Some Updates on Mechanics CM-MEC Session Dec J. Lühning, GSI

Slides:



Advertisements
Similar presentations
Panda Solenoid Timelines. General Layout constraints and HOLD POINTS.
Advertisements

Hall C SHMS Fringe Field Analysis Michael Moore Hall C Winter Meeting
The Lightweight Straw Tube Tracker for PANDA Detector at GSI Andrey Sokolov *,1, James Ritman 1, Peter Wintz 1, Paola Gianotti 2, Dario Orecchini 2 1 Institut.
PANDA Mechanical Workshop Backward Endcap Calorimeter Geometry David Rodríguez Piñeiro GSI Darmstadt PANDA Mechanical Workshop GSI
Concept of the PANDA Detector for pp&pA at GSI Physical motivation for hadron physics with pbars The antiproton facility Detector concept Selected simulation.
Guenther Rosner FAIR Design Study, PANDA 3, GSI, 19/1/06 1 PANDA3: Magnet design and integration of detectors Tasks & participants Progress Milestones.
October, 2003 P. Fabbricatore and S. Farinon Spectrometer magnets – Possible layout of cryostat in the end region In order to define the cryostat layout.
1 Status of infrastructure MICE Video Conference, August 17, 2005 Yury Ivanyushenkov Applied Science Division, Engineering and Instrumentation Department.
DH in Hybrid-A and ILD 2014/9/5 Yasuhiro Sugimoto 1.
Experimental hall in Japanese mountain site Y. Sugimoto ILD MDI/Integration 1.
Joint Institute for Nuclear Research Further optimization of the solenoid design A.Efremov, E.Koshurnikov, Yu.Lobanov, A.Makarov, A.Vodopianov GSI, Darmstadt,
Hall D Civil and Detector Progress Elliott Wolin 12-Sep-2002 U. Of Regina Middle of Nowhere Canada.
Preparations in the MICE hall Video Conference 25 th June 09 Tim Hayler Andy Lintern Peter Lau Geoff Barber.
News on PANDA ToF from ITEP (new mechanic design for DRPC based system) ITEP Russia-Panda meeting — April 26-28, 2010, ITEP(Moscow) Alexander Akindinov.
KEK Hiroshi Yamaoka Task list for Magnet/Iron yoke Solenoid magnet Iron yoke Experimental hall and other facilities May 11, ’05.
Hall D Design Status GlueX Collaboration Meeting JLab, Ravi Anumagalla.
Hall D Design Status GlueX Collaboration Meeting JLab, December 11-13, 2003 Ravi Anumagalla.
Overview of the GlueX Tagger and Photon Beamline..
How 3D models and photos are organized in the database ADO-PO meetingTatiana KLIOUTCHNIKOVA.
1 Integration and Milestones Elton Smith Hall D Detector Review October 20-22, 2004.
1 Mice Collaboration Meeting CM33 Glasgow University 25 th – 29 th June 2012 STFC Daresbury Laboratory Electrical Infrastructure Report Authors : Ian Mullacrane.
The Database & what’s next? Andrzej Soltan Institute for Nuclear Studies XXIX PANDA Collaboration Meeting Turin, 15th of June Arkadiusz Chlopik.
Hall D infrastructure and integration Elton Smith Hall D Collaboration Meeting September 9-11, 2004.
Routing of Cables and Tubes at the Target Spectrometer PANDA Mechanics Workshop, April 2015 J. Lühning, GSI Routing at the barrel.
SiD MDI Issues Tom Markiewicz/SLAC Beijing ACFA/GDE Meeting 05 February 2007.
OsC mtg 15/10/2014 MICE Step IV Alan Grant. Content Step IV – Construction Status – Finances – Schedule – Risks – Summary 2.
Vacuum conditions in PANDA pbar-line Alexander Gruber, SMI, Vienna, Austria.
Status of the PANDA Magnet Yoke Presented by E. Koshurnikov GSI, February 7, 2013.
Joint Institute for Nuclear Research Status of the magnet for the PANDA Target Spectrometer Report from Dubna A.Efremov, E.Koshurnikov, Yu.Lobanov, A.Makarov,
S TATUS OF B ARREL D IRC M ECHANICAL D ESIGN S TATUS OF B ARREL D IRC M ECHANICAL D ESIGN Doro Lehmann has started to update barrel DIRC in CATIA based.
Status of the Yoke Interfaces Presented by Evgeny Koshurnikov February 2013.
PANDA Yoke unsolved Interface problems Presented by E. Koshurnikov (Dubna) December 9, 2011, GSI.
/ 11 Updates of PANDA 3D Model CM June 2016 at GSI, MEC Session J. Lühning, GSI Updates for: Panda Hall Target Spectrometer Latest version.
Status of the PANDA Magnet Yoke Presented by E. Koshurnikov GSI, June 26, 2013.
SAMURAI magnet Hiromi SATO SAMURAI Team, RIKEN Requirements Geometry Magnetic field Superconducting coil and cooling system Present status of construction.
GSI Helmholtzzentrum für Schwerionenforschung GmbH Super-FRS magnet configurations.
G. GIRAUDO - D. ORECCHINI Beam-Target line for PANDA – GSI – 4 February 2013 Beam-Target line for PANDA – GSI – 4 February 2013 Central Trackers assembly.
Panda Forward Dipole Magnet design status International Workshop on Antiproton Physics and Technology at FAIR November 2015 Budker Institute of Nuclear.
Miscellaneous about Target Spectrometer PANDA Mechanics Meeting, September 2015 J. Lühning, GSI Space around Barrel Target Platform Cable Routing.
Miscellaneous MEC Topics Mainz, CM September 2016, MEC Session J
PANDA Magnet Iron Yoke Strength Analysis
Status of the forward tracker design
Roller/rail - System for PANDA
Interaction Region and Detector
Update on PANDA solenoid design
Status of the PANDA Magnet mechanics (yoke & cryostat)
Miscellaneous Topics MEC Session, CM March 2017 at GSI J. Lühning, GSI
STRAW TRACKER SYSTEM CAD STATUS :
Platform Design for the Target Spectrometer using Heavy-Weight Rollers J. Lühning, GSI Darmstadt, Three design goals for Platform: Low construction.
Target Spectrometer Updates CM-MEC Session Giessen, March 2015 J
Solenoid Yoke Door-Barrel Connection
- CT INSTALLATION PROCEDURE OVERVIEW -
Present status of the flux return yoke design
Dubna/JINR Status & Plans
Layout of Detectors for CLIC
PANDA Mechanical Design
David Rodríguez Piñeiro GSI Darmstadt PANDA Collaboration Meeting Turin EMC BW Endcap.
Central Tracker Support Frame MEC Session, CM June 2017 at GSI J
Facilities, Assembly, Integration
BINP, Sergey Pivovarov, Panda magnet meeting at GSl, June 07, 2016
Update of experimental hall in Japanese mountain site
Status of the PANDA Magnet
Actual Dimensions in the Forward Spectrometer
EMC BWE PANDA Insertion
Integration and IR Hall
CLEO II Magnet in Hall A for SoLID
SuperB Integration Summary of previous integration sessions.
Status of the PANDA Solenoid Magnet Production in BINP
as a prototype for Super c-tau factory
Chapter 27 Magnetism HW #6 Due Monday, April 15
Presentation transcript:

Some Updates on Mechanics CM-MEC Session Dec. 2014 J. Lühning, GSI Layout of auxiliary platform Set-up on upstream side of Target Spectrometer EDMS status STEP-format: Problem with very fine details Collisions in 3D model

Layout of auxiliary platform Functional specifications for auxiliary platform: Estimated total weight of structure, BE-EMC, instrumented racks, cables: 8 tons Upper level of auxiliary platform 130 cm below beam height Support by wheels (castors), and by hinges at the big TS-upstream platform beam Estimated drag of wheels and cable chains while moving: 5 kN Space for cable chains underneath: width 2 × 75 cm (z-direction), outer loop diameter 80 cm

Set-up on upstream side of Target Spectrometer Four racks (42U) on west side of platform (2 racks stacked), same arrangement on east side (not shown) Upper level of auxiliary platform at y = -130 cm, width: x = ±150 cm Service platform in maintenance position, extension in x: 5.6 m, extension in z: 5.8 m, upper level at y = -130 cm Platform ends at z = -4.3 m, smallest distance to cave wall when passing the gate: 60cm

Status of 3D-models of PANDA components at EDMS (2014-12-05) Component Last update Interaction region 2010 - 12 Target 2013 - 12 MVD 2014 - 11 STT GEM-trackers 2011 - 09 FT1 to FT6 2012 - 10 Barrel-DIRC SciTil ? F-TOF Disc-DIRC 2013 - 10 Barrel-EMC 2014 - 05 FE-EMC 2014 - 09 BE-EMC 2014 - 04 Shashlyk-EMC 2013 - 07 Solenoid coil & cryostat 2010 - 05 Iron yoke 2014 - 02 Dipole magnet 2013 - 11 Muon counters 2012 - 03 Luminosity monitor 2012 - 09 Mechanical integration 2014 - 12 PANDA hall

STEP-format: Problem with very fine details STP-file size 52 MB STP-file size 3 MB Storage efficiency of STEP-format on Part-level not very good. The fewer the details the better the usability. Some parts which are very rich in detail can no more be read by some CAD programs.

Some collisions in 3D model Overview model available here: https://edms.cern.ch/document/1347314/1