Hyderabad city water supply system

Slides:



Advertisements
Similar presentations
Water Distribution Systems – Part 1
Advertisements

840 MW of Green Electric generated per Day in 10 Acres of land
CONSULTING ENGINEERS LIMITED PLANNING AND DESIGN OF SEWERS USING ADVANCED TECHNIQUES FOR PROPOSED SEWERAGE SYSTEM OF DISTRICT- I FOR KANPUR CITY UNDER.
INTEGRATED RIVER BASIN MANAGEMENT IN WESTERN GHAT REGION THROUGH A CASE STUDY Dr A B Anitha Scientist F & Head Surface Water Division Centre for Water.
Water Services Department Arizona Mexico Commission Bi-National Meeting March 9-11, 2008 David Cavazos Deputy City Manager Water Services Department Arizona.
Pranahita – Chevella Project PHASE - II
Section-07 of Chapter-V of KW&SB, Act 1996 describes following Major Functions of KW&SB:- UNDERTAKE BULK PRODUCTION, FILTERATION / TREATMENT TRANSMISSION.
rd International Commission on Irrigation and Drainage, Executive Council Meeting, 7 th Asian Regional Conference And Irrigation Australia 2012.
Water Distribution Systems. Distribution systems Designed to adequately satisfy water requirements for combination of: Domestic use Commercial Use Industrial.
No.Name of PackageEstimate CostStatus IProjects approved. a.Remodeling of water supply distribution network Rs croresWorks under.
Municipal Corporation of Greater Mumbai Water Sector Initiatives.
February 24, 2015 Presented by: Heidi Springer, P.E. Brian Ginter, P.E.
SRIPADASAGAR PROJECT (YELLAMPALLY PROJECT)
Water System Planning Study
ZAPDOR
1 III. Water Treatment Technologies Topic III. 7. Water Stability. General Arrangement of Water Treatment Plant Water Stability §Stability index (Index.
(POLAVARAM) (Head Works)
Urban Water Department of Hydro Sciences, Institute for Urban Water Management Peter Krebs Dresden, Global water aspects 1 Introduction to urban.
TADIPUDI LIFT IRRIGATION SCHEME
For Long Term Water Security SARDAR SAROVAR (NARMADA) PROJECT Sardar Sarovar Narmada Nigam Limited Dr. M.B. Joshi GM (Tech. & Coor.)
ALISAGAR LIFT IRRIGATION SCHEME – 2 years period
PUSHKARA LIFT IRRIGATION SCHEME (2 years period)
HANDRI NIVA SUJALA SRAVANTHI (IRRIGATION SCHEME) (1.98 LAKH ACRES)
GNSS PROJECT (PHASE-I)
Short and Long Range Water Supply Planning and Aquifer Performance Test (APT)
VELIGONDA PROJECT 1. Teegalem Canal (48.15 km) 62,000 Ac
What is St. Paul Regional Water Services? Supplies Public with Water Department of the City of St. Paul Public Employees Governed by Board of Water Commissioners.
Importance Of Water Water is life. Living on the earth may be impossible without adequate water quality and quantity. Water makes up more than half of.
MoUD Center of Excellence: PPP initiatives in Water & Sanitation Analysis of City Corporate Plan: PPP-ability Criterion Matrix.
April 21, 2015 Presented by: Heidi Springer, P.E. Brian Ginter, P.E.
(Water Availability : 57.50TMC, Ayacut proposed: 2,55,510Acs)
PHASE – I & PHASE - II.
PACKAGE 22PACKAGE 23 Total Ayacut under this scheme: 50,250 Ac. KOILSAGAR LIFT IRRIGATION SCHEME, MAHABOOBNAGAR DISTRICT (FLOW DIAGRAM) Approach channel.
PRESENTATION ON 5 YEARS INFRASTRUCTURE PLAN December 30, 2005.
Integrated River-Basin Management Model for a Target River Basin (Selenga River) KOREA ENVIRONMENT INSTITUTE First Draft.
November 17, 2015 Charting the Future of Water Reuse for the City of Raleigh Sheryl D. Smith, P.E. – CDM Smith Eileen M. Navarrete, P.E., PMP – City of.
