Environmental Impact Statement (EIS) August 6, 2008

Slides:



Advertisements
Similar presentations
Calista AVCP Regional Energy Plan. Preliminary Planning and Stakeholder Involvement Resource Inventory and Data Analysis Develop and Review Draft Energy.
Advertisements

Introduction to EIS/EA Managing the Environmental & Project Development Process Presented by the Ohio Dept. of Transportation.
Summary of NEPA and SEPA Coastal Engineering and Land Use Issues in North Carolina Greenville, NC January 13, 2009 Sean M. Sullivan.
Yakima Air Terminal/McAllister Field Master Plan Airport Board Briefing May 21, 2012 YAKIMA AIR TERMINAL | McALLISTER FIELD | Yakima, WA 1.
Meteorology Combined License NRC Review Process Meteorology Joseph Hoch Physical Scientist U.S. Nuclear Regulatory Commission June , 2008 Nuclear.
Environmental Impact Statement Process Development Services Department Carol Helland, Land Use Director/SEPA Official (DSD) David Pyle, Senior Land Use.
New I-65 Interchange at Worthsville Road Welcome!.
Environmental Assessment Public Meeting
Federal Aviation Administration Wood River Region Replacement Airport EIS Who:City of Ketchum & City of Sun Valley Date: February 13, 2008.
Airport Planning. errata Traditional forecasting techniques are still in play, but are considered archaic. US airlines are focused on international travel.
Foreign Affairs Security Training Center
NHPA, Section 106, and NEPA Highlights and Misconceptions.
Opportunities for RAC Participation. Three Part discussion General presentation; Example of oil and gas decision making; and Panel Discussion of RAC involvement.
Negotiating the NEPA Maze: It Really Is Rocket Science Start.
Texas Department of Transportation Corpus Christi District Harbor Bridge Project U.S. 181 (Harbor Bridge)/SH 286 (Crosstown Expressway) Agency Scoping.
Connecticut Department of Transportation Bureau of Policy & Planning.
L O N G B E A C H, C A. Ryk Dunkelberg Barnard Dunkelberg & Company Roles Of Sponsor, Consultant and FAA During NEPA Process L O N G B E.
Programmatic Environmental Impact Statement Experimental Permits COMSTAC Stacey M. Zee October 25, 2006 Federal Aviation Administration.
Program Update Baltimore MPO November 25, Internal Draft AGENDA  Program Overview  Alternatives Development  Stakeholder and Public Outreach.
Barrington Road at Jane Addams Memorial Tollway (Interstate 90) Interchange Improvement Study Hoffman Estates Village Hall June 27, 2012.
Travel Management Rule Implementation
“High Speed Rail Implementation - An Update on Passenger Rail Planning Activities in Minnesota.” presented by: Minnesota Department of Transportation March.
1 Overview of National Environmental Policy Act (NEPA)  Objective: Clarify the roles of NEPA and Negotiated Rulemaking Clarify the roles of NEPA and Negotiated.
Buckhorn Mountain EIS Project August Buckhorn Mountain Exploration Project Echo Bay Exploration is seeking federal and state authorization for.
Water Supply Planning Initiative State Water Commission November 22, 2004.
State Permitting Issues for Wind Developments Southeast and Mid-Atlantic Regional Wind Summit 19 September 2005 Jennifer A. DeCesaro Energy Policy Specialist.
Agency Drafts Statement of Scope Governor Approves Statement of Scope (2) No Agency Drafts: Special Report for rules impacting housing
Patient Protection and Affordable Care Act March 23, 2010.
CHAPTER 3 SCOPING AND AGENCY COORDINATION. Scoping - the procedure for determining the appropriate level of study of a proposed project/activity - process.
Federal Aviation Administration 14 CFR Part 147 Aviation Advisory Committee Working Group Training Updates Presented to: World Aviation Training Symposium.
Public participation of EIA in R.O.C. Hsiao-Tien Wu, Wei-Chein Sun & Tung-Wang Chang Environmental Protection Administration Executive Yuan R.O.C.
Stakeholder consultations Kyiv May 13, Why stakeholder consultations? To help improve project design and implementation To inform people about changes.
Federal Aviation Administration Friedman Memorial Replacement Airport EIS Date: August 6, 2008.
Secondary & Cumulative Effects Analysis Training Program Maryland State Highway Administration’s Secondary and Cumulative Effects Analysis Guidelines For.
U N I T E D S T A T E S D E P A R T M E N T O F C O M M E R C E N A T I O N A L O C E A N I C A N D A T M O S P H E R I C A D M I N I S T R A T I O N State.
Agenda 6:30 – 7:00 p.m. Open House 7:00 – 7:20 p.m. Presentation Welcome Introductions Project Overview Meeting Purpose Environmental Review Process Other.
Big Sandy Rancheria Band of Western Mono Indians Casino and Resort Project Draft EIS Public Hearing Wednesday, February 2, p.m. – 9 p.m. Foothill.
Public Scoping Meeting National Environmental Policy Act Portageville Bridge Project Tuesday, November 19, PM – 7 PM Genesee River Restaurant,
Dominguez-Escalante National Conservation Area Dominguez Canyon Wilderness Resource Management Plan Scoping Meetings August 30 and 31, 2010.
Office of National Transportation Update Presented to: Spent Fuel Project Office Presented by: Gary Lanthrum, Director Office of National Transportation.
© 2009 Barnes & Thornburg LLP. All Rights Reserved. This page, and all information on it, is the property of Barnes & Thornburg LLP which may not be reproduced,
Texas Department of Transportation Corpus Christi District Harbor Bridge Project U.S. 181 (Harbor Bridge)/SH 286 (Crosstown Expressway) Citizens Advisory.
Streamlining NEPA for Reusable Launch Vehicles Federal Aviation Administration Associate Administrator for Commercial Space Transportation October 2004.
Air Force Civil Engineer Center I n t e g r i t y - S e r v i c e - E x c e l l e n c e 1 Col Charles Corcoran, 3 WG/CC Maj Gary Wallace, 3 OSS/ADO Ms.
Developing a Purpose & Need Statement. Objectives  Understand when the P&N is developed in the PDP  Understand the importance of a well- written/well-justified.
Preparation Plan. Objectives Describe the role and importance of a preparation plan. Describe the key contents of a preparation plan. Identify and discuss.
Federal Aviation Administration Wood River Region Replacement Airport EIS Who:Blaine County & City of Hailey Date: February 11, 2008.
Special Meeting on Procedures for Information Exchange November 7, 2007 Geneva Session 1 Anne Meininger United States USA WTO TBT Enquiry Point.
Texas Department of Transportation Corpus Christi District U.S. 181 Harbor Bridge Project Environmental Documentation and Schematic Development Public.
EIAScreening6(Gajaseni, 2007)1 II. Scoping. EIAScreening6(Gajaseni, 2007)2 Scoping Definition: is a process of interaction between the interested public,
Texas Department of Transportation Corpus Christi District U.S. 181 Harbor Bridge Project Environmental Documentation and Schematic Development Citizens.
OAA PRESENTATION February 7, WELCOME AND TEAM INTRODUCTIONS Dave Dennis – ODOT Office of Aviation Jim Bryant – ODOT Office of Aviation Chuck Dyer.
BLM Decision Making Process
Sample Fit-Gap Kick-off
The Plaza at Santa Monica Project PUBLIC SCOPING MEETING
Draft Environmental Assessment Report for Bradley International Airport October 2016
1828 Ocean Ave & 1921 Ocean Front Walk PUBLIC SCOPING MEETING
“The people’s forests” Public Participation in National Forest Planning Susan Jane Brown, Staff Attorney Western Environmental Law Center The National.
Airports Division Great Lakes Region Overview of Airfield Capacity
Stakeholder consultations
La Mesa Climate Action Plan Supplemental Environmental Impact Report Scoping Meeting May 31, 2017.
Facebook Campus Expansion Project EIR
Airport Planning.
Monte Mills Alexander Blewett III School of Law University of Montana
National Environmental Policy Act (NEPA)
Presidential Permits Implementing EO 13337
Pierre Regional Airport Master Plan Update
Information Meeting May 29, 2019.
NEPA Assignment Program Overview
Chicago to Council Bluffs-Omaha
Presentation transcript:

Environmental Impact Statement (EIS) August 6, 2008 Purpose and Need The purpose and need for a replacement for FMA is to: Provide an Airport that conforms to Federal Aviation Administration (FAA) airport design standards, criteria, and orders. Ensure the reliability of an airport serving the Wood River Region by providing approach capability that will allow operations during periods of reduced visibility. At a minimum, provide an approach capability providing for operations down to a ceiling of 200 feet above airport elevation and one-half mile visibility. Ensure the ability of the Airport to accommodate growth in operational demand and in demand for new and expanded facilities. Next Steps The EIS is a Federal process that seeks to disclose any environmental effects of proposed Federal actions. This process is also used to obtain all necessary environmental permits required by Federal and state agencies prior to construction. The FAA issued its Notice of Intent (NOI) to prepare an EIS in the Federal Register on November 1, 2007. It is anticipated that it will take approximately three years to complete the full study process. Phase I – Scoping and Alternative Site Review August 5, 2008 – Presentation to the FMAA August 6, 2008 – Two Public Meetings presenting the Purpose and Need, Forecast, and Alternatives Analysis Phase II – Preparation of the Draft EIS Kick-off field work – Summer/Fall 2008 Draft EIS published for public review – late 2009 Environmental Impact Statement (EIS) August 6, 2008 What is the Purpose of the Public Meeting? The purpose of this meeting is to present the analysis, findings, and recommendations from Phase I of the EIS for the siting and construction of a replacement airport for the Friedman Memorial Airport (FMA) and to collect comments before moving into Phase II of the EIS. Phase I consisted of two primary components: (a) review and determination of alternatives, development of the Purpose and Need, and development of the unconstrained forecast; and (b) agency and public scoping activities. Phase II of the EIS will include: (a) detailed evaluation of the reasonable alternatives carried forward from Phase I and (b) determination and disclosure of the potential impacts and environmental consequences. Phase II will be brought to a close with the completion of the Public Hearing on the Draft EIS. The EIS Process The primary purpose of an EIS is to ensure that Federal government programs and actions meet the National Environmental Policy Act of 1969 (NEPA) goals and policies. This EIS is conducted by the FAA as the Federal lead agency responsible for ensuring that airport development projects, such as those proposed by the Friedman Memorial Airport Authority (FMAA), are in compliance with environmental regulations. The Bureau of Land Management (BLM) is a cooperating agency due to one of the alternative sites being located on BLM land. The potential environmental impacts of the proposed action are assessed in accordance with NEPA. The NEPA process encompasses a body of Federal laws that are intended to protect the nation's environment. In addition to the public, input on the proposed action is also sought from local, state, and Federal agencies. The following illustration graphically shows the process for the FMA EIS. The Scope of Work to be performed by the consulting team and information about the study process will be available throughout the study on the FAA project website listed at the end of this handout. Members of the consulting team are available at the public meetings to answer questions and provide information about the information offered in this handout and in the presentation. How can I comment on the EIS? The public will be asked to provide comments to the FAA on the EIS for their consideration. Public comments are important to assist the FAA in making decisions about the proposed siting and construction of a replacement airport for FMA. Written comments may be submitted on the comment forms that can be found in the workshop area. The FAA welcomes written comments on the information presented in the Draft Alternatives/Purpose and Need Working Paper, which will be available on the project website August 8, 2008. You may also submit comments until the close of business on September 8, 2008 to: Ms. Cayla Morgan Project Manager Federal Aviation Administration Northwest Mountain Region Seattle Airport District Office 1601 Lind Avenue, S.W., Suite 250 Renton, WA 98057-3356 Email: Cayla.Morgan@faa.gov Website: www.airportsites.net/SUN-EIS Project Initiation FAA Sign/Issue Final Record of Decision FAA Final EIS Availability Prepare Final EIS Respond to Agency/Public Comments 30 DAY REVIEW Plan of Study for Phases III and IV Circulation CONDUCT PUBLIC HEARING Notice of Availability of DEIS & Public Hearing Prepare Draft EIS Detailed Environmental Analysis Phase II Develop Preliminary Range of Alternatives Identify Purpose & Need Baseline Data Collection 45-60 DAY Phase I Phase III Meet with Stakeholders Phase IV Conduct Scoping We Are Here Negotiate Scope with FAA/Sponsor Select Consultant Project Identification Tribal Consultation Publish Intent

