simply to map elements of a process to some graphical (typically flow chart) representation.

Process Map Source: Groover (2007) Problems With Flow Process Charts, etc. Reductionist: focus in on the details “Lose the forest for the trees” Lose the “big picture” Focus on small problems/opportunities and miss the big ones. (Assembly process charts can overcome these, to a certain extent.) Source: Groover (2007)

Process Map Source: Overman (2007) Problems With Flow Process Charts, etc. Reductionist: focus in on the details “Lose the forest for the trees” Lose the “big picture” Focus on small problems/opportunities and miss the big ones. (Assembly process charts can overcome these, to a certain extent.) Source: Overman (2007)

Casting Back-End Operations Process Map Scrap? Receive from casting dept Grind & sandblast Perform visual inspection Dispose Yes No Defects? Rework Yes No Perform X-ray inspection Defects? Yes No Pack & ship