INSIDE in-beam PET system assembly and test at INFN Torino

Slides:



Advertisements
Similar presentations
Kondo GNANVO Florida Institute of Technology, Melbourne FL.
Advertisements

LAV trigger primitives Francesco Gonnella Photon-Veto Working Group CERN – 09/12/2014.
HV Report F.Cavallari (INFN Roma). High Voltage set-up in M0’ 2 channels each driving 50 crystals (100 APDs) 1 Crate hosting 1 board (final system). 1.
RPC Trigger Software ESR, July Tasks subsystem DCS subsystem Run Control online monitoring of the subsystem provide tools needed to perform on-
Data Acquisition System for 2D X-Ray Detector Beijing Synchrotron Radiation Facility (BSRF) located at Institute of High Energy Physics is the first synchrotron.
6 June 2002UK/HCAL common issues1 Paul Dauncey Imperial College Outline: UK commitments Trigger issues DAQ issues Readout electronics issues Many more.
LKr readout: present and future R. Fantechi 30/8/2012.
New Features of APV-SRS-LabVIEW Data Acquisition Program Eraldo Oliveri on behalf of Riccardo de Asmundis INFN Napoli [Certified LabVIEW Developer] NYC,
Mathieu Goffe EUDET JRA1 meeting, DESY Wednesday 30 January 2008 IPHC, 23 rue du Loess BP 28, 67037, Strasbourg Cedex 02, France.
Pennazio F 1, Battistoni G 2, Bisogni MG 3, Cappucci F 2, Cerello P 1, Del Guerra A 3, Fiorina E 4,1, Giraudo G 1, Kraan A 3, Mairani A 5, Morrocchi M.
Jon S Kapustinsky 11/17/2010 Jon S Kapustinsky FVTX Commissioning Plan 1.71 Jon S Kapustinsky 1.
In-Beam PET Status Report -- TPS. 2 TPS project PET monitoring prototype 2D view of the FOV coverage of the 4+4 modules Use of 4 modules vs. 4 modules.
1 S. E. Tzamarias Hellenic Open University N eutrino E xtended S ubmarine T elescope with O ceanographic R esearch Readout Electronics DAQ & Calibration.
JCOP Workshop September 8th 1999 H.J.Burckhart 1 ATLAS DCS Organization of Detector and Controls Architecture Connection to DAQ Front-end System Practical.
Status of NA62 straw electronics and services Peter LICHARD, Johan Morant, Vito PALLADINO.
SALTRO TPC readout system Presented by Ulf Mjörnmark Lund University 1.
Installation and Commissioning Planning Leslie Camilleri Calorimeter Commissioning Meeting 5 th September 2006.
S. Brambilla, “Recent DAQ integration test at L.N.L May 2008” 7 th AGATA Week, Uppsala, 8-11 July th AGATA Week Uppsala, 8-11 July 2008 Recent.
Hall D Online Meeting 27 June 2008 Fast Electronics R. Chris Cuevas Jefferson Lab Experimental Nuclear Physics Division 12 GeV Trigger System Status Update.
Giovanni Polese1 RPC Detector Control System for MTCC Pierluigi Paolucci, Anna Cimmino I.N.F.N. of Naples Giovanni Polese Lappeenranta University.
Edward Freeman CCLRC ESDG Optical Data Acquisition Development EID forum 12th October 2005 By Edward Freeman.
CHANTI update F. Ambrosino, T. Capussela, D. Di Filippo, P. Massarotti, M. Mirra, M. Napolitano, L. Roscilli, G. Saracino.
News on GEM Readout with the SRS, DATE & AMORE
07-Jan-2010 Jornadas LIP 2010, Braga JC. Da SILVA Electronics systems for the ClearPEM-Sonic scanner José C. DA SILVA, LIP-Lisbon Tagus LIP Group * *J.C.Silva,
Source Controller software Ianos Schmidt The University of Iowa.
2/4/2001Ludovico Pontecorvo INFN Roma1 Plans for the H8 system test: 2001/2002 Goals for the 2001/2002 Test beam Beam layout Chamber Supports 2001 Schedule.
Target Commissioning Target installed in ISIS “Demonstrator” target in R78 Initial commissioning plans Chris Booth Sheffield 11 th February 2008.
1 Calorimeters LED control LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Status of the calorimeters LV power supply and ECS control Status of.
