ILC10 Beijing Global Design Effort

Slides:



Advertisements
Similar presentations
E. KAKO (KEK) 2010' Sept. 10 KEK Global Design Effort 1 Operational Results from STF-VTS and Cryomodule Tests at KEK Eiji Kako (KEK, Japan)
Advertisements

6/Nov/2012 TTC Meeting 1 Improvement of cavity performance by T-mapping/X-ray-mapping, optical inspection and local grinding Kirk.
KEK cavity status, March 2011 H. Hayano, ALCPG11, WG3, Eugene.
ILC PM Meeting S0 Webex Global Design Effort 1 S0/S1 Next Steps Lutz Lilje GDE.
WG3: Main Linac H. Hayano, C. Nantista, C. Pagani.
E. KAKO (KEK) 2009' Sept. 30 Albuquerque Global Design Effort 1 Cavity Test Items in S1-G Cryomodule Eiji Kako (KEK, Japan)
E. KAKO (KEK) 2010' Sept. 10 KEK Global Design Effort 1 Lorentz Force Detuning Eiji Kako (KEK, Japan)
Jim Kerby, Fermilab for Rongli Geng and the S0 Cavity Team 23 May 2010 Current Status of SCRF Cavity Development SCRF Cavity Technology and Industrialization.
Cavity status; recent KEK activities : Hayano (1) STF CM-1 cavities are; MHI-014: 3-rd VT:36MV/m (finished) MHI-015: 3-rd VT: > 18.4MV/m.
E. KAKO (KEK) 2009' Dec. 22 S1-G Webex meeting Global Design Effort 1 Final Results of KEK Cavities for S1-Global Eiji Kako (KEK, Japan)
Status of cavity fabrication facility at KEK H. Hayano, KEK Cavity Industrialization Study at KEK Superconducting RF Cavity Technology and Industrialization.
Summary of Main Linac SCRF-part H. Hayano, ILC08 at UIC.
Detail discussion of S1 Global at STF H. Hayano (KEK) GDE Mar 3-6, 2008.
STF EP, VT commissioning by FNAL AES001 H. Hayano, KEK
Superconducting rf test facility STF 1 Optical Inspection update at KEK Ken Watanabe ( KEK ) ILWS08 in Chicago 17-Nov-08.
Field emission issue and strategy to improve H. Hayano.
S.Noguchi (KEK) ILC08 Chicago , Nov . 17, Cavity Package Test in STF STF Phase-1 E. Kako, S. Noguchi, H. Hayano, T. Shishido, M. Sato, K. Watanabe,
Experimental Comparison at KEK of High Gradient Performance of Different Single Cell Superconducting Cavity Designs. F. Furuta, K. Saito, T. Saeki, H.
Cavity Gradient for the R&D and ILC Operation Akira Yamamoto ILC-GDE SCRF Presented at the AD&I meeting held at DESY, Dec. 2-3, 2009 A, Yamamoto,
E. KAKO (KEK) 2010' Feb. 05 STF Meeting for S1-G Global Design Effort 1 Preparation Status at KEK for S1-Global Eiji Kako (KEK, Japan)
R.L. Geng, KEK September 9, 2010 Global Design Effort 1 Near Term ILC Gradient R&D R&D Specification and Standardization Gradient Gradient Yield/Scatter.
1 E. KAKO (KEK) 2012' May 28 Clermont 1 A_RD_03 R/D for the High Power Couplers for ILC Walid KAABI (LAL-Orsay, France) Eiji KAKO (KEK, Japan)
Parallel session summary ML/SCRF L. Lilje, H. Hayano, N. Ohuchi, S. Fukuda, C. Adolphsen (with help of Chris Nantista) TILC09,
Global Design Effort 1 S0 Status High-Gradient cavities Lutz Lilje DESY supplement by H. Hayano 04Sep2008 EC
Cavity status; recent KEK activities : Hayano (1)STF CM-1 cavities are; MHI MV/m for CM-1 ILC cryomodule (3-rd VT) MHI MV/m for.
R.L. Geng, 5/27-31,2013 ECFA LC2013, DESY 1 Update on Raising Q0 at Ultra-High Gradient via Large-Grain Niobium Material Rongli Geng Jefferson Lab ECFA.
Rongli Geng March 4, th LCC ILC Cavity Group Meeting
SRF Processing at ANL: Progress and Plans ANL: Mike Kelly, Scott Gerbick FNAL: Dan Olis, Allan Rowe Speaker: Mike Kelly November 17, 2008.
1.Report from PMs 2.Report from GLs 3.Special report and discussions 1.SCRF report at AAP and response from AAP (C. Ginsburg, R. Geng) 2.S1-Global assembly.