Alternatives Recommended To Be Carried Forward Into the EIS Process The 2006 Site Selection and Feasibility Study was used as a starting point to identify potential airport sites to analyze in the EIS. Two additional sites, not in the previous analysis which were felt to be viable, were also identified. Once this full complement of sites was identified, a process was developed to assess the attributes and constraints of each site. A three tier process was developed. A total of 14 evaluation criteria were developed for use in assessing the sites. Using the three tier evaluation process, the analysis has identified those sites which fully meet the criteria established and constraints associated with each alternative site. Site 1 (existing airport site) was not evaluated in the three tier process because it was determined it could not meet the established facility requirements. However, Site 1, including routine maintenance, will be carried forward in the EIS as the No Action alternative, as required by NEPA. The Tier One evaluation eliminated eight sites (Sites 2, 3, 7, 8, 11, 14, 15, and 16) not able to meet the criteria referred to as Fatal Flaw criteria; Category I Approach\Missed Approach capability for the primary runway, and a 60-minute drive time from Ketchum, Hailey, Bellevue, and Carey. The Tier Two evaluation process addressed a broader set of criteria, utilizing a numerical ranking system to compare the remaining nine sites. The criteria evaluated in the second tier included: Summary of Aviation Activity Forecasts The forecast effort included the following: Analyzing socioeconomic trends Analyzing the historical aviation activity at Friedman Memorial Airport (FMA) Stakeholder interviews with FMA departing passengers, Twin Falls Airport departing passengers, Sun Valley Express Passengers using BOI to travel to and from the Wood River Region, commercial passenger airlines, SUN general aviation pilots, and Wood River Region businesses Benchmarking analysis of eleven ski resorts in the U.S (including Sun Valley) Aircraft Operations Forecast Results Passenger Forecast Results Safety Considerations Topography of the Site Landside Expansion Capability Airside Expansion Capability Site Development Factors Conformity with Local, State, and Federal Land Use Regulatory Requirements Sponsorship Property Ownership Considerations Proximity to Demand Accessibility to Regional Roadways The remaining nine sites were ranked and a shortlist of three sites (4, 10A, and 12) was identified for the Tier Three and final evaluation which addressed the ability/flexibility of the sites to accommodate enhanced or multiple approaches. All of the short-listed sites (4, 10A, and 12) survived the evaluation process and were recommended to be carried forward for further evaluation in the EIS.