Leo Greiner IPHC beam test Beam tests at the ALS and RHIC with a Mimostar-2 telescope.
IBL CO 2 cooling planning 03 July 2013 Jan Godlewski, Bart Verlaat, Lukasz Zwalinski 1
STAR Pixel Detector readout prototyping status. LBNL-IPHC-06/ LG22 Talk Outline Quick review of requirements and system design Status at last meeting.
October Test Beam DAQ. Framework sketch Only DAQs subprograms works during spills Each subprogram produces an output each spill Each dependant subprogram.
R. Fantechi. Shutdown work Refurbishment of transceiver power supplies Work almost finished in Orsay Small crisis 20 days ago due to late delivery of.
Status of the PSD upgrade - Status of the PSD cooling and temperature stabilization system - MAPD gain monitoring system - PSD readout upgrade F.Guber,
Status of LAV electronics commissioning Mauro Raggi, Francesco Gonnella Laboratori Nazionali di Frascati 1 Mauro Raggi - Laboratori Nazionali di Frascati4.
R. Fantechi 2/09/2014. Milestone table (7/2014) Week 23/6: L0TP/Torino test at least 2 primitive sources, writing to LTU, choke/error test Week.
Update on works with SiPMs at Pisa Matteo Morrocchi.
1 DCS Meeting, CERN (vydio), Jun 25th 2013, A. Cotta Ramusino for INFN and Dip. Fisica FE Preliminary DCS technical specifications (v1.0) for the Gigatracker.
Software and TDAQ Peter Lichard, Vito Palladino NA62 Collaboration Meeting, Sept Ferrara.
Sumary of the LKr WG R. Fantechi 31/8/2012. SLM readout restart First goal – Test the same configuration as in 2010 (rack TS) – All old power supplies.
V.Duk, INFN Perugia1 CHOD/NHOD status Viacheslav Duk, INFN Perugia Ferrara,
BRAN at IR2 and IR8: status, commissioning and operation Enrico Bravin AB-BI Joint LHC Machine-Experiments Workshop on Very Forward Detectors 25 January.
Scalable Readout System Data Acquisition using LabVIEW Riccardo de Asmundis INFN Napoli [Certified LabVIEW Developer]
Summary of IAPP scientific activities into 4 years P. Giannetti INFN of Pisa.
RICH Readout Plans F. Bucci, M. Piccini on behalf of the RICH WG.
1 Calorimeter LED & LV - HV control systems LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Outline Status of the calorimeters LV & MV power supplies.
Slow Control and Run Initialization Byte-wise Environment
Gu Minhao, DAQ group Experimental Center of IHEP February 2011
Slow Control and Run Initialization Byte-wise Environment
DAQ Requirements M. Villa 21/02/2011.
Preliminary data analysis on 16x16 modules
09/02/2006 Muon week HV and LV systems status for Magnet Test S. Braibant, P. Giacomelli, M. Giunta.
INSIDE – Update meeting
DAQ for ATLAS SCT macro-assembly
A New Clock Distribution/Topology Processor Module for KOTO (CDT)
The ELENA BPM System. Status and Plans.
ProtoDUNE SP DAQ assumptions, interfaces & constraints
F.Guber, A.Ivashkin INR, Moscow
Large CMS GEM with APV & SRS electronics
System Tests at Lyon From Aachen: ICB for front petal side A, disks 4-6, rings 4 and 6 From CERN: CCU25 Tests (M. Ageron): FEC ring and I2C addressing.
Pierluigi Paolucci - I.N.F.N. Naples
DAQ Architecture Design of Daya Bay Reactor Neutrino Experiment
RPC HV&LV status Introduction HV power supply tender
RPC Detector Control System
RPC Detector Control System
RPC Detector Control System
Pierluigi Paolucci & Giovanni Polese
RPC Detector Control System
Hardware needs (ARCS) Current ARCS capabilities at both sites should be able to keep up with production assuming software changes Automatic I-V curves,
Racks PC Rack >> 24 mini and 12 tall PC racks Mini Racks
Presentation transcript:

INSIDE in-beam PET system assembly and test at INFN Torino R. Wheadon , F. Pennazio Torino INSIDE Group INSIDE meeting, Pisa, January 20th 2016