Extends A WARM WELCOME. Pumping 780 Million Litres of Water per Day to Bangalore City through Cauvery Water Supply Scheme Stage-I, II, III and IV PRESENT.
1 VENKATANAGARAM PUMPING SCHEME. 2 LOCATION OF THE PROJECT  At Km of Akhanda Godavari Left Bank  Longitude 81°- 35’ – 56” E  Latitude 17°- 8’
DISTRIBUTORIES (D19, D22, D25, D37, D39, D40 TO D55) CONSTRUCTION OF WHOLE DISTRIBUTORY SYSTEM, CM & CD WORKS AND MICRO NETWORK (FIELD CHANNELS) The main.
1 Project Profile : Lifting of 20 tmc of water from foreshore of PJP and Ookachettivagu Project Pondage 2 Administrative Sanction : G. O. Ms. No. 166,
CHINA TUMBALAM TANK (Existing) DUDDI LI SCHEME DUDDI RESERVOIR (New) BASALA DODDI LI SCHEME MADHAAVARAM LI SCHEME Location : DUDDI (V), Madhavaram Tanda.
2015 Eastern Oregon Region AWWA/PNCWA Operator’s Conference Water Project of the Year City of Stanfield’s Water System Improvements.
52, 060 Ac. Cap TMC Cap TMC 28, 000 Ac. Under Progress.
PRESENTER: K.P.REDDY B.E (Elect), F.I.E S.E (Retd.) APGENCO Associate President, Telangana Retired Engineer's Forum 1.
CESC – visit presentation Marwadi Shares and Finance Ltd. 17 August 09.
By: Vijay Shivtare Minister of state for WRD, WCD, Maharashtra, India Hanumant Dhumal Superintending Engineer, Water Resources Department, Maharashtra,
1 Implementation of Off-Grid Policy in the state of Maharashtra By H M Kulkarni General Manager (R.E) Maharashtra Energy Development Agency Date 17 th.
@ContentsExecutive Summary Annexures A M A J U B A Umkhandlu Wesifunda District Municipality Distrik
PILOT PROJECT ON NRW IN SHEETAL PARK AREA OF RAJKOT CITY IN GUJARAT Danish Water Forum AND Rajkot Municipal Corporation.
Hyderabad Events/Stories. International Airport Construction at Hyderabad Event 1.
“Is User Pays Possible for a Remote Town Water Supply – Case Study”
VELIGALLU PROJECT 1 PROJECT PROFILE: Formation of earth dam, construction of spillway & fabrication and erection of 5 Nos. Radial gates for Veligallu Project.
1 MAHARASTRA SUJAL NIRMAL ABHIYAN. Client: DAUND Municipal Council PMC: Maharashtra Jeevan Pradhikaran Vendor: GraphiCAD Systems Pune. Work Order : B1.
CS3: Model for Efficient Water Management at Local Level in Urban/ Peri-Urban Areas A Case Study – Water Management In Kigali City, Rwanda 6 th April,
Presented by Telangana Retired engineers forum 11.
Water Supply Municipal Water Demand Civil Engineering Department Faculty of Engineering and Technology The University of Jordan Instructor: Ghada Kassab,
GOVERNMENT OF TELANGANA Irrigation & CAD Department
Lecture (11): Water Distribution Systems
EXERCISES Two water reservoirs are connected by a pipe 610m of 0.3m diameter, f’=0.038 and the flow produced by the difference in water surface elevations.
Biksham Gujja and Shiva Kumar Kanike
Kings Bluff Raw Water System Parallel Raw Water Main Project
Prepared By : Kamal Hamaydeh Ahmad Odet-allah
Presentation on Ken – Betwa Link Project-Phase-II
An-Najah National University Faculty Of Engineering
HYDRO ELECTRIC POWER PLANTS BY Prabhakaran.T AP/MECH
Summer Plan: 2013 (1st March – 31st May)
PRESENTATION ON KALESHWARAM PROJECT
Review of CADWM Projects Under PMKSY
Class III Estimate for Regional Consolidation
بسم الله الرحمن الرحيم Al-Najah National University
Presentation transcript:

Hyderabad city water supply system PRESENTATION ON Hyderabad city water supply system Sri. M.SATYANARAYANA Executive Director HMWSSB

Hyderabad city water supply system HMWSSB Hyderabad city water supply system SAILENT details Service Area - 1400 Sq.kms upto ORR. No of Connections - About 10 Lakhs. Population Served - About 1 Crore. No. of Sources - 6 Sources. Design Capacity of Supply - 602 Mgd (35 TMC). No. of WTPs - 10 Nos. WTP Max Cap at one location - 1227 Mld. Service Reservoir Storage Cap - 400 Mld. Largest Pipe Size - 3000mm dia. Max Lift in One Scheme - 500 Mtrs. Length of Transmission Mains - 1000 Kms. Length of Distribution Mains - About 10,000 Kms. Monthly Revenue - 100 Cr. Monthly Expenditure - 110 Cr. Monthly Electricity Bill - 60 Cr.

HYDERABAD CITY WATER SUPPLY SYSTEM Overview map showing Sources, Transmission, SRs, Divisions New Source under construction Godavari Source - 4 Singur Source - 3 Manjira Source - I Osmansagar Source –2 Himayathsagar Source – 5 Krishna

Hyderabad City Water Sources Design Drawls, Present Drawls, Mode of Drawls Name of Source Design Drawls (in Mgd) Present Drawls Drawl mode from Source Osmansagar 25 00 Gravity Himayatsagar 15 Manjira 45 30 Pumping Two Stage Singoor 75 18 Single Stage Krishna Akkampally (Krishna Ph-I, II & III) 270 Three Stage Godavari Yellampally (Godavari Ph-I ) 172 114 Four Stage TOTAL 602 432

KRISHNA Scheme – 3 Stage Pumping (110 Km)

GODAVARI scheme – 4 Stage Pumping (186 Km)

Service Area Expansion From MCH – GHMC - ORR. SA - 165 Sq.Km SA - 680 Sq.Km Resulted :- Population Addition, Increase of Demand SA – 1400 Sq.Km

POPULATION PROJECTIONS upto 2041 MCH, GHMC, ORR Sl. No. Jurisdiction Population Growth Trend Projected Population 2001 2011 %age growth 2018 2021 2024 2031 2041 1 MCH 36.33 46.52 28.00% 54.85 56.71 66.9 77.09 2 GHMC 18.42 37.36 102.82% 68.98 75.77 89.24 120.7 165.63 3 ORR 3.00 5.00 66.66% 9.58 11.17 14.52 22.34 44.68   Sub-Total 60.75 99.88  -- 133.41 143.65 160.47 209.94 287.4 4 Floating Population (IT & other sectors) - 9.57 20.00 21.50 25.00 30.00 Total 142.98 163.65 181.97 234.94 317.4

DEMAND ASSESSMENT upto 2041 Domestic, Non-Domestic   Horizon Year Population (in Lakhs) Domestic Demand (in MGD) Demand for Commercial (10%), Industrial (10%), Institutional (10%), & Fire (5%) Total Demand (in Mgd) (in TMC) 1 2018 142.98 542.54 189.89 732.43 42.58 2 2021 163.65 620.97 217.34 838.31 48.74 3 2024 181.97 690.39 241.63 932.02 54.18 4 2031 234.94 891.48 312.02 1203.50 69.97 5 2041 317.40 1204.37 421.53 1625.91 94.53