E. KAKO (KEK) 2010' Nov. 02 S1-G Webex meeting Global Design Effort 1.
CRAB for HL-LHC KEK activity 2010DEC Yoshiyuki MORITA.
Superconducting rf test facility LCWS 2010 in Beijing, 28 Mar 2010, Ken Watanabe Replica-method and local grinding repair K. Watanabe (KEK) LCWS 2010 in.
(1)[12~13/Dec/2009] Optical inspection (2)[14/Dec] frequency & field flatness measurement (3)[10/Mar/2010] pre-EP (5μm) (4)[11/Mar] EP1 (100μm) (5)[11/Mar]
E. KAKO (KEK) 2009' Oct. 26 ILC KEK Global Design Effort 1 Cavity Preparation for S1-Global Eiji Kako (KEK, Japan)
HiGrade-Kickoff DESY Global Design Effort 1 ILC-HiGrade WP6 High-Gradient cavities Lutz Lilje DESY.
KEK-STF Vertical Test and Diagnostics Brief History & Future Plan Vertical Test Facility Cavity Diagnostic System Example of MHI#7 Cavity Summary of T-mapping.
Current study status of high gradient at KEK Fumio Furuta KEK SCRF meeting Fermilab. Apr
2 nd Workshop of the IHEP 1.3 GHz SRF R&D Project and 2nd IHEP-KEK 1.3 GHz SRF Meeting Opening Remark J. Gao December 2-3, 2009, IHEP, Beijing, China.
IHEP GHz 9-cell Cavity R&D Status and Plan The Third IHEP-KEK 1.3GHz SC Technology Collaboration Meeting Dec. 7-8, 2010, IHEP, Beijing GAO Jie,
Recent Results of Vertical Test for S1-Global Project at KEK-STF Y. Yamamoto, H. Hayano, E. Kako, S. Noguchi, H. Sakai, M. Satoh, T. Shishido, K. Umemori,
Explosive Events during V.T. in KEK ECFA (2013/5/30) 1.
ILC Gradient R&D Rongli Geng Jefferson Lab ILC Main Linac WebEx Meeting July 28, 2010.
JLab Update Rongli Geng April 30, th LCC ILC Cavity Group Meeting.
Summary of Results and Development of Online Monitor for T-mapping/X-ray-mapping in KEK-STF Y. Yamamoto, H. Hayano, E. Kako, S. Noguchi, M. Satoh, T. Shishido,
Americas Report C.M. Ginsburg (FNAL) for the FNAL/ANL, JLab, and Cornell (no report this time) cavity teams S0 Meeting 7.June 2011.
Industrialization Studies in the KEK Cavity Fabrication Facility (CFF) H. Hayano The 2nd workshop on SCRF Cavity Technology and Industrialization.
Cornell Updates Commissioning of T-map for ILC single cell starts.
Cavity Gradient R&D Status and Future Plans for TDP-2
Inspection of STF Baseline cavity #5 and #6
for the FNAL/ANL, JLab, and Cornell cavity teams
Input coupler assembly, high power and thermal performance in S1-Global at KEK E. KAKO (KEK) 2011' Dec. 07 TTC meeting in Beijing.
S0 Status report from KEK
Effort Torwards Improving Large Scale Production for SC Cavities
Magnetic shields inside and outside LHe tank in S1-Global cryomodule assembly at KEK E. KAKO (KEK) 2011' Dec. 07 TTC meeting in Beijing.
Production Cavities in progress
Cost reduction activities in cavity fabrication at MHI
Jiyuan Zhai ( IHEP ) TTC Meeting, JLAB, 6 Nov 2012
Y. Yamamoto, H. Hayano, E. Kako, S. Noguchi, M. Sato, T. Shishido, K
Recent VT Results in the STF-2 cavities
2. SCRF General Preparation for the AD&I Preparation for AAP Review
Progress in Asia Hitoshi Hayano,KEK,
Vertical Test System and T-mapping/X-ray-mapping at KEK-STF
WG3: Main Linac SCRF(cavity,cryomodule)
KEK injector cryomodule
IHEP Cryomodule Status
Construction and First Coo-down Test of cERL Injector Cryomodule
CEPC Waveguide HOM 5-cell and 2-cell Cavity Study and EP Facility
TTC meeting, Milano Global Design Effort
Cavity Degradation Experience at S1-Global
Cavity & Cavity Integration; recent KEK activities
Presentation transcript:

