THE DESIGN CRITERIA FOR WASTEWATER SYSTEMS (30 TAC Chapter 217)

Slides:



Advertisements
Similar presentations
Annual Inspections of First Nation Water and Wastewater Facilities Derek Hill, P.Eng., Senior Engineer Mohammed Karim, P.Eng., Senior Engineer, Water\Wastewater.
Advertisements

The Idaho Department of Environmental Quality Mark Mason, P.E., Engineering Manager Idaho DEQ - Boise Regional Office 1445 North Orchard Boise, ID
TEXAS COMMISSION on ENVIRONMENTAL QUALITY. PROPOSED STUCTURE FOR CHAPTER 217 < Subchapter A Administrative Provisions < Subchapter B Design Bases < Subchapter.
Rules and Records for Generators Manifesting and Transporting Used and Scrap Tires Jaime Garza, Will Wyman, and Jonathan Diaz Texas Commission on Environmental.
On-site Sewage Facility (OSSF) Trends in Texas
Administrative Appeals of Planning Decisions by Groundwater Conservation Districts TWCA 66 th Annual Convention Dallas, Texas March 3-5, 2010 Andrew S.
Title V Site Operating Permits (SOPs)
TCEQ Trade Fair Joel Klumpp Texas Commission on Environmental Quality TCEQ Review Process for Innovative Water Treatment Technologies.
Medical Waste Management Rulemaking Open Participation Meeting Texas Commission on Environmental Quality Waste Permits Division August 18, 2015, Austin.
How to prepare for an Authorized Agent Compliance Review Ronald Hebert Water Section Manager Region 10/ Beaumont (409)
Matthew Udenenwu Waste Permits Division 2015 TCEQ Environmental Trade Fair.
STATUS OF ECOLOGY’S DRAFT FLOW BLENDING POLICY WATER QUALITY PARTNERSHIP MEETING January 20, 2005.
SITE LOCATION AND DESIGN APPROVAL FOR DOMESTIC WASTEWATER TREATMENT WORKS GARY SOLDANO, P.E. SOUTHEAST REGIONAL OFFICE SUPERVISOR TECHNICAL SERVICES UNIT.
Amendments to Orange County Code Chapter 9 (Building & Construction Regulations) Orange County BCC June 16, 2015.
David Dippel, P.G. Frank Zeng, P.E. Waste Permits Division Municipal Solid Waste Permits Section 2015 TCEQ Environmental Trade Fair.
MEDICAL WASTE MANAGEMENT REGULATIONS FOR THE HANDLING, TREATMENT & PROPER DISPOSAL OF MEDICAL WASTE, INCLUDING EBOLA WASTE Daniela Ortiz de Montellano.
Wastewater Treatment Plant # 2 Engineering Services Council Workshop July 8, 2014.
1 There are two types of potential discharges that require permits at our marina facilities: 1) Stormwater and 2) Wastewater. Your facility needs to be.
Duties of the Resident Inspectors at the Texas Low- Level Radioactive Waste Disposal Facility in Andrews County Diane Wakefield, Health Physicist, Resident.
Susan Palachek TCEQ Pollution Prevention & Education.
Texas Commission on Environmental Quality. SUBCHAPTER A GENERAL PROVISIONS SUBCHAPTER B GENERAL REQUIREMENTS FOR THE PRODUCTION, CONVEYANCE, AND USE OF.
Texas Commission on Environmental Quality. SUBCHAPTER A GENERAL PROVISIONS SUBCHAPTER B GENERAL REQUIREMENTS FOR THE PRODUCTION, CONVEYANCE, AND USE OF.
HB 2031 and HB 4097: Marine Seawater Desalination Rulemaking Trade Fair / May 2016 Office of Water Water Availability Division Water Quality Division.
Water Quality/Stormwater Seminar September House Bill 2031 Requires TCEQ to adopt an expedited permitting process for discharge permits for treated.
Potable Reuse in Texas Where Are We Now? Joel Klumpp Texas Commission on Environmental Quality Potable Reuse in Texas Where Are We Now?
Ordinance Amending Chapter 37 of the Orange County Code Orange County Board of County Commissioners Public Hearing April 3, 2012.
WASTEWATER TREATMENT IN BULGARIA STATUS AND CHALANGES ORLIN DIKOV – INFRASTRUCTURE CONSULTANT.
Texas Commission on Environmental Quality
e-Application Occupational Licensing Electronic License Application
David Kurz, P.E. Lead Wastewater Engineer
Wastewater General Permit Updates
New Licensing and Renewal Requirements
2017 Environmental Trade Fair Shannon Gibson
2017 Llano Estacado Regional Water Plan Planning Group Meeting
Industrial & Hazardous Waste Updates and Emerging Issues
Evaluation Grids Evaluation Grids.
Item 8A Authorize staff to establish a new standard operating procedure (SOP) with the authority to waive the sewer tap fee for an incentive period of.
Class I Injection Well Application Issues
THE DESIGN CRITERIA FOR WASTEWATER SYSTEMS (30 TAC Chapter 217)
Water Department has Six Divisions
Industrial and Hazardous Waste Easier, Better, Faster Permitting
TCEQ, Occupational Licensing Wastewater Licensing Overview
Jesse Boultinghouse Waste Permits Division TCEQ Trade Fair May 3, 2016
Annual Inspections of First Nation Water and Wastewater Facilities
Department of Environmental Quality
TCEQ Environmental Trade Fair Austin Convention Center May 3, 2016
Department of Environmental Quality
City Council Meeting August 27, 2018
Regulatory Reform Act (SL ) Periodic review and expiration of existing rules NC Environmental Management Commission March 13, 2014 Jeff Manning.
BAT Work Group.
2018 Environmental Trade Fair Shannon Gibson
Criminal History Background Checks for all TCEQ Licenses
Use of Domestic Reclaimed Water
Alexander Hinz & Kasy Stinson Water Supply Division
Chapter 312 Rule Revisions
Wastewater Permitting Updates
Annual Enforcement Report Overview
THE DESIGN CRITERIA FOR WASTEWATER SYSTEMS (30 TAC Chapter 217)
Indiana Department of Environmental Management Office of Water Quality
PUBLIC WATER SYSTEM PLAN and EXCEPTION REVIEW
THE DESIGN CRITERIA FOR WASTEWATER SYSTEMS (30 TAC Chapter 217)
TOOLS FOR HIGH QUALITY APPLICATIONS (AKA “Streamlining”)
Kasy Stinson Water Supply Division
USES OF DOMESTIC RECLAIMED WATER
Occupational Licensing Requirements
2019 Environmental Trade Fair & Conference Monica Vallin-Baez
Municipal Wastewater Permits
Aquifer Storage and Recovery Recoverability of Injected Water
Rule 5/6/13 Conversion to General Permits
Presentation transcript:

