Biological engineering and gabion constructions in coast protection

Slides:



Advertisements
Similar presentations
Enzyme Stabilized Mud (Earthen) Construction using DBV-1
Advertisements

Xing Zhang Yifan Zhang Fan Yang.  A Large-scale Coal Mine locates at this area.  The problem of subsidence here is quite serious.  Use TRANSIENT.
Measurement for Civil Engineering works
MISSOURI RIVER BOARD MATTRESS Historic Corps photo.

CRITICAL REPAIR OF KALAUPAPA DOCK STRUCTURES: HONORING THE PAST, PROTECTING THE FUTURE.
Adelaide Coastline Sand Carting May 2004
DEVELOPMENT PLANNING FOR COASTAL HAZARDS JUNE 30, 2006 BY ENGINEERING SECTION COASTAL ZONE MANAGEMENT UNIT COASTAL ENGINEERING FOR NATURAL HAZARDS.
CONSTRUCTION.
GABION PRESENTATION.
CE 120 Introduction to Civil Engineering
CE 120 Introduction to Civil Engineering
COASTAL DEFENCES. There are many techniques used for reducing the power of waves before they erode a coastline. The photos illustrate some methods used.
C ONTACT STRESS IN CIVIL ENGINEERING. Introduction 1 Skyscrapers Bridges Dams How are these constructions supported? Why are all these large constructions.
Sec 2 IDS, 2010 Coastal Management. You will learn: 1.Evaluate the feasibility of coastal protection measures at Pulau Ubin.
Your logo کاربرد ژئوگرید در افزایش پایداری موج شکنها
 The aim is to protect the coastline by preventing the waves eroding the coastline.
CEE Civil and Environmental Engineering Department W. M. Kim Roddis, Ph.D., P.E. Department Chair.
1. 2 Civil Engineering Practice Introduction Instructor: Dr. Attaullah Shah Lecture # 1 Department of Civil Engineering Swedish College of Engineering.
Coastal Environments How the coast is eroded Landforms and characteristic features Transport and deposition of material Coastal management issues Sustainable.
Foundation Systems Unit 11. Types of Foundations Pilings Continuous Grade Beam.
AN INTEGRATED DESIGN CONCEPT … … FROM UNDERGROUND UP TO THE TOP ODOTECHNIKI LTD CONSULTING ENGINEERS Address: 59, 3 rd September Str.
CIVIL ENGINEERING. Civil engineering work includes: dams embankments motorways bridges buildings cuttings quarries tunnels mines All these need to take.
Galveston coastal fieldwork Task question:. texas/houston/article/Sea-swallowing-Galveston-faster-than-
This house sits on the top of a hill that is covered with loose soil and rocks. The new owners of this house have some concerns about their property. What.
COASTS PROTECTION METHODS.
Situation in the Netherlands
Emergency Landslide Correction Benefits of a Contract Joey Franzino, P.E. INDOT Geotechnical Operations Engineer September 23, 2015.
Extreme engineering Extreme engineering – part 1 IX-2009 (rev. VI-2012) (Part 00 EE, PP 2007, animation+p/r : ) ready 1 Copyright notice Unauthorised.
Company and family presentation – part 4 V-2009 (rev. VI-2012) (Part 00, PP 2007, animation+p/r : ) ready 1 Copyright notice Unauthorised copying.
Company and family presentation – part 5 V-2009 (rev. VI-2012) (Part 00, PP 2007, animation+p/r : ) ready 1 Copyright notice Unauthorised copying.
Part 10-2b Micropiles and self drilling rods in soil and rock engineering V-2009 (rev. XI-2012) (Part 10-2b, PP 2007, animation+p/r : compr.)
(Part 9-2e, PP 2007, animation+p/r: rev compr.
Part 10-1b Micropiles and self-drilling rods in soil and rock engineering V-2009 (rev. XI-2012) (Part 10-1b, PP 2007, animation+p/r : compr.)
Part 11 Concrete repairs - sealing of cracks and waterproofing (Part 11, PP 2007, animation+p/r : DEMO) ready Copyright notice Unauthorised.
Extreme engineering Extreme engineering – part 2 IX-2009 (rev. VI-2012) (Part 00 EE, PP 2007, animation+p/r : ) ready 1 Copyright notice Unauthorised.
Part 10-2a Micropiles and self drilling rods in soil and rock engineering V-2009 (rev. II-2013) (Part 10-2a, PP 2007, animation+p/r : compr.)
Part 16 Sequential and single sequence grouting with hybrid and semi-hybrid grouts VII-2009 (Part 16, PP 2007, animation+p/r : DEMO) ready 1.
Welcome to Condor Projects Ltd, a specialist contractor to the civil engineering industry with over 30 years experience
(Part 30, PP 2007, animation+p/r : short version compr.)
A.D.I.T New V. V. Nagar Branch : Civil Engineering (5th semester) Subject : Soil Mechanics ( ) Topic : Cofferdams Prepared by : Tina Naik ( )
Concrete repairs in Dammam
Micropiles and self drilling rods in soil and rock engineering
(Part 66 short, PP 2007, animation+p/r compr.)
Part 75-2A Piles, steel-core piles and micropiles. Static test loadings II/2013, modified.
Part 75-1D Piles, steel-core piles and micropiles. Static test loadings II/2013, modified.
Concrete repairs, crack sealing
Drilling and sampling in foundation engineering
Activity 32 “Modeling Erosion”
Part 66/1 “Polyurethane resins in rock grouting and tunnel repairs”
Part 92_4 ”PUR in civil engineering – sealing of retaining walls”
Part 75-4D Piles, steel-core piles and micropiles. Static test loadings. TNa micropiles.
Part 75-3D Piles, steel-core piles and micropiles. Static test loadings II/2013, modified.
{Graduation Project} An-Najah National University
(Refer to Chapter 2 of the textbook)
Coastal Depositional Landforms
Drilling and sampling in foundation engineering
EAG346-Sem II 2014/2015 Lesson 2.
Various Fields in Civil Engineering By R.Janani
B.V.Patel Institute of Technology-Diploma studies
Drilling and sampling in foundation engineering
SUBGRADE HOW TO DEAL WITH SOFT SPOTS
Residential Foundations
Beach Erosion and Reclamation
Residential Foundations
WEATHERING You start with hard, solid rock. Slowly, this rock breaks down into smaller pieces (weathering). Most of the time, this breakdown occurs when.
Hard Engineering Case Study
DISASTER PREPAREDNESS: A case of Masinga Flooding
People and coastlines.
Is Engineering for Me?.
Presentation transcript:

Biological engineering and gabion constructions in coast protection Part 40 – part 1aa Biological engineering and gabion constructions in coast protection VII-2009 / rev. 2014.02.02 (Part 40, PP 2007, animation+p/r, compr. : 2009.07.26) Copyright notice Unauthorised copying of this presentation as whole or in parts in any form or by any means, electronic, photocopying, recording or otherwise, without prior written permision is prohibited. ready

Family and company history in civil engineering NAJDER engineering® is a consulting company as well as a specialist contractor within civil and foundation engineering. We are preparing technical concepts, design projects, analyses and performing jobs as a subcontractor. Tomasz Najder joined in the period of 1974-1976 Skånska Cementgjuteriet (today Skanska AB) as a member of Supervising Team on the project “Second Dry Dock in Gdynia Shipyard”. 1983-2002 Tomasz Najder gained his experiences in Stabilator AB (daughter company in Skanska Group) as site manager, project manager and internal consultant (”trouble-shooter”), 1990-1995 as Production Manager (Stabilator AB- International Division in Poland),1995-2001 in Polish-Swedish company Stabilator Sp. z o.o. (Skanska Group) as Vice President and Executive Manager. Anna Elżbieta Najder (wife) owned 1991-2002 Polish company Polibeton Sp. o.o. and now Swedish Najder engineering® since 1997 (until 2005 operating as Polimark International) – operating globally. Anna Monika Najder (daughter) together with Tomasz Najder (as the President of the Board and Executive Manager) owned 2002-2009 Polish Najder engineering® operating in Poland. Family Najder is working within mining, tunneling and civil engineering since six generations. ready

Field of activity Foundation engineering and soil investigations. Reinforcement of existing foundations (underpinning) of industrial buildings, housing estates and ancient monuments (piling, anchors, injections). Tunneling, rock stability and soil improvement (deep mixing method, high/low-pressure injection, lime-cement columns). Stabilization of slopes and embankments (geogrids, soil reinforcement, drainage, geotextiles). Sealing of existing embankments, dams, dikes and waste deposits. Flood defense. Biological engineering, gabion constructions, coast protection. Leakage and moisture counteraction (insulations, drainages, sealing injections, dilatation repair) in concrete and brickworks structures. ready 3 3

Coast close to Dziwnówek (Poland) press ready press

Tetrapod and concrete revetment combined with wall (breaker) reflecting storm waves ready

Breakwater (concrete) combined with riprap Breakwater (concrete) press ready

Rozewie by Jastrzębia Góra – protection of the dunes with breakwater (concrete) ready

ready

Rozewie ready

2011 ready

Breakwater (concrete) – on water side natural stones 1991 Breakwater (concrete) – on water side natural stones ready

2007 2008 ready

combined with wall (breaker) reflecting storm waves Groynes combined with wall (breaker) reflecting storm waves ready

Rock revetment (riprap) ready

Rock revetment (riprap) combined with old wooden groynes (note wooden piles from the completely demolished seawall) ready

Nearshore breakwater (riprap sea wall) Breakwater with riprap revetment Timber breakwater and groynes Groynes combined with riprap sea wall ready

Thank You for Your attention! THE END Thank You for Your attention! ready

Welcome to www.najder.se ready

These works had nothing to do with… ready