PET detectors construction at INFN Torino Lost over two months due to problems ordering components Detector boxes completed and tested with cooling last week before Christmas 2015 thanks to unprecedented (and unrepeatable) contribution from the entire INFN Torino electronics laboratory personnel Support mechanics delivered 13th January 2016 First acquisition with all boards 15th January 2016 INSIDE meeting, Pisa, January 20th 2016 R. Wheadon, F. Pennazio

FE boards on cooling support Connector panel INSIDE meeting, Pisa, January 20th 2016 R. Wheadon, F. Pennazio

FE boards mounted and cabled in PET box INSIDE meeting, Pisa, January 20th 2016 R. Wheadon, F. Pennazio

Detector blocks on glass-fibre support INSIDE meeting, Pisa, January 20th 2016 R. Wheadon, F. Pennazio

Completed box INSIDE meeting, Pisa, January 20th 2016 R. Wheadon, F. Pennazio

Ready for test with Tx boards and chiller connected INSIDE meeting, Pisa, January 20th 2016 R. Wheadon, F. Pennazio

Excellent temperature stability (glitches in LV current are CAEN software glitches) INSIDE meeting, Pisa, January 20th 2016 R. Wheadon, F. Pennazio

Completed mechanics INSIDE meeting, Pisa, January 20th 2016 R. Wheadon, F. Pennazio

Completed PET detector (running) INSIDE meeting, Pisa, January 20th 2016 R. Wheadon, F. Pennazio

System configuration, Data Acquisition and monitoring set up TREATMENT ROOM CONTROL ROOM Crate INSIDE in-beam PET system Switch LabView SW (….) Master board DAQ SW GUI TX (….) TX Switch: 24-port Gigabit + 8 port Gigabit Control PC (desktop) DAQ Server: 32 cores HT, 128 GB ram Monitoring PC: 4 cores, 6 Gb RAM (desktop) INSIDE meeting, Pisa, January 20th 2016 F. Pennazio, R. Wheadon

Background single events Firmware-decoded events Lutetium background spectrum Good background rate uniformity INSIDE meeting, Pisa, January 20th 2016 F. Pennazio, R. Wheadon

TOFPET Tfine distribution Raw data format acquisition Lutetium background spectrum Tfine with ideal calibration should be [0,1] INSIDE meeting, Pisa, January 20th 2016 F. Pennazio, R. Wheadon

TOFPET EoC-SoC new calibration Raw data format acquisition Lutetium background spectrum New Gui feature: EoC-SoC calibration and TOFPET calibration files update -> corrected Tfine interval -> better firmware decodification INSIDE meeting, Pisa, January 20th 2016 F. Pennazio, R. Wheadon

Firmware-decoded Tfine distribution Decoded data format acquisition Lutetium background spectrum Good Tfine uniformity INSIDE meeting, Pisa, January 20th 2016 F. Pennazio, R. Wheadon

TOFPET parameters check Firmware-decoded TOT Lutetium background spectrum Good TOT uniformity INSIDE meeting, Pisa, January 20th 2016 F. Pennazio, R. Wheadon

TOFPET parameters check Firmware-decoded TOT Lutetium background spectrum TOT in coincidence INSIDE meeting, Pisa, January 20th 2016 F. Pennazio, R. Wheadon

…and what about the CTR? 30 cm head distance 2 ns separation between peaks Firmware-decoded TOT Lutetium background spectrum CTR with 5 ns window -> calibration software (already tested for 2 boards) works, source needed to perform actual calibration INSIDE meeting, Pisa, January 20th 2016 F. Pennazio, R. Wheadon

Full PET heads assembled, mounted on support mechanics and tested Conclusions Full PET heads assembled, mounted on support mechanics and tested Uniform temperature First acquisition performed with all boards with background Lu radiation Raw data and firmware-decoded data tested Part of TOFPET calibration performed with DAQ Gui What can be done with background data is as expected Validation with sources scheduled for January, 22 and 29 Of course, hardware (FPGA placement), firmware and software development will continue… INSIDE meeting, Pisa, January 20th 2016 F. Pennazio, R. Wheadon

INSIDE meeting, Pisa, January 20th 2016 F. Pennazio, R. Wheadon