ILC10 GDE @ Beijing Global Design Effort Recent Vertical Test Results of KEK Cavities E. Kako, S. Noguchi, H. Hayano, M. Satoh, T. Shishido, K. Watanabe, Y. Yamamoto (STF Cavity Group, KEK) E. KAKO (KEK) 2010' Mar. 28 ILC10 GDE @ Beijing Global Design Effort

ILC10 GDE @ Beijing Global Design Effort Outline 1. Cavities and Surface Preparation 2. Summary of Vertical Test Results Outlook of the next cavities Summary Inspection and T-map results will be presented in the other talks by K. Watanabe and Y. Yamamoto. E. KAKO (KEK) 2010' Mar. 28 ILC10 GDE @ Beijing Global Design Effort

ILC10 GDE @ Beijing Global Design Effort Five KEK Cavities for S-1 Global MHI-07 Cavity MHI-08 Cavity MHI-09 Cavity MHI-05 Cavity MHI-06 Cavity Delivery in 2008’ March Delivery in 2009’ March E. KAKO (KEK) 2010' Mar. 28 ILC10 GDE @ Beijing Global Design Effort

ILC10 GDE @ Beijing Global Design Effort Surface Preparation for KEK Cavities No Barrel Polishing, EP + HPR + Assembly @ STF preEP(5mm) + First EP (100mm) + HT at 750oC for 3 h --- Surface Inspection in each step --- MHI-05 ; I. EP(50)+H2O2 II. EP(50)+H2O2 III. EP(20)+C2H5OH MHI-06 ; I. EP(50)+H2O2 II. (Mag. shield) III. (Mag. shield) IV. EP(50)+H2O2 V. EP(20)+C2H5OH VI. EP(20)+C2H5OH MHI-07 ; I. EP(20)+C2H5OH II. EP(20)+Degreaser MHI-08 ; I. EP(20)+C2H5OH II. EP(20)+Degreaser III. EP(20)+Degreaser IV. EP(20, LCD)+ Degreaser MHI-09 ; I. EP(20)+C2H5OH II. EP(20)+Degr. III. EP(20)+Degr. ? Comparison of Rinsing by H2O2, C2H5OH, Degreaser E. KAKO (KEK) 2010' Mar. 28 ILC10 GDE @ Beijing Global Design Effort

ILC10 GDE @ Beijing Global Design Effort Summary of V.T. in Five KEK Cavities 18 Cavity Tests in 5 Cavities ?? Degradation after successive surface treatment EP (Low current density) Field Emission due to brown stains E. KAKO (KEK) 2010' Mar. 28 ILC10 GDE @ Beijing Global Design Effort

