- Condensate pump and feed pump trip!

Slides:



Advertisements
Similar presentations
Parts of a Steam Engine. Tender Container holding water for the boiler and coal for the fire box.
Advertisements

Nonrenewable Energy Nuclear Energy. Nuclear energy- released by a nuclear fission or fusion reaction. –Nuclear force 1,000,000 times stronger than chemical.
CONTROLS OF SUPER CRITICAL BOILERS
Air and Water Chiller Basic Class
Generic Pressurized Water Reactor (PWR): Safety Systems Overview
Reheater Protection Logic
วิชาการเป็นเลิศ เชิดชูคุณธรรม ผู้นำ
Fukushima Daiichi Nuclear Plant Event Summary and FPL/DAEC Actions.
Nuclear Power Turkey Point Power Plant Process. Turkey Point Power Plant Built on 12, 700 acres in Homestead Opened in 1972 Cost to build both reactors.
PARKER BOILER PARKER BOILER HOT WATER PIPING SYSTEM 1. 3 way valve and O.S.A. reset. 2. Single boiler piping schematic. 3. Single boiler with 3 way valve.
ACADs (08-006) Covered Keywords Pressurized Water Reactor (PWR), Boiling Water Reactor (BWR), primary loop, reactivity, reactivity control, reactivity.
Safety analysis of supercritical-pressure light-water cooled reactor with water rods Yoshiaki Oka April 2003, GIF SCWR Mtg. at Madison.
Reheat cycle.
3-Multi - Can Annular Combustor 3-Multi - Can-Annular Combustor The third design and the one preferred by most manufacturers, is the can-annular combustor,
ACADs (08-006) Covered Keywords Components, functions, operation, Auxiliary feedwater, Startup, hot standby, plant cooldown, emergency. Description Supporting.
Accidents Happen But Nuclear Accidents Require Special Skill!
MIS 5241 Three Mile Island What Happened, What Worked, What Didn’t.
1. Cooling tower. 2. Cooling water pump. 3. Transmission line (3-phase). 4. Unit transformer (3-phase). 5. Electric generator (3-phase). 6. Low pressure.
ACADs (08-006) Covered Keywords BWR, main steam, piping and instrument drawing, functional operating sketch, flowpath, interrelationships, safety relief.
Parts of a Steam Engine. Tender Container holding water for the boiler and coal for the fire box.
ACADs (08-006) Covered Keywords Description Supporting Material
Nuclear Fission & Fusion Nuclear Fusion - Energy released when two light nuclei combine or fuse However, a large amount of energy is required to start.
23.4 Nuclear energy NUCLEARNUCLEAR POWERPOWER Millstone Station.
23.4 Nuclear energy NUCLEARNUCLEAR POWERPOWER Millstone Station.
Eric Backus FW System Engineer Exelon - LaSalle Station FSRUG Executive Board Member.
How they work and what happened at Fukushima Daiichi Plant.
ACADs (08-006) Covered Keywords Containment Isolation, actuation logic, Description Supporting Material
Chiller basics With Phil Rodin. Things to check when chiller is not running or is in alarm.
1 RIC 2009 MELCOR Analyses to Address Regulatory Issues: Evaluation of System Success Criteria Hossein Esmaili USNRC March 12, 2009.
1. - Condensate pump and feed pump trip! -Turbine trips! 2.
Kevin Burgee Janiqua Melton Alexander Basterash
Worldwide Commercial Energy Production. Nuclear Power Countries.
Nuclear Thermal Hydraulic System Experiment
1 Kaspar Kööp, Marti Jeltsov Division of Nuclear Power Safety Royal Institute of Technology (KTH) Stockholm, Sweden LEADER 4 th WP5 MEETING, Karlsruhe.
Nuclear Power. Fission Uranium-235 Plutonium-239 Neutron 10n10n 10n10n 10n10n Strontium-90 Xenon-144.
Heating Curves. Energy and Phase Change When adding heat to a solid, energy added increases the temperature and entropy until the melting point is reached.
March 11, 2011 to Present. Presentation Overview Reactor Design and FeaturesChronology of EventsCurrent Status of Each ReactorRecovery Actions Kashiwazaki-Kariwa.
LEADER Project Analysis of Representative DBC Events of the ETDR with RELAP5 and CATHARE Giacomino Bandini - ENEA/Bologna Genevieve Geffraye – CEA/Grenoble.
Oil Pressure Testing.
Ta’Juan Dutrieuille November 4, 2009 Period 1
Nuclear fission Nuclear fission: heavy nuclei split into two smaller parts in order to become more stable proton neutron Kr-90 nucleus U-235 nucleus energy.
Experiment 6: Rankine Cycle Yvette Triay Reporter Group 3.
COLLEGE OF ENGINEERING DEPARTMENT OF MECHANICAL ENGINEERING MENB INTRODUCTION TO NUCLEAR ENGINEERING GROUP ASSIGNMENT GROUP MEMBERS: MOHD DZAFIR.
Generator Operation. Video of Generator synchronizing.
Cloud Formation Do Now: Science Trivia Pressure Song 3 times.
EP4P03 Nuclear Power Plant Systems and Operation
Review Questions Chapter 5
Date of download: 10/6/2017 Copyright © ASME. All rights reserved.
Power Plants Types of Power Plants
Heat Exchangers and Condensers
EP4P03 Nuclear Plant Systems and Operation
Thermodynamics Thermal Hydraulics.
Thermodynamics Processes.
Steam Engine Sliding valve Steam enters chamber from
ATLAS Thermosiphon Electrical Distribution and Run Modes
Pressurized Water Reactor
Pressurized Water Reactors
Nuclear (Atomic) Power Plant
Reactor Experiments Instructor: Prof. Kune Y. Suh T/A : Sang Hyuk Yoon
Vapor Pressure Vaporization - change from liquid to gas at boiling point. Evaporation - change from liquid to gas below boiling point Heat (or Enthalpy)
Fukushima Daiichi Nuclear Plant Event Summary and FPL/DAEC Actions
Nuclear Power.
Forced draft cooling tower. NumberingEquipment A-1Storage Tank B-2Temperature sensor C-3Pump D-4Ball valve E-5Rotameter F-6Cooling water from the tank.
THERMAL POWER PLANT. A Thermal Power Plant converts the heat energy of coal into electrical energy. Coal is burnt in a boiler which converts water into.
Compact Nuclear Simulation Analysis
- Condensate pump and feed pump trip!
T.S SEIUN MARU AUXILIARY BOILER Third Engineer 2019/2/19 ボイラ.
Group 1 Best Group.
The Heat Pump-pumps heat from a cold area to a warmer area.
II. Fossil Fuels.
Presentation transcript:

- Condensate pump and feed pump trip! Turbine trips!

- Condensate pump and feed pump trip! Turbine trips! Temperature and pressure in the primary loop are increasing!

- Relief valve in the pressurizer opens !

- Control rods are inserted ! OPEN - Control rods are inserted !

Pressure in the primary loop is decreasing ! INSERTED OPEN Pressure in the primary loop is decreasing !

- Emergency feed pump is now in operation ! INSERTED OPEN OPERATION - Emergency feed pump is now in operation !

- Relief valve is closed ! INSERTED OPERATION - Relief valve is closed !

- Pressure in the primary loop is decreasing ! INSERTED OPERATION - Pressure in the primary loop is decreasing !

Water level in the secondary side of stream generator is decreasing ! INSERTED OPERATION Water level in the secondary side of stream generator is decreasing !

Pressure in the primary loop is decreasing ! INSERTED OPERATION Pressure in the primary loop is decreasing !

Water level in the pressurizer is gradually increasing ! INSERTED OPERATION Water level in the pressurizer is gradually increasing ! Pressure in the primary loop is decreasing !

There is no water in the secondary side of the steam generator ! INSERTED NO WATER OPERATION There is no water in the secondary side of the steam generator !

Water level in the pressurizer is gradually increasing ! INSERTED NO WATER OPERATION Water level in the pressurizer is gradually increasing ! Pressure in the primary loop is decreasing !

INSERTED NO WATER OPERATION Why is pressure in the primary loop decreasing even though water level is increasing?

Water level in the pressurizer is gradually increasing ! INSERTED NO WATER OPERATION Water level in the pressurizer is gradually increasing ! Pressure in the primary loop is decreasing !

INSERTED NO WATER WATER IS INJECTED OPERATION - Emergency core cooling system is now in operation because of the low pressure in the primary loop !

Water level in the pressurizer is increasing ! INSERTED NO WATER WATER IS INJECTED OPERATION Water level in the pressurizer is increasing ! Pressure in the primary loop is decreasing !

INSERTED NO WATER WATER IS INJECTED OPERATION It might be dangerous if the amount of water is too much in the primary loop…

Water level in the pressurizer is increasing ! INSERTED NO WATER WATER IS INJECTED OPERATION Water level in the pressurizer is increasing ! Pressure in the primary loop is decreasing !

INSERTED NO WATER WATER IS INJECTED OPERATION Emergency core cooling system is operated by the manual mode from now !

Water level in the pressurizer is increasing ! INSERTED NO WATER WATER IS INJECTED OPERATION Water level in the pressurizer is increasing ! Pressure in the primary loop is decreasing !

INSERTED NO WATER WATER IS INJECTED OPERATION One of two emergency core cooling systems is manually stopped and the injected water from the other one is reduced.

Water level in the pressurizer is increasing ! INSERTED NO WATER WATER IS INJECTED OPERATION Water level in the pressurizer is increasing ! Pressure in the primary loop is decreasing !

- Water level is reaching the top of the pressurizer ! INSERTED FULL WATER NO WATER WATER IS INJECTED OPERATION - Water level is reaching the top of the pressurizer !

INSERTED FULL WATER NO WATER WATER IS INJECTED OPERATION - Water in the pressurizer is full, but measurement data at other positions in the primary loop do NOT show the solid state…

Water level is at the top of the pressurizer ! INSERTED FULL WATER NO WATER WATER IS INJECTED OPERATION Water level is at the top of the pressurizer ! Pressure of the primary loop is decreasing !

Water level is at the top of the pressurizer ! INSERTED FULL WATER NO WATER WATER IS INJECTED OPERATION Water level is at the top of the pressurizer ! Pressure of the primary loop is decreasing ! Water in the containment sump is moved to the auxiliary building.

INSERTED FULL WATER WATER IS INJECTED OPERATION The block values on the emergency feed water line pump have been CLOSED ! Why ! Now it is OPEN !