DEMAND, AVAILABILITY, DEFICIT with FUTURE plans....... Sl. No. Horizon Year Demand (in TMC) Availability with future plans Deficit / Surplus Future Plans 1 2018 42.58 26.50 -16.08 Available = Krishna 16.5, Godavari 10, Singur / Manjira –Nil, OS / HS - NIl. Total Available – 26.5 TMC 2 2021 48.74 26.5 + 20 46.50 -2.24 Proposed to add 20 TMC from Keshavapuram by 2021. 3 2024 54.18 46.50 + 5.50 52.00 -2.18 Proposed to add 5.50 TMC from Krishna Ph-IV Scheme by 2024. 4 2031 69.97 52.00 + 20 72.00 +2.03 Proposed to add 20 TMC from Devallammanagaram by 2031. 5 2041 94.53 72.00 + 20 92.00 -2.53 Proposed to add 10 TMC from Godavari and 10 TMC from Krishna. 10

NEW SOURCE AUGMENTATION PROJECTS UNDER FORMULATION (part of bridging the source gap)

Keshavapuram at Shamirpet – 20 TMC from Godavari Basin ( Main Scheme Schematic Map) YELLAMPALLY CAPACITY -20 TMC KALESHWARAM GODAVARI LIFT SCHEME MALLANNA SAGAR CAPACITY -50 TMC (UNDER GODAVARI LIFT SCHEME) KONDAPOCHAMMA SAGAR KESHAVAPURAM RESERVOIR CAPACITY 20 TMC

Keshavapuram – 20 TMC from Godavari Basin (Schematic Map from Mallannasagar to City) TO BE FILLED FROM GODAVARI LIFT SCHEME MALLANNA SAGAR CAPACITY -50 TMC (UNDER GODAVARI LIFT SCHEME) KONDAPOCHAMMA SAGAR RAW WATER PIPELINE 3600mm dia – 3 Rows MBR at GHANPUR WTP KESHAVAPURAM RESERVOIR CAPACITY 20 TMC FRL 600M LWL 540M ORR JUNCTION, SHAMEERPET

Keshavpuram Reservoir – Brief Details Government appointed M/s.WAPCOS Ltd., for preparation of detailed project reports. The brief components are; Capacity 20 TMC, LWL – 540 M, FRL – 596 M. Inlet Mains – Gravity – 3.6 M dia – 3 Rows – 20 Km Length. Sump and Pump House – 4 Nos – 16 MW – VT Pumps. Concrete Dam – 60 M ht – 350 M Length. Rock Fill Dam – Bund height ranging 5 M to 50 M – 13 Km length. Drawl arrangement to WTP – 3 Km length – 3 M dia – 2 rows. 750 Mld WTP with all electro mechanical arrangements. Pumping main to MBR. The Draft DPR cost is about Rs.8000 Cr.

DEVALLAMMANAGARAM at Malkapur – 20 TMC from Krishna Basin (Main Scheme Schematic Map) MALKAPUR RESERVOIR CAPACITY-20 TMC SHIVANNAGUDA RESERVOIR CAPACITY -14.5 TMC DINDI RESERVOIR PALAMURU LIFT SCHEME

DEVALLAMMANAGARAM – 20 TMC from Krishna Basin (Schematic Map from Dindi to City) PROPOSED MALKAPUR RESERVOIR TREATED WATER PIPELINE CONNECTING POINT TO EXISTING KRISHNA WATER SUPPLY SYSTEM CAPACITY -20 TMC FRL – 510M LWL- 440M RAW WATER PIPELINE ORR JUNCTION, SAGAR ROAD SHIVANNAGUDA RESERVOIR CAPACITY -14.5 TMC CANAL DINDI RESERVOIR TO BE FILLED FROM PALAMURU LIFT SCHEME

FLOW ANIMATION FROM SHIVANNAGUDA TO DEVELAMMANAGARAM TO CITY

Thank you