THE DESIGN CRITERIA FOR WASTEWATER SYSTEMS (30 TAC Chapter 217) TCEQ TRADE FAIR 2017 MAY 16, 2017 AUSTIN, TEXAS TCEQ TRADE FAIR 2017 MAY 16, 2017 Louis C. Herrin, III, P.E. Engineer, Water Quality Division 512-239-4552 louis.herrin@tceq.texas.gov Louis C. Herrin, III, P.E. Engineer, Water Quality Division 512-239-4552 louis.herrin@tceq.texas.gov

chapter 217 Subchapter A Subchapter B Subchapter C Subchapter D Administrative Requirements Subchapter A Treatment Facility Design Requirements Subchapter B Conventional Collection Systems Subchapter C Alternative Collection Systems Subchapter D Preliminary Treatment Units Subchapter E Activated Sludge Systems Subchapter F Fixed Film and Filtration Units Subchapter G Natural Treatment Facilities Subchapter H Sludge Treatment Units Subchapter J Chemical Disinfection Subchapter K UV Light Disinfection Subchapter L Safety Subchapter M Subchapter A Administrative Requirements Subchapter B Treatment Facility Design Requirements Subchapter C Conventional Collection Systems Subchapter D Alternative Collection Systems Subchapter E Preliminary Treatment Units Subchapter F Activated Sludge Systems Subchapter G Fixed Film and Filtration Units Subchapter H Natural Treatment Facilities Subchapter J Sludge Treatment Units Subchapter K Chemical Disinfection Subchapter L UV Light Disinfection Subchapter M Safety

chapter 217 Effective December 4, 2015 §217.1 Applicability This chapter applies to any person who proposes to construct, renovate, or re-rate a wastewater collection system or commission permitted wastewater treatment facility… And a picture of the cover of the current design criteria book Effective December 4, 2015

chapter 217 Check the status of your summary transmittal letter. http://www4.tceq.texas.gov/wwdp/ A picture is the web page box that you can check the status of your project.

History of MAJOR CHANGES OF the Wastewater Treatment Design Criteria in Texas The first consolidated design criteria was adopted by Texas State Department of Health on 9/18/1950. This document was revised on 9/11/1961, 9/18/1968, 9/13/1970, 9/1/1974, 6/1/1981, 4/20/1990, 8/28/2008, 12/4/2015 The first consolidated design criteria was adopted by Texas State Department of Health on 9/18/1950. This document was revised on 9/11/1961, 9/18/1968, 9/13/1970, 9/1/1974, 6/1/1981, 4/20/1990, 8/28/2008, 12/4/2015

General Procedure a.       What’s the Summary transmittal letter procedure and what is needed in the letter b.      How to request a variance c.       What type of projects get called in and how often, d.      What’s maintenance and why it doesn’t need to be submitted for review e.      Regions will be looking for approval letters at inspection. A cartoon picture of mailman delivering a letter

General Procedure f. Review procedure regarding TWDB, EAPP g.       We approve on a project basis.  We’ll meet with suppliers/manufacturers to discuss new technology and approaches, but no carte blanche approval letters for technology h.      We meet and provide feedback on pilot studies if requested A picture of a map of the southern Edwards Aquifer Region

Rerating a WWTP Information necessary for rerating a wwtp At least two of flow and influent data Information on how the wwtp is operating Design of the wwtp Picture of a wastewater treatment plant

Water Line vs. Wastewater Line When a project is the installation of a water line that may cross a sewer line, then start with 290.  If it is a sewer line that may cross a water line, then start with 217.  But, coordinate with both rules to ensure that the most stringent directive is followed in cases where there are differences Picture of a collection system

Prohibition What are the prohibitions in the design criteria? How many prohibitions are in the criteria? How can I get a variance to a prohibition? What is the prohibition do we see the most? A picture of a prohibition sign.

General Information Liner certification requirements Trend on small plants (sleds, MBR, IFAS, MBBR) Closure plans Let your permit expire A picture of a part of a wastewater treatment plant being torn down

QUESTIONS? A background picture of a Question Mark?