ILC10 GDE @ Beijing Global Design Effort Summary of V.T. in Five KEK Cavities 18 Cavity Tests in 5 Cavities ?? No clear relation with rinsing effect ?? E. KAKO (KEK) 2010' Mar. 28 ILC10 GDE @ Beijing Global Design Effort

ILC10 GDE @ Beijing Global Design Effort Final V.T. Results of Five KEK Cavities Target for ILC Limitation of radiation sensor E. KAKO (KEK) 2010' Mar. 28 ILC10 GDE @ Beijing Global Design Effort

ILC10 GDE @ Beijing Global Design Effort Eacc,max (cell) by Passbands modes Meas. Quench by Field emission MHI-06 6th MHI-05 3rd Quench p mode; Eacc,max = 27.7 MV/m p mode; Eacc,max = 27.1 MV/m Quench Quench MHI-07 2nd MHI-09 3rd p mode; Eacc,max = 33.6 MV/m p mode; Eacc,max = 27.0 MV/m MHI-08 4th all cells > 40 MV/m E. KAKO (KEK) 2010' Mar. 28 ILC10 GDE @ Beijing Global Design Effort

ILC10 GDE @ Beijing Global Design Effort Eacc,max of each cell in Five Cavities Total 45 cells in 5 Cavities 93 % > 30 MV/m 58 % > 35 MV/m MHI-07 9 cell MHI-08 MHI-05 5 cell MHI-06 8 cell MHI-09 2 cell E. KAKO (KEK) 2010' Mar. 28 ILC10 GDE @ Beijing Global Design Effort

ILC10 GDE @ Beijing Global Design Effort Final V.T. Results of 9 KEK Cavities 4 MHI cavities for STF-1 ave. Eacc,max = 22.7 MV/m (2006, Feb. ~ 2007, Feb.) 5 MHI cavities for S1-G ave. Eacc,max = 30.6 MV/m (2008, Dec. ~ 2010, Feb.) E. KAKO (KEK) 2010' Mar. 28 ILC10 GDE @ Beijing Global Design Effort

ILC10 GDE @ Beijing Global Design Effort All V.T. Results of 9 KEK Cavities STF-1 S1-Global Ave. 31 MV/m Ave. 23 MV/m S0 2010’ April May E. KAKO (KEK) 2010' Mar. 28 ILC10 GDE @ Beijing Global Design Effort

ILC10 GDE @ Beijing Global Design Effort Plan of V.T. in the next Cavities MHI-10 ; for S0 (VT in 2010’Apr. – July)  go to JLab MHI-11 ; for S0 (VT in 2010’May – July)  go to JLab MHI-12 ; for Capture Cryomodule (VT in 2010’Sept.- Dec.) MHI-13 ; for Capture Cryomodule (VT in 2010’Sept.- Dec.) MHI-14 ~ 22 ; for STF-2 #1Cryomodule (VT in 2011’Mar. – 2012’Feb.) R & D Cavities (without HOM couplers) Hitachi-01 ; will be completed in 2010’April Toshiba-01; will be completed in 2010’ May IHEP-01 ; (Large grain niobium, Low-loss shape) will be delivered at KEK in 2010’May E. KAKO (KEK) 2010' Mar. 28 ILC10 GDE @ Beijing Global Design Effort

ILC10 GDE @ Beijing Global Design Effort SUMMARY Obtained Eacc,max in 5 KEK-MHI cavities were ave. 30.6 MV/m. Eacc,max > 35 (30) MV/m were achieved in 58 (93) % of 45 cells in 5 cavities. Qo values at 25 MV/m was less than 1x 1010 due to field emission in 5 cavities. Suppression of field emission at higher gradients is essential to attain 8x109 at 35 MV/m, target in ILC. Vertical tests of the next MHI cavities and R&D cavities are planed in 2010’- 2012’, and they will be a very tight schedule. E. KAKO (KEK) 2010' Mar. 28 ILC10 GDE @ Beijing Global Design Effort